Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Working in a construction phase.

On my previos - Installation of Stones- Available OSM


job is Caonstruction Management. I'm - Installation of Rhino-White stones from pebble
responsible for the day to day fit-out wash.
management, monitoring of progress works and 4. Inspection and supervision to ensure the
site documentation at hotel units at Tower A, quality standard by pushing contractor
lift lobbies and hallways and L3. 4.1. Design Issues
Construction Management Team - Site walkthrough- PM, Consultant, CM and
1. Main task is to maintain proper coordination contractors and suppliers. Resolve ung issues
with the Project Management team, CM 4.2. Minutes of the Meeting- email to everyone
(MEPS), to our contractors, sub-contractors and involve parties.
even to the suppliers of OSM (Owner Supplied 4.3. Site Instruction- it's for contractor to take
Materials). charge on the specified scope of work. (Billing)
2. Field Observation Report- Familiarization on Ex.
plans and specs and even the FF&E reqirement 4.4. Inspection & Monitoring
by the designer. Hold points on site para dun 4.4.1. FF&E Requirement & RCP- proper
mamatch namin ni contractor yung mga design markings - ceiling- sprinkler, lights fixtures and
issues sa areas. Para maiwasan yung mga air grille for supply and return, permanent
possible problem na pwedeng maengage upon access panels for maintenance
mobilization of works. - wall- proper height and distance of outlets,
3. We do the supervision and inspection of fit- thermostat, wall sconce
out works upon contractor submit an IWR - floor outlets
(Inspection Work Request). With a proper IWR 4.4.2. Installation of CHB Wall- double check
document including the required diameter of rebars and proper
3.1.Material approval distances of reinforcement rebars.
CM- check the specification and plan if the 4.4.3. Screeding Works
material is based on designers requirement. 4.4.4. Fire Compartmentalization Inspection
Consultant- the one who will approved the - Pipes na dumaan sa wall- sleve &
materials. sealant.
3.1.1. Unavailable Materials or - Wall- sealant
delayed delivery of materials - 4.4.5. Proper Insulation Chilled Water Pipes,
magpapaapproved si contractor kay consultant. - Proper alignment and installation of
Para magproposed ng alternative and locally plenum. Exact sa air grille for the supply of
available materials as a temporary solution. aircon.
3.2. Approved Methodology 4.4.6. Waterproofing - nalagyan ng
- Upon submission of IWR- that’s the time na waterproofing ung target areas and nasunod
magkakaroon ng joint inspection between CM yung required application. Testing upon
and contractor upon proceeding the scope of proceeding of stones.
work. 4.4.7. Coring & Facade & Unit Leak
3.2.1. Ex. Change of Material & 5. Schedule of Works -
Methodology 5. Punchlisting, Checking of As-built, Handover
- Installation of CHB Wall - Two-hour fire rated Documents and Simulation.
drywall with insulation.
there's a great deal of uncertainty on my
previous job because im in a project based Makati Development Corporation -
uncertainty. I'm looking for a company where I
can stay longer, a longer opportunity to grow. Operating principle
I've already outgrown my role at DCII. I believe Teamwork - Collaboration - "Kayang-kaya kung
that I have to make ways for me to improve my sama-sama"
skills and knowledge to maximize my full Company-
potential. I want to work here because I want to - Established - Corporate Socal Responsibility
have a good career path and your company is the driving force of a highly committed
offers a good opportunity professionally and business sector. By working effectively with
personally. communities and partner institutions, we aim to
attain equitable and sustainable projects for the
This is a good chance to have menaningful various communities in the country.
lexperience and oportnity to work in a company - In 2003, MDC became the first construction
that provides an important service in oour company in the Philippines to simultaneously
country through nation building. I'm hoping to receive world class integrated ISO Certifications
work considering to be able to exposed more for the Integrated Management System, and for
on site procedures. its consistent compliance to its requirements
- Specializes in engineering, procurements and
My willingness to learn new things and my construction of utility projects like residential
experiences on my previous job which I can be subdivision, medical facilities, Condo's, Malls,
used. I'm more on particular to have more Schools, roads and bridges, and commercial
working experiences. centers, hotels..etc.
-MDC was responsible for the transformation of
But I really appreciate if you can give me higher Makati from an old airport runway into the
than my previos salary. You should considered country’s first commercial, residential and
me because I can be an asset in yor organization business hub.
because of my good working habits. - Being the construction arm of Ayala Land,
- highly organized highly efficient working in a some of its known projects are Ayala Greenfield
multi-tasking environment. Estates and Holiday Inn and Circuit Makati.
-deal with pressure - LEED Certification- Leadership in Energy &
- i can impart the things I learned in Environmental Design which performed in
COnstruction managment I have a working green buildings in our country.
knowledge in softwares. Quality - Best of quality when it comes in
providing top-notch Engineering, Procurement,
However in Okada were using ACONEX. It's an Construction and Construction Management
oracle system where electronic documents and services.
management system that is using around the Ayala Land construction arm, MDC plays a vital
world. role in serving 100% of Ayala Land�s projects.
Share & serve
" They value their people and nation as their
own"
- Training- equipped young professionals to
maximize their full potential when It comes to
construction field.
- MDC invested heavily on new technologies
and innovations in order to strengthen its
competencies.

- Value Engineering, Building Information


Technology, Building Systems (Precast Walls,
Tran-slab and Formworks systems), Ready-
Mixed Concrete Production, Landscaping and
Equipment Re-fleeting allowed MDC to
continuously provide quality services for its
customers.

You might also like