AMM AS350 B2B3

Version: B2, B3

Removal / Installation - Pitch Change Links


PRE MOD 075606 or PRE MOD 076602
Tail Gearbox

A. Applicable Documents

1. Main information
AMM 67-21-00,5-1 Rigging - Tail Rotor Flight Controls (Version without
Auto-Pilot)
AMM 67-21-01,5-1 Rigging - Tail Rotor Flight Controls (Version with
Auto-Pilot)

2. Conditional information
AMM 64-10-00,5-1 Tail Rotor Balancing

3. General information
AMM 60-00-00,3-1 General Safety Instruction - Mechanical Assemblies

B. Special Tools
None

C. Materials
CM 514 Varnish
Commercial red and yellow adhesive tape

D. Routine Replacement Parts

AMM
Description Reference
Fig. Item

Figure 1 (1) Cotter pin (P/N 23310CA020020)

Figure 1 (2) Nut (P/N ASNA0044-080BCL)

Figure 1 (8) Nut (P/N ASNA0045-080BCL)

Figure 1 (9) Cotter pin (P/N 23310CA015020)

E. Job Set-up

Juan Francisco, Z00000037393 AMM 65-21-00,4-12A


2019-08-22 17:38:07 2018.08.27 - Page 1
THE DOCUMENT REFERENCE IS ONLINE, PLEASE CHECK THE CORRESPONDANCE BETWEEN THE ONLINE DOCUMENTATION AND THE PRINTED VERSION
AMM AS350 B2B3

1. Comply with the general safety instructions for the mechanical assemblies (AMM
60-00-00,3-1).

F. Procedure
Figure 1

- IT IS RECOMMENDED TO SECURE THE TAIL ROTOR DRIVE BY


TIGHTENING THE ROTOR BRAKE TO WORK ON THE TAIL ROTOR.
- COMPLY WITH THE PITCH CHANGE LINK PAINT MARKING IN
ORDER TO OBSERVE BALANCING.

1. Pitch change link removal.

a. Pitch change link (5) disconnection on blade side.

(1) Remove and discard cotter pin (1).

(2) Remove and discard nut (2).

(3) Remove washers (3) and bolt (4).

b. Pitch change link (5) disconnection on control plate side.

(1) Remove and discard cotter pin (9).

(2) Remove and discard nut (8).

(3) Remove washers (7) and bolt (6).

2. Pitch change link installation.

a. Pitch change link (5) connection on blade side.

(1) Install bolt (4) and washers (3).

Bolts (4) must be installed in the opposite direction of rotation of the


rotor.

(2) Install new nut (2).

Juan Francisco, Z00000037393 AMM 65-21-00,4-12A


2019-08-22 17:38:07 2018.08.27 - Page 2
THE DOCUMENT REFERENCE IS ONLINE, PLEASE CHECK THE CORRESPONDANCE BETWEEN THE ONLINE DOCUMENTATION AND THE PRINTED VERSION
AMM AS350 B2B3

(3) Torque nut (2).

(4) Safety nut (2) with the new cotter pin (1).

b. Pitch change link (5) connection on control plate side.

(1) Install bolt (6) and washers (7).

Bolts (6) must be installed in the opposite direction of rotation of the


rotor.

(2) Install new nut (8).

(3) Torque nut (8).

(4) Safety nut (8) with the new cotter pin (9).

G. Close-up

1. Manually check for free rocking of the blade assembly with respect to the rotor
hub.

2. If pitch change links are replaced, check the unbalance of the tail rotor (AMM
64-10-00,5-1).

3. Do the adjustment of the flight controls of the tail rotor (AMM 67-21-00,5-1) or
(AMM 67-21-01,5-1).

Foolproofing of the pitch-change links, after adjusting the unbalance, with a


strip of red adhesive tape (10 mm (.4 in.) min) on one of the links and a strip of
yellow adhesive tape (10 mm (.4 in.) min) on the other, then apply Varnish CM
514.

Juan Francisco, Z00000037393 AMM 65-21-00,4-12A


2019-08-22 17:38:07 2018.08.27 - Page 3
THE DOCUMENT REFERENCE IS ONLINE, PLEASE CHECK THE CORRESPONDANCE BETWEEN THE ONLINE DOCUMENTATION AND THE PRINTED VERSION
AMM AS350 B2B3

Figure 1: Removal / Installation - Pitch Change Links PRE MOD 075606 or PRE MOD
076602

End of Document

Juan Francisco, Z00000037393 AMM 65-21-00,4-12A


2019-08-22 17:38:07 2018.08.27 - Page 4
THE DOCUMENT REFERENCE IS ONLINE, PLEASE CHECK THE CORRESPONDANCE BETWEEN THE ONLINE DOCUMENTATION AND THE PRINTED VERSION

You might also like