Analisa - Pondasi - Beton - Siklop
Analisa - Pondasi - Beton - Siklop
PEKERJAAN STRUKTUR
A. LANTAI DASAR
A.1 PEKERJAAN STRUKTUR BAWAH
1 P- 1 = 12 unit
- Beton K-250 24.30 M3 763,400.00 18,550,620.00 763,400.00 0.00 0.00 24.30 763,400.00 18,550,620.00
- Besi beton 3,586.60 Kg 9,844.00 35,306,501.83 9,844.00 0.00 0.00 3,586.60 9,844.00 35,306,501.83
- Bekisting 43.20 M2 59,932.00 2,589,062.40 59,932.00 0.00 0.00 43.20 59,932.00 2,589,062.40
1 P- 1A = 12 unit
- Beton K-250 30.00 M3 763,400.00 22,902,000.00 763,400.00 0.00 0.00 30.00 763,400.00 22,902,000.00
- Besi beton 4,223.01 Kg 9,844.00 41,571,286.71 9,844.00 0.00 0.00 4,223.01 9,844.00 41,571,286.71
- Bekisting 62.40 M2 59,932.00 3,739,756.80 59,932.00 0.00 0.00 62.40 59,932.00 3,739,756.80
2 P- 2 = 6 unit
- Beton K-250 20.40 M3 763,400.00 15,573,360.00 763,400.00 0.00 0.00 20.40 763,400.00 15,573,360.00
- Besi beton 4,064.42 Kg 9,844.00 40,010,106.33 9,844.00 0.00 0.00 4,064.42 9,844.00 40,010,106.33
- Bekisting 30.00 M2 59,932.00 1,797,960.00 59,932.00 0.00 0.00 30.00 59,932.00 1,797,960.00
2 P- 2A = 4 unit
- Beton K-250 15.30 M3 763,400.00 11,680,020.00 763,400.00 0.00 0.00 15.30 763,400.00 11,680,020.00
- Besi beton 2,837.93 Kg 9,844.00 27,936,560.07 9,844.00 0.00 0.00 2,837.93 9,844.00 27,936,560.07
- Bekisting 20.80 M2 59,932.00 1,246,585.60 59,932.00 0.00 0.00 20.80 59,932.00 1,246,585.60
3 P3 =2 unit
- Beton K-250 2.45 M3 763,400.00 1,870,330.00 763,400.00 0.00 0.00 2.45 763,400.00 1,870,330.00
- Besi beton 577.48 Kg 9,844.00 5,684,708.36 9,844.00 0.00 0.00 577.48 9,844.00 5,684,708.36
- Bekisting 5.60 M2 59,932.00 335,619.20 59,932.00 0.00 0.00 5.60 59,932.00 335,619.20
4 Kolom Pedestial K1& K2 : 30x45
- Beton K-250 8.64 M3 763,400.00 6,595,776.00 3.46 763,400.00 2,641,364.00 0.00 12.10 763,400.00 9,237,140.00
- Besi beton 1,963.62 Kg 9,844.00 19,329,850.52 493.67 9,844.00 4,859,687.48 0.00 2,457.29 9,844.00 24,189,538.00
- Bekisting 96.00 M2 167,213.00 16,052,448.00 46.08 167,213.00 7,705,175.04 0.00 142.08 167,213.00 23,757,623.04
5 Kolom Pedestial K3 : 35x35
- Beton K-250 1.18 M3 763,400.00 897,758.40 0.59 763,400.00 450,406.00 0.00 1.77 763,400.00 1,348,164.40
- Besi beton 324.21 Kg 9,844.00 3,191,482.54 75.13 9,844.00 739,579.72 0.00 399.34 9,844.00 3,931,062.26
- Bekisting 13.44 M2 167,213.00 2,247,342.72 8.16 167,213.00 1,364,458.08 0.00 21.60 167,213.00 3,611,800.80
6 Tie Beam / Sloof TB 25X45 L = 5,5 m, unit : 20 bh
- Beton K-250 11.70 M3 763,400.00 8,931,780.00 763,400.00 0.00 0.00 11.70 763,400.00 8,931,780.00
- Besi beton 2,476.08 Kg 9,844.00 24,374,579.55 9,844.00 0.00 0.00 2,476.08 9,844.00 24,374,579.55
- Bekisting 134.00 M2 141,636.00 18,979,224.00 141,636.00 0.00 0.00 134.00 141,636.00 18,979,224.00
7 Tie Beam / Sloof TB 25X45 L = 3.8 m, unit : 2 bh
- Beton K-250 0.79 M3 763,400.00 601,177.50 763,400.00 0.00 0.00 0.79 763,400.00 601,177.50
- Besi beton 175.52 Kg 9,844.00 1,727,827.46 9,844.00 0.00 0.00 175.52 9,844.00 1,727,827.46
- Bekisting 12.55 M2 141,636.00 1,777,531.80 141,636.00 0.00 0.00 12.55 141,636.00 1,777,531.80
8 Tie Beam / Sloof TB 25X45 L = 4 m, unit : 29 bh
- Beton K-250 12.07 M3 763,400.00 9,215,192.25 763,400.00 0.00 0.00 12.07 763,400.00 9,215,192.25
- Besi beton 2,649.26 Kg 9,844.00 26,079,292.91 9,844.00 0.00 0.00 2,649.26 9,844.00 26,079,292.91
- Bekisting 183.43 M2 141,636.00 25,979,583.30 141,636.00 0.00 0.00 183.43 141,636.00 25,979,583.30
