Work Schedule MR Mayowa
Work Schedule MR Mayowa
Year 5 Ojeh:
1 Bulb
Year 4 C:
AC Leaking Water
Primary ICT:
Window Locks
Teacher’s Drawer.
Year 4B:
Dispenser
Dorr Glass.
Year 3D:
Bulb
Year3C:
1Bulb
Year 3A:
Teachers Drawer
AC Servicing
Year 5A:
Teachers Table Drawer
1 New Teacher’s chair
Primary Admin:
AC Socket
Teacher’s chair
Early Years:
Playground:
The Artificial grass needs patches.
The underlay needs glue. Its sticking
out.
Staff Room:
Toilets bowl leaking
Emerald Chukwuemeka:
Toilet bowl leaking
All sockets are not working (No
appliance can be used in the class).
Creche:
*URGENT* Bed (Needs Edge
Protection)
Fencing is weak
Door (needs replacement)
Wardrobe door (needs fixing)
Wardrobe Door
Book Shelf (needs replacement)
Diamond Imo:
Wash hand basin leaking.
Gold Nwakpa:
2 ACs nor working
2 Taps leaking
Diamond Adetunji:
WC leaking
Wash hand basin Leaking
5. Friday A tour round the Early Years and Primary section to check all faults and ensure they are
fixed, also to ensure broken items are also taken off the environment around these places
To ensure all faults are worked on and send for approvals if need be.
Proper supervision of contractors while carrying out their work with the school
To send a report of the jobs done for the day to the DWM by 3pm.
Kindly note other faults must also be dealt with which also include the arrangements of venue for events and unforeseen emergencies, etc.