Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

8/6/2020 Prelim Examination: Attempt review

Home / My courses / UGRD-CS6302-2013T / WEEK 5: PRELIM EXAMINATION / Prelim Examination

Started on Thursday, 6 August 2020, 5:04 PM


State Finished
Completed on Thursday, 6 August 2020, 5:32 PM
Time taken 27 mins 38 secs
Grade 49.00 out of 50.00 (98%)

Question 1 ALM support you through ____.


Complete

Mark 1.00 out of Select one:


1.00
a. The development phase

b. None of the choices

c. All phases of Application Lifecycle Management

d. The implementing phase

Question 2 This is the two modules that have been completely redesigned as part of this release of ALM 12.0.
Complete

Mark 1.00 out of Select one:


1.00
a. Requirements Management and Defects Management

b. Application Management and Defect Management

c. Lifecycle Management and Requirements Management

d. Access Management and Action Management

Question 3 The Release Scope tab enables you to define and update release scope items.
Complete

Mark 1.00 out of


1.00 Select one:
True

False

Question 4 A physical devices used to identify users in secure systems.


Complete

Mark 1.00 out of Select one:


1.00
a. Common Access Card

b. Smart Card Authentication

c. Single Sign-on

d. Requirement Management

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=217822&cmid=1046&showall=1 1/10
8/6/2020 Prelim Examination: Attempt review

Question 5 Module addresses the need for a stronger connection between business process modeling, quality
Complete assurance management, and requirements definition.
Mark 1.00 out of
1.00 Select one:
a. SOS Business Models

b. ALM Business Models

c. CAC Business Models

d. PPT Business Models

Question 6 Cycle 2 can start before the end of cycle 1.


Complete

Mark 1.00 out of Select one:


1.00
True

False

Question 7 A dynamic hierarchical structure based on virtual folders allows for flexibility in manipulating the
Complete Requirements view.
Mark 1.00 out of
1.00 Select one:
a. Author views

b. Author mode

c. Category mode

d. Category views

Question 8 You can not customize each KPI to reflect your needs.
Complete

Mark 1.00 out of


1.00 Select one:
True

False

Question 9 Enables you to increase the number of parallel calculations performed on an entire site.
Complete

Mark 1.00 out of Select one:


1.00
a. Scheduling Area

b. Advanced Area

c. None of the choices

d. Purge Area

Question 10 This section enables you to open the ALM documentation library and other online resources.
Complete

Mark 1.00 out of Select one:


1.00
a. Action section

b. Help section

c. Guide section

d. Ask section

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=217822&cmid=1046&showall=1 2/10
8/6/2020 Prelim Examination: Attempt review

Question 11 This cycle tests the new features with existing features that might have been impacted by the changes.
Complete

Mark 1.00 out of Select one:


1.00
a. Cycle 2-Integrated System Testing

b. Cycle 4-User Acceptance Testing

c. Cycle 3-Performance Testing

d. Cycle 1- New Features

Question 12 Enables subject matter experts (SMEs) to work with Business Process Testing (BPT), the HP test
Complete automation solution.
Mark 1.00 out of
1.00 Select one:
a. Test Plan

b. Risk-based Quality Management

c. Test Resources

d. Business Components module

Question 13 Enable you to create and display a dynamic graphic representation of data related to test plans and test
Complete sets.
Mark 1.00 out of
1.00 Select one:
a. Live Analysis graphs

b. Analysis View module

c. Dashboard View module

d. Analysis Menus tab

Question 14 This tab enables you to manage the analysis items.


Complete

Mark 1.00 out of Select one:


1.00
a. Live Analysis graphs

b. Analysis Menus tab

c. None of the choices

d. Dashboard View module

Question 15 After the _____, the release goes through further testing cycles to test aspects, such as functionality and
Complete performance of the application.
Mark 1.00 out of
1.00

Select one:
a. fourth cycle

b. second cycle

c. third cycle

d. first cycle

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=217822&cmid=1046&showall=1 3/10
8/6/2020 Prelim Examination: Attempt review

Question 16 Changes the speed that it takes for ALM to calculate the KPI data.
Complete

Mark 1.00 out of Select one:


1.00
a. Override Settings

b. Scoreboard

c. Advance area

d. Engines Throttle

Question 17 When you assign a requirement to a cycle, the requirement is not automatically assigned to the release.
Complete

Mark 1.00 out of Select one:


1.00
True

False

Question 18 Enables quality assurance managers to track application readiness by defining goals for activities of an
Complete application release.
Mark 1.00 out of
1.00 Select one:
a. Smart Card Authentication

b. Requirements Management

c. ALM project planning and tracking (PPT)

d. Common Access Card

Question 19 You create a _____ to define the hierarchical framework of releases.