9 Tie Beam / Sloof TB 25X45 L = 2.25 m, unit : 10 bh
- Beton K-250 1.97 M3 763,400.00 1,502,943.75 763,400.00 0.00 0.00 1.97 763,400.00 1,502,943.75
- Besi beton 506.37 Kg 9,844.00 4,984,724.01 9,844.00 0.00 0.00 506.37 9,844.00 4,984,724.01
- Bekisting 58.38 M2 141,636.00 8,268,001.50 141,636.00 0.00 0.00 58.38 141,636.00 8,268,001.50
10 Tie Beam / Sloof TB 25X45 L = 2.5 m, unit : 6 bh
- Beton K-250 1.49 M3 763,400.00 1,133,649.00 763,400.00 0.00 0.00 1.49 763,400.00 1,133,649.00
- Besi beton 359.85 Kg 9,844.00 3,542,395.92 9,844.00 0.00 0.00 359.85 9,844.00 3,542,395.92
- Bekisting 35.70 M2 141,636.00 5,056,405.20 141,636.00 0.00 0.00 35.70 141,636.00 5,056,405.20
11 Tie Beam / Sloof TB 25X45 L = 2.35 m, unit : 2 bh
- Beton K-250 0.46 M3 763,400.00 352,118.25 763,400.00 0.00 0.00 0.46 763,400.00 352,118.25
- Besi beton 113.95 Kg 9,844.00 1,121,680.35 9,844.00 0.00 0.00 113.95 9,844.00 1,121,680.35
- Bekisting 11.83 M2 141,636.00 1,674,845.70 141,636.00 0.00 0.00 11.83 141,636.00 1,674,845.70
12 Tie Beam / Sloof TB 25X45 L = 4,7 m, unit : 8 bh
- Beton K-250 3.96 M3 763,400.00 3,023,064.00 763,400.00 0.00 0.00 3.96 763,400.00 3,023,064.00
- Besi beton 852.25 Kg 9,844.00 8,389,583.63 9,844.00 0.00 0.00 852.25 9,844.00 8,389,583.63
- Bekisting 52.00 M2 141,636.00 7,365,072.00 141,636.00 0.00 0.00 52.00 141,636.00 7,365,072.00
NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN TOTAL PEK.TAMBAH TOTAL PEK.KURANG HARGA SATUAN JUMLAH HARGA
VOLUME UNIT (Rp) (Rp) (Rp)
VOLUME
( Rp ) ( Rp )
( Rp. ) ( Rp. ) TAMBAH KURANG
11 Galian tanah dibawah Pondasi
P- 1 = 12 unit 150.00 M3 38,700.00 5,805,000.00 37.50 52,275.00 1,960,312.50 0.00 187.50 52,275.00 9,801,562.50
P- 1A = 12 unit 181.50 M3 38,700.00 7,024,050.00 45.38 52,275.00 2,372,239.50 0.00 226.88 52,275.00 11,860,152.00
P- 2 = 6 unit 121.50 M3 38,700.00 4,702,050.00 33.75 52,275.00 1,764,281.25 0.00 155.25 52,275.00 8,115,693.75
P- 2A = 4 unit 90.00 M3 38,700.00 3,483,000.00 20.25 52,275.00 1,058,568.75 0.00 110.25 52,275.00 5,763,318.75
P3 =2 unit 12.25 M3 38,700.00 474,075.00 4.00 52,275.00 209,100.00 0.00 16.25 52,275.00 849,468.75
12 Galian tanah dibawah Tie- beam
Tie Beam / Sloof TB 25X45 L = 5,5 m, unit : 20 bh 12.04 M3 31,500.00 379,181.25 12.04 31,500.00 0.00 379,181.25 - 31,500.00 0.00
Tie Beam / Sloof TB 25X45 L = 3.8 m, unit : 2 bh 0.82 M3 31,500.00 25,869.38 0.82 31,500.00 0.00 25,869.38 - 31,500.00 0.00
Tie Beam / Sloof TB 25X45 L = 4 m, unit : 29 bh 16.42 M3 31,500.00 517,269.38 16.42 31,500.00 0.00 517,269.38 - 31,500.00 0.00
Tie Beam / Sloof TB 25X45 L = 2.25 m, unit : 10 bh 2.81 M3 31,500.00 88,593.75 2.81 31,500.00 0.00 88,593.75 - 31,500.00 0.00
Tie Beam / Sloof TB 25X45 L = 2.5 m, unit : 6 bh 2.50 M3 31,500.00 78,671.25 2.50 31,500.00 0.00 78,671.25 - 31,500.00 0.00
Tie Beam / Sloof TB 25X45 L = 2.35 m, unit : 2 bh 0.69 M3 31,500.00 21,616.88 0.69 31,500.00 0.00 21,616.88 - 31,500.00 0.00
Tie Beam / Sloof TB 25X45 L = 4,7 m, unit : 8 bh 4.86 M3 31,500.00 153,090.00 4.86 31,500.00 0.00 153,090.00 - 31,500.00 0.00
13 Urug pasir dibawah Pondasi
P- 1 = 12 unit 6.08 M3 192,600.00 1,170,045.00 192,600.00 0.00 0.00 6.08 192,600.00 1,170,045.00
P- 1A = 12 unit 7.50 M3 192,600.00 1,444,500.00 192,600.00 0.00 0.00 7.50 192,600.00 1,444,500.00
P- 2 = 6 unit 5.10 M3 192,600.00 982,260.00 192,600.00 0.00 0.00 5.10 192,600.00 982,260.00
P- 2A = 4 unit 3.83 M3 192,600.00 736,695.00 192,600.00 0.00 0.00 3.83 192,600.00 736,695.00
