Professional Documents
Culture Documents
Standard Price List: Office of The Provincial Engineer
Standard Price List: Office of The Provincial Engineer
Standard Price List: Office of The Provincial Engineer
PROVINCE OF PAMPANGA
City of San Fernando
OFFICE OF THE PROVINCIAL ENGINEER
STANDARD PRICE LIST
(As of November 2015)
Page 1 of 1
GA
ENGINEER
IST
PCCP:
3.0m to 4.0m width PCC 18% - 20% Labor
Pavement incl. equipment
Page 1 of 1
ETERNITY
Page 1 of 1
Republic of the Philippines
PROVINCE OF PAMPANGA
City of San Fernando
OFFICE OF THE PROVINCIAL ENGINEER
STANDARD PRICE LIST
(As of November 2015)
Page 3 of 12
Steel Works: Unit Cost
Angle Bar 3"x 3"x 6.0mm x 6m
Angle Bar 3"x 3"x 5.0mm x 6m
Angle Bar 3"x 3"x 4.50mm x 6m
Angle Bar 3"x 3"x 3.50mm x 6m
Angle Bar 2-1/2"x 2-1/2"x 6.0mm x 6m
Angle Bar 2-1/2"x 2-1/2"x 5.0mm x 6m
Angle Bar 2-1/2"x 2-1/2"x 4.50mm x 6m
Angle Bar 2-1/2"x 2-1/2"x 3.50mm x 6m
Angle Bar 2"x 2"x 6.0mm x 6mm
Angle Bar 2"x 2"x 5.0mm x 6mm
Angle Bar 2"x 2"x 4.50mm x 6m
Angle Bar 2"x 2"x 3.50mm x 6m
Angle Bar 1-1/2"x 1-1/2"x 6.0mm x 6m
Angle Bar 1-1/2"x 1-1/2"x 5.0mm x 6m
Angle Bar 1-1/2"x 1-1/2"x 4.50mm x 6m
Angle Bar 1-1/2"x 1-1/2"x 3.50mm x 6m
Tubular 2" x 6" x 1.5mm x 6.00m (pc)
Tubular 2" x 6" x 1.2mm x 6.00m (pc)
Tubular 2" x 4" x 1.5mm x 6.00m (pc)
Tubular 2" x 4" x 1.2mm x 6.00m (pc)
Tubular 2" x 3" x 1.2mm x 6.00m (pc)
Tubular 2" x 2" x 1.2mm x 6.00m (pc)
Tubular 1" x 2" x 1.2mm x 6.00m (pc)
Tubular 1" x 1" x 1.2mm x 6.00m (pc)
3" Ø G. I. Pipe Sch. 40
2" Ø G. I. Pipe Sch. 40
1 1/2" Ø G. I. Pipe Sch. 40
1" Ø G. I. Pipe Sch. 40
2" Ø Stainless Pipe
1 1/2" Ø Stainless Pipe
1" Ø Stainless Pipe
Doors: Unit Cost
1.00m x 2.10m Panel Door w/ 2" x 6" KD Galvanized
Jamb (set)
0.90m x 2.10m Panel Door w/ 2" x 6" KD Galvanized
Jamb (set)
0.80m x 2.10m Panel Door w/ 2" x 6" KD Galvanized
Jamb (set)
0.80m x 2.10m Panel Door w/ 2" x 5" KD Galvanized
Jamb (set)
1.00m x 2.10m Panel Door w/ door jamb (galvanized)
(set)
Unit Cost
Noted By:
OLIMPIO M. PANGAN
OIC - Provincial Engineer's Office
1800
12
8.8
7.8
90/KL 90/KL 65
1,550.00 75/KL 1500 1620 1500
159.00 147 65.71429 2625
230.00
408.00 369
945.00
797.00
722.00
573.00
498.00
450.00
310.00
540.00
431.00
324.00
243.00
250.00
155.00
1,980.00
950.00
730.00
595.00
490.00
360.00
240.00
765.00
575.00
510.00
460.00
400.00
4,116.00
2,785.00
1,645.00
1,207.00
745.00
13,450.00
11,200.00
6,700.00
300.00 410
540.00 770
1300
375.00 440
660.00 840
1,100.00 1430
885.00 1000
1,235.00 1280
Republic of the Philippines
481.44 514.605
339.966 384.5205
311.61 417.0075
261.63 313.9159
240.72
160.14
Republic of the Philippines
PROVINCE OF PAMPANGA
City of San Fernando
OFFICE OF THE PROVINCIAL ENGINEER
STANDARD PRICE LIST
(As of December 2018)
149.00
214.00
267.00
320.00
379.00
474.00
569.00
593.00
741.00
Page 1 of 1
889.00
Page 1 of 1
GA
ENGINEER
IST
PCCP:
3.0m to 4.0m width PCC 18% - 20% Labor
Pavement incl. equipment
Page 1 of 1
ETERNITY
Page 1 of 1