Major Achievements and Improvements delivered to the
Business for the year
1.1.1 Phu Kham Fixed Maintenance
1) A solid safety performance with no LTIs for 2018, reaching a mile stone in November of 5 years LTI free.
2) Our continued focus on the Take 5 process in line with the IIF initiative has seen the department do
more than 78000 Take 5”s for the year.
3) Our focus on JSA’s quality in both English & Lao has seen the development of more than ….. SWP.
4) Visible leadership improvement with a high volume of Job safety observation & work place inspections.
5) 5S Sustainability in workshop areas and laydown yard
6) Continued development of new supervisors and team leaders with on and off site targeted training.
7) Beyond 1D in line with our “you stay we train” initiative.
8) Potential superintendents that were in the in 2 x year secondment development program are in the
final stages of the program, which will see the first two Lao fixed plant maintenance superintendents
appointed at BHX in January 2019.
9) We have successfully integrated the Apprentices into the Mechanical and Electrical teams.
10) Our “Job Ready” is now embedded in the way we work and continues to make improvements in the
quality in way we execute the task by increasing our efficiency & reducing waste.
11) Our “Job owners” initiative is now embedded and supports the job ready process, by empowering each
supervisor to own & be accountable for the associated task.
12) Budget availability for the concentrator circuit 96%.
13) Sandvik crushing and screening plant continues to perform at sustained high availabilities.
14) Best in class hydro carbon management from Chevron.
15)
Page 1 of 13
2018 Departmental Achievements
The main focus of the improvement process for 2018 within PKM Fixed Plant was sustaining and improving
safety, availability and cost performance. This was achieved through the focused attention to LEAN
processes, waste elimination, design improvement and strategic value generation projects.
Areas of ‘Technical Plant Improvement’s’ delivered to Phi Kham Fixed Plant in 2017, have included the
following.
Sandvik crushing and screening plant continues to perform at sustained high availabilities.
Standard Stairs and Work Access Platforms for Sandvik Crusher Plant, improved access for maintenance
and operations.
There were 13 Value Generation Projects for PKM Fixed Plant completed and implemented in 2017, with a
combined proposed cost saving of $1,766k. An additional 14 projects are in progress at the end of 2017
which have a proposed value of over $4,489k. These pending projects will be prioritised and implemented
during the course of 2018.
Page 3 of 13
1.2.4 Grinding and Crushing Circuit
SAG & Ball Mill Air receivers: Eliminate frequent pinion cycle grease alarms, by providing stable air supply
Page 4 of 13
CV02 Head end compressor: Provides air supply for pneumatic tools & reduces trip hazards for hoses on walk ways
CV03 Extension skirt boards: Eliminate overflow rock hittin pull wire & tripping CV03 during high tons
Chute 74/75 mass flow bins: External liner change out to eliminate confined space & decrease change out time
Page 5 of 13
Chute 8 & 9 Mass flow bins: Waste reduction 4 piece insert reducing change out time by 30 hours
Raw water transfer pumps: Increased water transfer capacity & reducing failure on PU 92-93 running above their
duty cycle
SAG & Ball Mill lube rooms: Enclose critical lube rooms to eliminate oil contamination & 5S improvements
Feeder 14 2 – Axis Monorail: Eliminate manual handling & reduce link change out time
Page 6 of 13
1.3 BHX Fixed Maintenance
The main focus of the improvement process for 2018 within Ban Houayxai Fixed Plant was sustaining and
improving Safety, Availability and Cost outcomes. This was achieved through the adoption of LEAN
processes, waste elimination, design improvement and strategic value generation projects.
Areas of ‘Technical Plant Improvement’s’ delivered to Ban Houayxai Fixed Plant in 2017, have included the
following.
Record availabilities were delivered in the crushing and grinding circuits for 2018. Mill 97.12% and
Crusher 93.41%. The MTBF has significantly improved in 2018 supporting the result. This has been
achieved by the below improvements delivered during the year, standards of work practice continued
to improve.
Page 7 of 13
Improvements including: Safety, LEAN processes, Waste elimination & 5 S
Page 8 of 13
Ball Mill Trommel plateform extension: Safe servicing of the Trommel
Ball Mill feed chute rock box: Improvement to cope with high wear area & blockages
Page 9 of 13
Booster pump for water cannon: ……..
Page 10 of 13
Page 11 of 13