P3 =2 unit 0.61 M3 192,600.00 117,967.50 192,600.00 0.00 0.00 0.61 192,600.00 117,967.50
14 Urug pasir dibawah Tie Beam t=10 cm
Tie Beam / Sloof TB 25X45 L = 5,5 m, unit : 20 bh 2.75 M3 192,600.00 529,650.00 192,600.00 0.00 0.00 2.75 192,600.00 529,650.00
Tie Beam / Sloof TB 25X45 L = 3.8 m, unit : 2 bh 0.19 M3 192,600.00 36,594.00 192,600.00 0.00 0.00 0.19 192,600.00 36,594.00
Tie Beam / Sloof TB 25X45 L = 4 m, unit : 29 bh 2.90 M3 192,600.00 558,540.00 192,600.00 0.00 0.00 2.90 192,600.00 558,540.00
Tie Beam / Sloof TB 25X45 L = 2.25 m, unit : 10 bh 0.44 M3 192,600.00 84,262.50 192,600.00 0.00 0.00 0.44 192,600.00 84,262.50
Tie Beam / Sloof TB 25X45 L = 2.5 m, unit : 6 bh 0.68 M3 192,600.00 130,005.00 192,600.00 0.00 0.00 0.68 192,600.00 130,005.00
Tie Beam / Sloof TB 25X45 L = 2.35 m, unit : 2 bh 0.94 M3 192,600.00 181,044.00 192,600.00 0.00 0.00 0.94 192,600.00 181,044.00
Tie Beam / Sloof TB 25X45 L = 4,7 m, unit : 8 bh 0.12 M3 192,600.00 22,630.50 192,600.00 0.00 0.00 0.12 192,600.00 22,630.50
15 Lantai kerja dibawah Pile Cap t=5 cm
P- 1 = 12 unit 3.04 M3 555,800.00 1,688,242.50 555,800.00 0.00 0.00 3.04 555,800.00 1,688,242.50
P- 1A = 12 unit 3.75 M3 555,800.00 2,084,250.00 555,800.00 0.00 0.00 3.75 555,800.00 2,084,250.00
P- 2 = 6 unit 2.55 M3 555,800.00 1,417,290.00 555,800.00 0.00 0.00 2.55 555,800.00 1,417,290.00
P- 2A = 4 unit 1.91 M3 555,800.00 1,062,967.50 555,800.00 0.00 0.00 1.91 555,800.00 1,062,967.50
P3 =2 unit 0.31 M3 555,800.00 170,213.75 555,800.00 0.00 0.00 0.31 555,800.00 170,213.75
16 Lantai kerja dibawah Tie Beam t=5 cm
Tie Beam / Sloof TB 25X45 L = 5,5 m, unit : 20 bh 1.38 M3 555,800.00 764,225.00 555,800.00 0.00 0.00 1.38 555,800.00 764,225.00
Tie Beam / Sloof TB 25X45 L = 3.8 m, unit : 2 bh 0.10 M3 555,800.00 52,801.00 555,800.00 0.00 0.00 0.10 555,800.00 52,801.00
Tie Beam / Sloof TB 25X45 L = 4 m, unit : 29 bh 1.45 M3 555,800.00 805,910.00 555,800.00 0.00 0.00 1.45 555,800.00 805,910.00
Tie Beam / Sloof TB 25X45 L = 2.25 m, unit : 10 bh 0.22 M3 555,800.00 121,581.25 555,800.00 0.00 0.00 0.22 555,800.00 121,581.25
Tie Beam / Sloof TB 25X45 L = 2.5 m, unit : 6 bh 0.34 M3 555,800.00 187,582.50 555,800.00 0.00 0.00 0.34 555,800.00 187,582.50
Tie Beam / Sloof TB 25X45 L = 2.35 m, unit : 2 bh 0.47 M3 555,800.00 261,226.00 555,800.00 0.00 0.00 0.47 555,800.00 261,226.00
Tie Beam / Sloof TB 25X45 L = 4,7 m, unit : 8 bh 0.06 M3 555,800.00 32,653.25 555,800.00 0.00 0.00 0.06 555,800.00 32,653.25
17 Urugan tanah kembali bekas galian 564.26 M3 12,900.00 7,279,002.38 140.88 12,900.00 1,817,352.00 0.00 705.14 12,900.00 9,096,354.38
18 Tanah urug peninggian lantai t=45 cm (dalam bangunan) 265.59 M3 49,700.00 13,199,823.00 384.01 49,700.00 19,085,297.00 0.00 649.60 49,700.00 32,285,120.00
19 Pasir urug diatas tanah urug t=10 cm (dalam bangunan) 59.02 M3 192,600.00 11,367,252.00 192,600.00 0.00 0.00 59.02 192,600.00 11,367,252.00
20 Beton Cyclop Diameter 80 cm, Unit : 192 bh M3 - 48.23 633,306.50 30,544,372.50 0.00 48.23 633,306.50 30,544,372.50
Pengadaan dan pemasangan buis beton Ø 80 cm x 50 cm
21 bh 192.00
101,524.00 19,492,608.00 192.00 101,524.00 19,492,608.00
Sub Jumlah A-1 512,431,488.06 96,064,801.82 1,264,291.88 614,769,516.75
NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN TOTAL PEK.TAMBAH TOTAL PEK.KURANG HARGA SATUAN JUMLAH HARGA
VOLUME UNIT (Rp) (Rp) (Rp)
VOLUME
( Rp ) ( Rp )
( Rp. ) ( Rp. ) TAMBAH KURANG
Balok BB dim.20x45, L = 4 m
