Professional Documents
Culture Documents
16 EcoAs GB PDF
16 EcoAs GB PDF
Hand-Set Formwork
1 2
2
EcoAs
Hand-Set Formwork
Facing
EcoAs panels deliver a smooth, clean, consistent
and even concrete finish from the first pour to
the last. The all-plastic 100 % wood-free polypro-
pylene facing lasts as long as the frame and does
away with plywood waste and refacing costs.
n No swelling or shrinking
n Nailable like wood
n Immune to moisture
n Easy to clean and repair, even on site
3
Versatile in Small-Scale
Construction
Project Profile g Thanks to their standard all-plastic, 100 %
Time and labour saving concrete pours, especially wood-free alkus facing, the EcoAs panels handle
versatile on irregular layouts and complex small jobs with high demands on the concrete finish
structures. The load capacity of 50 kN/m² can be with ease.
used fully and safely for:
n Foundations
n Light shafts
n Concrete beams
n Stair wells
n Garden walls
n Canalisation shafts
4
EcoAs
Hand-Set Formwork
5
Modular and 1
Time-Saving
Panel connection
The MEVA clamp 1 joins and aligns panels with
just a few hammer blows. It provides a safe, stable
panel connection, fits anywhere on the frame and
is light and easy to handle. 3
2
Attachments
All accessories such as push-pull props, working
platforms and accessories are attached with a
flange screw 6 to the welded-in DW threat in
the multi-function profile 2 . Walkway brackets
have a pin 3 which fits into the same DW thread
and automaticalls locks into safe position. No
additional parts are needed, reducing inventory
and effort in handling and moving equipment.
Corners
All corners from 0° to 180° are covered by inside
5 , outside 7 and hinged 4 corners.
4 5
6 7
6
EcoAs
Hand-Set Formwork
8
9
Dry ties
Foundations and small walls (e.g. for canals,
swimming pools) can be formed with dry ties
using a foundation tape and foundation tensioner
below plus the push-pull strut 23 to replace the
top tie 8 .
Stop ends
save parts, reduce effort and save time using the
10 stop end bracket 23/60 9 . You simply fit it, tie
the formwork – done!
11
Alignment rails
are attached with flange screws 18 to the multi-
function profile 10 .
Filler areas
Compensating filler areas is simple: up to 16 cm
a filler timber and Uni clamp 11 are the only parts
that are needed. Excess forming area is always
smaller than 40 cm thanks to the panel size range.
Filler areas are thus minimised, allowing optimum
adaptation to the building layout.
7
Family owned and managed in the second MEVA has been a pioneer and innovator in hollow profile. MEVA offers a comprehensive
generation, MEVA is based in Haiterbach in formwork since 1970. Many MEVA inventions product range for every building project and any
Germany‘s Black Forest region. The form- have become standard in the industry: modular contractor from small to large, from foundation
work manufacturer is represented through panelised formwork systems, the multifunction to high rise and from hand-set formwork all the
40 locations on 5 continents. profile, the formwork clamp and the closed way to fully automatic climbing systems.