1.Incorrect Specifications
a. Sheet /Strip Specifications was specified initially as against Pipe specification.
Suggested Improvement: - Std designation for various items tabulated & forwarded to procurement dpt for ready reference
for future correct ordering

b. In correct Purchased designation


Suggested Improvement: - Std designation for various items tabulated & forwarded to procurement dpt for ready reference
for future correct ordering

2..Miscommunication
a. Since Chinese vendors are selected for supply , there is some small gap between understanding.
Suggested Improvement :- During vendor assessment / Visit , requirement shall be fully explained to the maximum understanding
level.

3..Consultant Comments
a. Hutnik assessment & restriction for using elbows other than 3D ( Elbow diameter)
Suggested Improvement :- Only verbal correspondence was done & 3D was insisted by Hutni without any further changes. In
future a transmittal shall be made & further mail /telephonic communication shall be made so as to convince the consultant for
lower diameters.
Cause and Effect – Titanium Pipes & Fittings – NMDC Project
Vendor : Baoji Changrun – China , PO: 1200000263

4..Inspection & QAP


a. PMI & other quality checks not accepted by vendor , although QAP was signed & agreed by the Vendor.
Suggested Improvement :- During vendor assessment / Visit , requirement shall be fully explained to the maximum understanding
level. If possible vendor shall be invited for desk to desk discussions & acceptance.
Cause and Effect – Titanium Pipes & Fittings – NMDC Project
Vendor : Baoji Changrun – China , PO: 1200000263

INCORRECT SPECIFICATIONS Hutni(Technology Provider) DELIVERY

SHEET/STRIP Inspection completed 1st


SPECIFICATION(B265) week of august ’18 , IWC
WAS GIVEN AS AGIANST Hutni restriction on 3D received on 30/8/018
B338/B861 ( Fitting Radius) for
technical reasons/ flow
restrictions. Mtl expected to site in January
LAP
19. After 4 months due to
JOINT/STUBEND
custom formalities & penalty
ISSUE

In correct Purchasing Incorrect


Information Specification
,Technology
Provider
PMS wrongly approved Comments /
by MECON which was Vendor Non
Chinese understanding of
prepared by Projects
General technical matter in Acceptance
english
Mutually agreed to
make PMI as random
per Individual Heat

PMI – 100% , not agreed


SPECIFIED WAS by vendor, although
3D but as per general std vendor agreed in QAP
understanding was 1.5 D 1.Preliminary meeting was conducted with Projects
2.Consultation with Hutni
3.Discussion with Vendor & Draft QAP initiated
MISCOMUNICATION INSPECTION 4.Final meeting was conducted &vendor was informed
5.Deputed Mr Reddy to China for inspection
6.Final Mecon Clearance was initiated