- Beton K-250 0.46 M3 763,400.00 348,110.40 763,400.00 0.00 0.00 0.46 763,400.00 348,110.40
- Besi beton 113.81 Kg 9,844.00 1,120,394.49 9,844.00 0.00 0.00 113.81 9,844.00 1,120,394.49
- Bekisting 6.08 M2 170,708.00 1,037,904.64 170,708.00 0.00 0.00 6.08 170,708.00 1,037,904.64
Balok BB dim.20x45, L = 2 m
- Beton K-250 0.18 M3 763,400.00 137,412.00 763,400.00 0.00 0.00 0.18 763,400.00 137,412.00
- Besi beton 57.13 Kg 9,844.00 562,404.64 9,844.00 0.00 0.00 57.13 9,844.00 562,404.64
- Bekisting 2.40 M2 170,708.00 409,699.20 170,708.00 0.00 0.00 2.40 170,708.00 409,699.20
Konstruksi WF.250.125.6.9 1,031.58 Kg 12,076.00 12,457,392.93 12,076.00 0.00 0.00 1,031.58 12,076.00 12,457,392.93
Base Plate tebal 5 mm 98.13 Kg 12,076.00 1,184,957.50 12,076.00 0.00 0.00 98.13 12,076.00 1,184,957.50
Baut dia.19 71.19 Kg 15,000.00 1,067,794.68 15,000.00 0.00 0.00 71.19 15,000.00 1,067,794.68
Sub Jumlah A-1 188,638,287.67 0.00 0.00 188,638,287.67
NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN TOTAL PEK.TAMBAH TOTAL PEK.KURANG HARGA SATUAN JUMLAH HARGA
VOLUME UNIT (Rp) (Rp) (Rp)
VOLUME
( Rp ) ( Rp )
( Rp. ) ( Rp. ) TAMBAH KURANG
- Beton K-250 7.10 M3 763,400.00 5,423,193.60 763,400.00 0.00 0.00 7.10 763,400.00 5,423,193.60
- Besi beton 1,155.02 Kg 9,844.00 11,370,031.44 9,844.00 0.00 0.00 1,155.02 9,844.00 11,370,031.44
- Bekisting 88.80 M2 170,708.00 15,158,870.40 170,708.00 0.00 0.00 88.80 170,708.00 15,158,870.40
NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN TOTAL PEK.TAMBAH TOTAL PEK.KURANG HARGA SATUAN JUMLAH HARGA
VOLUME UNIT (Rp) (Rp) (Rp)
VOLUME
( Rp ) ( Rp )
( Rp. ) ( Rp. ) TAMBAH KURANG
3 Balok G1 dim.30x45, L = 5.5 m
- Beton K-250 3.00 M3 763,400.00 2,286,535.68 763,400.00 0.00 0.00 3.00 763,400.00 2,286,535.68
- Besi beton 458.15 Kg 9,844.00 4,509,996.88 9,844.00 0.00 0.00 458.15 9,844.00 4,509,996.88
- Bekisting 37.44 M2 170,708.00 6,391,307.52 170,708.00 0.00 0.00 37.44 170,708.00 6,391,307.52
4 Balok G2 dim.30x45, L = 4.7 m
- Beton K-250 2.53 M3 763,400.00 1,934,760.96 763,400.00 0.00 0.00 2.53 763,400.00 1,934,760.96
- Besi beton 448.09 Kg 9,844.00 4,410,978.37 9,844.00 0.00 0.00 448.09 9,844.00 4,410,978.37
- Bekisting 31.68 M2 170,708.00 5,408,029.44 170,708.00 0.00 0.00 31.68 170,708.00 5,408,029.44
5 Balok G4 dim.30x45, L = 2.25 m
- Beton K-250 1.13 M3 763,400.00 865,695.60 763,400.00 0.00 0.00 1.13 763,400.00 865,695.60
- Besi beton 247.00 Kg 9,844.00 2,431,513.87 9,844.00 0.00 0.00 247.00 9,844.00 2,431,513.87
- Bekisting 12.96 M2 170,708.00 2,212,375.68 170,708.00 0.00 0.00 12.96 170,708.00 2,212,375.68
6 Balok G5 dim.30x45, L = 3.8 m
- Beton K-250 0.67 M3 763,400.00 513,004.80 763,400.00 0.00 0.00 0.67 763,400.00 513,004.80
- Besi beton 114.32 Kg 9,844.00 1,125,404.07 9,844.00 0.00 0.00 114.32 9,844.00 1,125,404.07
- Bekisting 5.28 M2 170,708.00 901,338.24 170,708.00 0.00 0.00 5.28 170,708.00 901,338.24
7 Balok G5 dim.30x45, L = 2.5 m
- Beton K-250 0.84 M3 763,400.00 644,920.32 763,400.00 0.00 0.00 0.84 763,400.00 644,920.32
- Besi beton 160.24 Kg 9,844.00 1,577,391.35 9,844.00 0.00 0.00 160.24 9,844.00 1,577,391.35
- Bekisting 10.56 M2 170,708.00 1,802,676.48 170,708.00 0.00 0.00 10.56 170,708.00 1,802,676.48
8 Balok G6 dim.30x60, L = 5.5 m
- Beton K-250 1.36 M3 763,400.00 1,040,895.90 763,400.00 0.00 0.00 1.36 763,400.00 1,040,895.90
- Besi beton 264.26 Kg 9,844.00 2,601,351.89 9,844.00 0.00 0.00 264.26 9,844.00 2,601,351.89
