Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

EcoAs

Hand-Set Formwork
1 2

EcoAs: Modular, Hand-Set EcoAs panel sizes


Heights (cm)
80 120 160 240 300
The modular System for simple setup by hand
160
EcoAs is a sturdy, fast and flexible hand-set formwork system for small
and medium-sized concrete jobs 1 without the need for a crane. The 100
steel panels can all be set up by one worker 2 . The EcoAs system is 80 80 80 80
Widths (cm)

100 % compatible with the sister hand-set system AluFix 3 . 75


55 55 55
50 50 50 50
40 40 40 40
30 30
25 25 25 25

2
EcoAs
Hand-Set Formwork

Facing
EcoAs panels deliver a smooth, clean, consistent
and even concrete finish from the first pour to
the last. The all-plastic 100 % wood-free polypro-
pylene facing lasts as long as the frame and does
away with plywood waste and refacing costs.
n No swelling or shrinking
n Nailable like wood
n Immune to moisture
n Easy to clean and repair, even on site

7 Year Long Term Warranty


n No rotting
n No ripplings
n No discolouration
n No loss of flexural rigidity
n Resistant to UV rays

3
Versatile in Small-Scale
Construction
Project Profile g Thanks to their standard all-plastic, 100 %
Time and labour saving concrete pours, especially wood-free alkus facing, the EcoAs panels handle
versatile on irregular layouts and complex small jobs with high demands on the concrete finish
structures. The load capacity of 50 kN/m² can be with ease.
used fully and safely for:
n Foundations
n Light shafts
n Concrete beams
n Stair wells
n Garden walls
n Canalisation shafts

i EcoAs is ideal as a flexible panel option on


foundations, starter walls and floor slabs.

4
EcoAs
Hand-Set Formwork

Irregular and complex small concrete structures


are home ground for EcoAs wall formwork.

5
Modular and 1

Time-Saving
Panel connection
The MEVA clamp 1 joins and aligns panels with
just a few hammer blows. It provides a safe, stable
panel connection, fits anywhere on the frame and
is light and easy to handle. 3
2
Attachments
All accessories such as push-pull props, working
platforms and accessories are attached with a
flange screw 6 to the welded-in DW threat in
the multi-function profile 2 . Walkway brackets
have a pin 3 which fits into the same DW thread
and automaticalls locks into safe position. No
additional parts are needed, reducing inventory
and effort in handling and moving equipment.

Corners
All corners from 0° to 180° are covered by inside
5 , outside 7 and hinged 4 corners.

4 5

6 7

6
EcoAs
Hand-Set Formwork

8
9

Dry ties
Foundations and small walls (e.g. for canals,
swimming pools) can be formed with dry ties
using a foundation tape and foundation tensioner
below plus the push-pull strut 23 to replace the
top tie 8 .

Stop ends
save parts, reduce effort and save time using the
10 stop end bracket 23/60 9 . You simply fit it, tie
the formwork – done!
11

Alignment rails
are attached with flange screws 18 to the multi-
function profile 10 .

Filler areas
Compensating filler areas is simple: up to 16 cm
a filler timber and Uni clamp 11 are the only parts
that are needed. Excess forming area is always
smaller than 40 cm thanks to the panel size range.
Filler areas are thus minimised, allowing optimum
adaptation to the building layout.

Advantages: save on parts, reduce effort,


simplify handling, save time on money.

7
Family owned and managed in the second MEVA has been a pioneer and innovator in hollow profile. MEVA offers a comprehensive
generation, MEVA is based in Haiterbach in formwork since 1970. Many MEVA inventions product range for every building project and any
Germany‘s Black Forest region. The form- have become standard in the industry: modular contractor from small to large, from foundation
work manufacturer is represented through panelised formwork systems, the multifunction to high rise and from hand-set formwork all the
40 locations on 5 continents. profile, the formwork clamp and the closed way to fully automatic climbing systems.

Headquarters (Germany) Formwork Centers International Sales & Service


MEVA Schalungs-Systeme GmbH A-Pfaffstätten, Tel. +43 2252 20900-0 A-Pfaffstätten, Tel. 02252 20900-0
Industriestrasse 5 D-Berlin, Tel. +49 3375 90300 AUS-Adelaide, Tel. 08 82634377
D-72221 Haiterbach D-Haiterbach, Tel. +49 7456 692-01 Benelux, Gouda, Tel +31 182 570770
Tel. +49 7456 692-01 D-Hannover, Tel. +49 511 949930 CDN-Toronto, Tel. 416 8278714
Fax +49 7456 692-66 H-Budapest, Tel. +36 1 2722222 CHSeon, Tel. 062 7697100
info@meva-international.com UAEDubai, Tel. +971 4 3411180 CO-Bogotá, Tel. 01 5204236
www.meva-international.com USA-Springfield, Tel. +1 937 3280022 FSarreguemines, Tel. 0387 959938
GBTamworth, Tel. 01827 60217
HBudapest, Tel. 01 2722222
IND-Mumbai, Tel. 022 27563430
MAL-Perak, Tel. 12 5209337
N-Oslo, Tel. 067 154200
PA-Panama City 507 2372222
SGP-Singapore, Tel. 67354459
UAEDubai, Tel. 04 3411180
USASpringfield, Tel. 937 3280022
2810 GB pdf 3/16, Printed in Germany

You might also like