- Bekisting 15.15 M2 170,708.00 2,586,226.20 170,708.00 0.00 0.00 15.15 170,708.00 2,586,226.20
9 Balok RB1 dim.15x30, L = 4 m
- Beton K-250 1.67 M3 763,400.00 1,271,061.00 763,400.00 0.00 0.00 1.67 763,400.00 1,271,061.00
- Besi beton 393.62 Kg 9,844.00 3,874,786.49 9,844.00 0.00 0.00 393.62 9,844.00 3,874,786.49
- Bekisting 27.75 M2 170,708.00 4,737,147.00 170,708.00 0.00 0.00 27.75 170,708.00 4,737,147.00
10 Balok RB2 dim.15x30, L = 5,5 m
- Beton K-250 1.87 M3 763,400.00 1,429,084.80 763,400.00 0.00 0.00 1.87 763,400.00 1,429,084.80
- Besi beton 416.56 Kg 9,844.00 4,100,621.26 9,844.00 0.00 0.00 416.56 9,844.00 4,100,621.26
- Bekisting 31.20 M2 170,708.00 5,326,089.60 170,708.00 0.00 0.00 31.20 170,708.00 5,326,089.60
11 Balok RB2 dim.15x30, L = 1.5 m
- Beton K-250 1.89 M3 763,400.00 1,442,826.00 763,400.00 0.00 0.00 1.89 763,400.00 1,442,826.00
- Besi beton 420.57 Kg 9,844.00 4,140,050.31 9,844.00 0.00 0.00 420.57 9,844.00 4,140,050.31
- Bekisting 31.50 M2 170,708.00 5,377,302.00 170,708.00 0.00 0.00 31.50 170,708.00 5,377,302.00
12 Balok RB3 dim.15x30, L = 2.25 m
- Beton K-250 0.35 M3 763,400.00 267,953.40 763,400.00 0.00 0.00 0.35 763,400.00 267,953.40
- Besi beton 95.91 Kg 9,844.00 944,149.93 9,844.00 0.00 0.00 95.91 9,844.00 944,149.93
- Bekisting 5.85 M2 170,708.00 998,641.80 170,708.00 0.00 0.00 5.85 170,708.00 998,641.80
13 Balok Paraped dim.15x30, L = 1.5 m
- Beton K-250 1.22 M3 763,400.00 927,531.00 763,400.00 0.00 0.00 1.22 763,400.00 927,531.00
- Besi beton 215.80 Kg 9,844.00 2,124,337.34 9,844.00 0.00 0.00 215.80 9,844.00 2,124,337.34
- Bekisting 17.55 M2 170,708.00 2,995,925.40 170,708.00 0.00 0.00 17.55 170,708.00 2,995,925.40
13 Plat lantai t = 30 cm
- Beton K-250 15.51 M3 763,400.00 11,840,334.00 763,400.00 0.00 0.00 15.51 763,400.00 11,840,334.00
- Besi beton 2,903.99 Kg 9,844.00 28,586,883.38 9,844.00 0.00 0.00 2,903.99 9,844.00 28,586,883.38
- Bekisting 51.70 M2 184,713.00 9,549,662.10 184,713.00 0.00 0.00 51.70 184,713.00 9,549,662.10
14 Plat lantai t = 13 cm
- Beton K-250 23.25 M3 763,400.00 17,749,431.70 763,400.00 0.00 0.00 23.25 763,400.00 17,749,431.70
- Besi beton 2,112.60 Kg 9,844.00 20,796,416.32 9,844.00 0.00 0.00 2,112.60 9,844.00 20,796,416.32
- Bekisting 178.85 M2 184,713.00 33,035,920.05 184,713.00 0.00 0.00 178.85 184,713.00 33,035,920.05
15 Plat lantai paraped t = 12 cm
- Beton K-350 18.72 M3 763,400.00 14,290,848.00 763,400.00 0.00 0.00 18.72 763,400.00 14,290,848.00
- Besi beton 1,769.57 Kg 9,844.00 17,419,632.24 9,844.00 0.00 0.00 1,769.57 9,844.00 17,419,632.24
- Bekisting 156.00 M2 184,713.00 28,815,228.00 184,713.00 0.00 0.00 156.00 184,713.00 28,815,228.00
Sub Total C 334,048,305.70 0.00 0.00 0.00 334,048,305.70
D LANTAI ATAP
1 Kolom K5A : 30x30
- Beton K-250 1.80 M3 763,400.00 1,374,120.00 763,400.00 0.00 0.00 1.80 763,400.00 1,374,120.00
- Besi beton 395.49 Kg 9,844.00 3,893,169.24 9,844.00 0.00 0.00 395.49 9,844.00 3,893,169.24
- Bekisting 24.00 M2 167,213.00 4,013,112.00 167,213.00 0.00 0.00 24.00 167,213.00 4,013,112.00
2 Balok RB1 dim.15x30, L = 4 m
- Beton K-250 4.00 M3 763,400.00 3,050,546.40 763,400.00 0.00 0.00 4.00 763,400.00 3,050,546.40
- Besi beton 944.69 Kg 9,844.00 9,299,487.57 9,844.00 0.00 0.00 944.69 9,844.00 9,299,487.57
- Bekisting 66.60 M2 170,708.00 11,369,152.80 170,708.00 0.00 0.00 66.60 170,708.00 11,369,152.80
3 Balok RB2 dim.15x30, L = 5,5 m
- Beton K-250 1.87 M3 763,400.00 1,429,084.80 763,400.00 0.00 0.00 1.87 763,400.00 1,429,084.80
- Besi beton 416.56 Kg 9,844.00 4,100,621.26 9,844.00 0.00 0.00 416.56 9,844.00 4,100,621.26
- Bekisting 31.20 M2 170,708.00 5,326,089.60 170,708.00 0.00 0.00 31.20 170,708.00 5,326,089.60
4 Balok RB3 dim.15x30, L = 2.25 m
NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN TOTAL PEK.TAMBAH TOTAL PEK.KURANG HARGA SATUAN JUMLAH HARGA
VOLUME UNIT (Rp) (Rp) (Rp)
VOLUME
( Rp ) ( Rp )
( Rp. ) ( Rp. ) TAMBAH KURANG
- Beton K-350 0.70 M3 763,400.00 535,906.80 763,400.00 0.00 0.00 0.70 763,400.00 535,906.80
- Besi beton 191.82 Kg 9,844.00 1,888,299.86 9,844.00 0.00 0.00 191.82 9,844.00 1,888,299.86
- Bekisting 11.70 M2 170,708.00 1,997,283.60 170,708.00 0.00 0.00 11.70 170,708.00 1,997,283.60
Sub Total D 48,276,873.93 0.00 0.00 0.00 48,276,873.93
E LANTAI TOP
1 Balok RB1 dim.15x30, L = 2.5 m
- Beton K-250 0.45 M3 763,400.00 343,530.00 763,400.00 0.00 0.00 0.45 763,400.00 343,530.00
- Besi beton 106.38 Kg 9,844.00 1,047,239.59 9,844.00 0.00 0.00 106.38 9,844.00 1,047,239.59
- Bekisting 7.50 M2 170,708.00 1,280,310.00 170,708.00 0.00 0.00 7.50 170,708.00 1,280,310.00
2 Balok RB1 dim.15x30, L = 1.5 m
- Beton K-250 0.27 M3 763,400.00 206,118.00 763,400.00 0.00 0.00 0.27 763,400.00 206,118.00
- Besi beton 63.83 Kg 9,844.00 628,343.75 9,844.00 0.00 0.00 63.83 9,844.00 628,343.75
- Bekisting 4.50 M2 170,708.00 768,186.00 170,708.00 0.00 0.00 4.50 170,708.00 768,186.00
3 Balok RB2 dim.15x30, L = 3.8 m
- Beton K-250 0.68 M3 763,400.00 522,165.60 763,400.00 0.00 0.00 0.68 763,400.00 522,165.60
- Besi beton 149.42 Kg 9,844.00 1,470,892.32 9,844.00 0.00 0.00 149.42 9,844.00 1,470,892.32
- Bekisting 1.37 M2 170,708.00 233,528.54 170,708.00 0.00 0.00 1.37 170,708.00 233,528.54
4 Plat lantai t = 12 cm
- Beton K-250 3.83 M3 763,400.00 2,927,333.64 763,400.00 0.00 0.00 3.83 763,400.00 2,927,333.64
- Besi beton 231.29 Kg 9,844.00 2,276,824.96 9,844.00 0.00 0.00 231.29 9,844.00 2,276,824.96
- Bekisting 31.96 M2 170,708.00 5,454,974.14 170,708.00 0.00 0.00 31.96 170,708.00 5,454,974.14
Sub Total E 17,159,446.55 0.00 0.00 0.00 17,159,446.55
NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN TOTAL PEK.TAMBAH TOTAL PEK.KURANG HARGA SATUAN JUMLAH HARGA
VOLUME UNIT (Rp) (Rp) (Rp)
VOLUME
( Rp ) ( Rp )
( Rp. ) ( Rp. ) TAMBAH KURANG
2 Tie Beam / Sloof TB 25X45 L = 3.2 m, unit : 3 bh
- Beton K-250 0.95 M3 763,400.00 721,413.00 763,400.00 0.00 0.00 0.95 763,400.00 721,413.00
- Besi beton 218.86 Kg 9,844.00 2,154,465.55 9,844.00 0.00 0.00 218.86 9,844.00 2,154,465.55
- Bekisting 18.30 M2 141,636.00 2,591,938.80 141,636.00 0.00 0.00 18.30 141,636.00 2,591,938.80
3 Tie Beam / Sloof TB 25X45 L = 2.5 m, unit : 9 bh
- Beton K-250 1.42 M3 763,400.00 1,082,119.50 763,400.00 0.00 0.00 1.42 763,400.00 1,082,119.50
- Besi beton 347.61 Kg 9,844.00 3,421,840.24 9,844.00 0.00 0.00 347.61 9,844.00 3,421,840.24
- Bekisting 35.55 M2 141,636.00 5,035,159.80 141,636.00 0.00 0.00 35.55 141,636.00 5,035,159.80
4 Galian tanah
Galian Tanah Pondasi P1 4.20 M3 31,500.00 132,300.00 31,500.00 0.00 0.00 4.20 31,500.00 132,300.00
Galian tanah pondasi plat r. goundtank 23.10 M3 31,500.00 727,650.00 31,500.00 0.00 0.00 23.10 31,500.00 727,650.00
Galian Tanah Tie Beam L = 3.2 m 1.00 M3 31,500.00 31,362.19 31,500.00 0.00 0.00 1.00 31,500.00 31,362.19
Galian Tanah Tie Beam L = 2.5 m 1.57 M3 31,500.00 49,435.31 31,500.00 0.00 0.00 1.57 31,500.00 49,435.31
5 Urug Pasir ruang pompa
Urugan pasir ruang pompa GWT 2.10 M3 192,600.00 404,460.00 192,600.00 0.00 0.00 2.10 192,600.00 404,460.00
Urugan Pasir Pondasi P1 4.56 M3 192,600.00 877,533.75 192,600.00 0.00 0.00 4.56 192,600.00 877,533.75
Urugan Pasir Tie Beam L = 3.2 m 0.11 M3 192,600.00 20,800.80 192,600.00 0.00 0.00 0.11 192,600.00 20,800.80
Urugan Pasir Tie Beam L = 2.5 m 0.25 M3 192,600.00 48,751.88 192,600.00 0.00 0.00 0.25 192,600.00 48,751.88
6 Lantai kerja dibawah Pile Cap t=5 cm
Lantai Kerja ruang pompa GWT 1.05 M3 555,800.00 583,590.00 555,800.00 0.00 0.00 1.05 555,800.00 583,590.00
Lantai Kerja Pondasi P1 2.28 M3 555,800.00 1,266,181.88 555,800.00 0.00 0.00 2.28 555,800.00 1,266,181.88
Lantai Kerja Tie Beam L = 3.2 m 0.05 M3 555,800.00 30,013.20 555,800.00 0.00 0.00 0.05 555,800.00 30,013.20
Lantai Kerja Tie Beam L = 2.5 m 0.13 M3 555,800.00 70,343.44 555,800.00 0.00 0.00 0.13 555,800.00 70,343.44
7 Cor Plat dasar groundtank t=30 cm
- Beton K-250 6.30 M3 763,400.00 4,809,420.00 763,400.00 0.00 0.00 6.30 763,400.00 4,809,420.00
- Besi beton 263.58 Kg 9,844.00 2,594,672.49 9,844.00 0.00 0.00 263.58 9,844.00 2,594,672.49
- Bekisting 5.70 M2 184,713.00 1,052,864.10 184,713.00 0.00 0.00 5.70 184,713.00 1,052,864.10
8 Cor Plat dasar R. mesin t 10 cm
- Beton K-350 0.80 M3 763,400.00 610,720.00 763,400.00 0.00 0.00 0.80 763,400.00 610,720.00
- Besi beton 15.98 Kg 9,844.00 157,341.47 9,844.00 0.00 0.00 15.98 9,844.00 157,341.47
- Bekisting 1.14 M2 184,713.00 210,572.82 184,713.00 0.00 0.00 1.14 184,713.00 210,572.82
9 Cor beton dinding t=20 cm (uk. 3.2 x 3.2 m)
- Beton K-350 5.28 M3 763,400.00 4,030,752.00 763,400.00 0.00 0.00 5.28 763,400.00 4,030,752.00
- Besi beton 1,909.46 Kg 9,844.00 18,796,738.41 9,844.00 0.00 0.00 1,909.46 9,844.00 18,796,738.41
- Bekisting 30.72 M2 311,588.00 9,571,983.36 311,588.00 0.00 0.00 30.72 311,588.00 9,571,983.36
10 Cor beton dinding t=20 cm (uk.2.5 x 3.2 m)
- Beton K-250 8.25 M3 763,400.00 6,298,050.00 763,400.00 0.00 0.00 8.25 763,400.00 6,298,050.00
- Besi beton 500.13 Kg 9,844.00 4,923,257.93 9,844.00 0.00 0.00 500.13 9,844.00 4,923,257.93
- Bekisting 64.00 M2 311,588.00 19,941,632.00 311,588.00 0.00 0.00 64.00 311,588.00 19,941,632.00
11 Cor beton atap + tutup groundtank t=12 cm
- Beton K-250 2.52 M3 763,400.00 1,923,768.00 763,400.00 0.00 0.00 2.52 763,400.00 1,923,768.00
- Besi beton 263.58 Kg 9,844.00 2,594,672.49 9,844.00 0.00 0.00 263.58 9,844.00 2,594,672.49
- Bekisting 21.00 M2 311,588.00 6,543,348.00 311,588.00 0.00 0.00 21.00 311,588.00 6,543,348.00
12 Cor Kolom K1-30x30 ruang pompa
- Beton K-250 4.10 M3 763,400.00 3,132,993.60 763,400.00 0.00 0.00 4.10 763,400.00 3,132,993.60
- Besi beton 988.17 Kg 9,844.00 9,727,503.35 9,844.00 0.00 0.00 988.17 9,844.00 9,727,503.35
- Bekisting 47.88 M2 167,213.00 8,006,158.44 167,213.00 0.00 0.00 47.88 167,213.00 8,006,158.44
13 Balok B1-25x45 L = 3.2 m
- Beton K-350 0.69 M3 763,400.00 529,036.20 763,400.00 0.00 0.00 0.69 763,400.00 529,036.20
- Besi beton 197.42 Kg 9,844.00 1,943,366.92 9,844.00 0.00 0.00 197.42 9,844.00 1,943,366.92
- Bekisting 9.66 M2 170,708.00 1,649,039.28 170,708.00 0.00 0.00 9.66 170,708.00 1,649,039.28
14 Balok B1-25x45 L = 2.5 m
- Beton K-250 0.52 M3 763,400.00 396,777.15 763,400.00 0.00 0.00 0.52 763,400.00 396,777.15
- Besi beton 157.54 Kg 9,844.00 1,550,854.28 9,844.00 0.00 0.00 157.54 9,844.00 1,550,854.28
- Bekisting 7.25 M2 170,708.00 1,236,779.46 170,708.00 0.00 0.00 7.25 170,708.00 1,236,779.46
15 Balok B2-25x45
- Beton K-250 1.04 M3 763,400.00 793,554.30 763,400.00 0.00 0.00 1.04 763,400.00 793,554.30
- Besi beton 284.64 Kg 9,844.00 2,802,045.22 9,844.00 0.00 0.00 284.64 9,844.00 2,802,045.22
- Bekisting 14.49 M2 170,708.00 2,473,558.92 170,708.00 0.00 0.00 14.49 170,708.00 2,473,558.92
16 Pekerjaan Finishing
- Perapihan dinding bagian luar GWT / Exterior 59.64 M2 16,065.00 958,116.60 16,065.00 0.00 0.00 59.64 16,065.00 958,116.60
- Perapihan dinding bagian dalam GWT / interior 44.28 M2 16,065.00 711,358.20 16,065.00 0.00 0.00 44.28 16,065.00 711,358.20
- Perapihan pelat + canopy + dak beton 71.60 M2 16,065.00 1,150,254.00 16,065.00 0.00 0.00 71.60 16,065.00 1,150,254.00
- Screed lantai 1:3 tebal 35 cm termasuk aci di R. Pompa 14.40 M2 107,120.00 1,542,528.00 107,120.00 0.00 0.00 14.40 107,120.00 1,542,528.00
- Cat dinding bag. Luar (exterior) 59.64 M2 21,144.00 1,261,028.16 21,144.00 0.00 0.00 59.64 21,144.00 1,261,028.16
- Cat dinding bag. Dalam (interior) 57.64 M2 14,876.00 857,452.64 14,876.00 0.00 0.00 57.64 14,876.00 857,452.64
- Cat plafond expose 25.80 M2 14,876.00 383,800.80 14,876.00 0.00 0.00 25.80 14,876.00 383,800.80
- Cat canopy + dak beton 7.80 M2 21,144.00 164,923.20 21,144.00 0.00 0.00 7.80 21,144.00 164,923.20
- Waterproofing (coating bitumen ) pada daerah bak air & dak beton 44.28 M2 172,120.00 7,621,473.60 172,120.00 0.00 0.00 44.28 172,120.00 7,621,473.60
- Kusen Aluminium + Louver aluminium (terpasang) type JL 40x50 cm 2.00 Unit 80,000.00 160,000.00 80,000.00 0.00 0.00 2.00 80,000.00 160,000.00
- Kusen Aluminium + Louver aluminium (terpasang) type JL 60x80 cm 4.00 Unit 192,000.00 768,000.00 192,000.00 0.00 0.00 4.00 192,000.00 768,000.00
- Kusen Aluminium + Louver aluminium (terpasang) type JL 60x120 cm 2.00 Unit 288,000.00 576,000.00 288,000.00 0.00 0.00 2.00 288,000.00 576,000.00
NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN TOTAL PEK.TAMBAH TOTAL PEK.KURANG HARGA SATUAN JUMLAH HARGA
VOLUME UNIT (Rp) (Rp) (Rp)
VOLUME
( Rp ) ( Rp )
( Rp. ) ( Rp. ) TAMBAH KURANG
- Kusen Rangka CNP + Daun Pintu Plat Baja T = 1,5 mm (terpasang) type PB1 2.00 Unit 4,310,000.00 8,620,000.00 4,310,000.00 0.00 0.00 2.00 4,310,000.00 8,620,000.00
- R. GWT :
- Pasang lantai keramik 30x30 ad.5 cm (kasar) 44.28 M2 98,960.00 4,381,948.80 98,960.00 0.00 0.00 44.28 98,960.00 4,381,948.80
- Pasang keramik dinding 30x30, T = 2,10 m diruang pompa & genset 36.04 M2 107,120.00 3,860,604.80 107,120.00 0.00 0.00 36.04 107,120.00 3,860,604.80
- Waterproofing semen base (liquid/coating) lantai dan dinding t=3m luar dal 175.52 M2 175,000.00 30,716,000.00 175,000.00 0.00 0.00 175.52 175,000.00 30,716,000.00
Pekerjaan Sipil Septic Tank Biotech 2 (Dua) Unit 2.000 Unit 12,668,884.84 25,337,769.68 0.00 0.00 25,337,769.68
GRAND
No. PEKERJAAN PANJANG LEBAR TINGGI BANYAK JUMLAH TOTAL TOTAL KETERANGAN
I GALIAN PONDASI TAPAK 140.88 M³
TYPE P1 2.50 2.50 0.50 12.00 37.50
TYPE P1A 2.75 2.75 0.50 12.00 45.38
TYPE P2 4.50 2.50 0.50 6.00 33.75
TYPE P2A 4.50 2.25 0.50 4.00 20.25
TYPE P3 2.00 2.00 0.50 2.00 4.00
IV KOLOM PEDESTAL
TYPE K1 0.45 0.30 0.80 16.00 1.73
TYPE K2 0.45 0.30 0.80 16.00 1.73
TYPE K3 0.35 0.35 0.80 6.00 0.59
BETON K 350 4.04 M³
PEKERJAAN PEKERJAAN
No. URAIAN PEKERJAAN KONTRAK AWAL ADDENDUM KONTRAK
TAMBAH KURANG
Terbilang ; Empat miryard empat ratus sembilan puluh tiga juta empat ratus empat puluh tujuh ribu rupiah.
IDA ALFIANI
Direktur Utama