Complete

Mark 1.00 out of Select one:


1.00
a. Attachments

b. Link

c. Details tab

d. Release tree

Question 20 Milestones are used to measure progress in project planning and tracking.
Complete

Mark 1.00 out of


1.00 Select one:
True

False

Question 21 _______are checkpoints on a release timeline used to verify that the release and its interim deliverables
Complete are progressing as planned.
Mark 1.00 out of
1.00

Select one:
a. Scoreboard

b. Thresholds

c. Milestones

d. Analysis

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=217822&cmid=1046&showall=1 4/10
8/6/2020 Prelim Examination: Attempt review

Question 22 Displays KPI calculations that enable you to determine the status of your release.
Complete

Mark 1.00 out of


1.00 Select one:
a. Content tab

b. General tab

c. Detailed tab

d. Scorecard tab

Question 23 In the definition phase, the QA/project manager defines the scope, milestones, and KPIs for the project
Complete in ALM.
Mark 0.00 out of
1.00 Select one:
True

False

Question 24 This cycle ensures that the new features meet the expectations of the business.
Complete

Mark 1.00 out of


1.00 Select one:
a. Cycle 3-Performance Testing

b. Cycle 2-Integrated System Testing

c. Cycle 1-New Features

d. Cycle 4-User Acceptance Testing

Question 25 Enables you to manage resources used by your tests. You can organize your resources by defining a
Complete hierarchical Test Resource tree containing resource folders and resources.
Mark 1.00 out of
1.00 Select one:
a. Business Components module

b. Risk-based Quality Management

c. Test Plan

d. Test Resources

Question 26 Tests the performance of the application for criteria such as number of concurrent users that the
Complete application supports and the response time of the application.
Mark 1.00 out of
1.00 Select one:
a. Cycle 4-User Acceptance Testing

b. Cycle 2-Integrated System Testing

c. Cycle 1- New Features

d. Cycle 3-Performance Testing

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=217822&cmid=1046&showall=1 5/10
8/6/2020 Prelim Examination: Attempt review

Question 27 The foundation of the Management module is the ______.


Complete

Mark 1.00 out of


1.00 Select one:
a. Line of business

b. Modules

c. Release tree

d. Cycles

Question 28 It is a translating business goals/objectives into a realized software-enabled business process.


Complete

Mark 1.00 out of Select one:


1.00
a. Creating plan

b. Creating action plan

c. Creating requirements

d. Creating application

Question 29 A session/user authentication process that permits a user to enter one name and password to access
Complete multiple applications.
Mark 1.00 out of
1.00 Select one:
a. Common Access Card

b. Single Sign-on

c. Requirements Management

d. Smart Card Authentication

Question 30 You can add ______ to a cycle.


Complete

Mark 1.00 out of Select one:


1.00
a. Links

b. Tabs

c. Attachments

d. Tests

Question 31 Enabled for requirements, tests, and test assets to allow distributed teams to collaborate and manage
Complete multiple versions of assets in parallel while maintaining data integrity and providing an audit history of
Mark 1.00 out of changes throughout the project lifecycle.
1.00

Select one:
a. Risk-based Quality Management

b. Test Resources

c. Version control

d. Test Plan

Question 32 If an application flaw is detected while running a test set, you can submit a defect. 
Complete

Mark 1.00 out of


1.00 Select one:
True

F l
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=217822&cmid=1046&showall=1 6/10
8/6/2020 Prelim Examination: Attempt review
False

Question 33 The HP’s strategy and software approach for modern application delivery starts with a what? 
Complete

Mark 1.00 out of


1.00 Select one:
a. Unified classroom

b. Unified application

c. Unified platform

d. Unified information

Question 34 Displays the progress of a release in a Gantt chart.


Complete

Mark 1.00 out of Select one:


1.00
a. Master Plan tab

b. Detailed tab

c. Scorecard tab

d. Content tab

Question 35 Tests the new features of the application implemented in the release.
Complete

Mark 1.00 out of


1.00 Select one:
a. Cycle 2-Integrated System Testing

b. Cycle 3-Performance Testing

c. Cycle 4-User Acceptance Testing

d. Cycle 1-New Features

Question 36 Enables you to schedule PPT calculations for your entire site.
Complete

Mark 1.00 out of


1.00 Select one:
a. Advanced Area

b. None of the choices

c. Purge Area

d. Scheduling Area

Question 37 Indicates whether the scheduled calculation is currently running.


Complete

Mark 1.00 out of Select one:


1.00
a. Active/Inactive

b. Set Refresh Rate

c. Enabled/Disabled

d. Apply settings

Question 38 The Detailed tab enables you to select content to include in the release scope item.
Complete

Mark 1.00 out of Select one:


1.00
True

False

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=217822&cmid=1046&showall=1 7/10
8/6/2020 Prelim Examination: Attempt review

Question 39 Using the _____, you can report flaws in your application and track their repair during all stages of the
Complete application management process.
Mark 1.00 out of
1.00 Select one:
a. ALM Web client

b. SSO

c. CAC

d. Web client

Question 40 Contains the Dashboard tree in which you organize dashboard pages.
Complete

Mark 1.00 out of


1.00 Select one:
a. Analysis Menus tab

b. Live Analysis graphs

c. Live Analysis graphs

d. Dashboard View module

Question 41 Allows you to capture a group of requirements, tests, or test assets at strategic points in the project
Complete lifecycle to mark specific milestones.
Mark 1.00 out of
1.00 Select one:
a. Key Benefits

b. Tracking

c. Key Capabilities

d. Baselining

Question 42 It supports you through all the phases of application lifecycle management. By integrating the tasks
Complete involved in application management.
Mark 1.00 out of
1.00 Select one:
a. Application Lifecycle Management

b. Action Lifecycle Management

c. Activity Lifecycle Management

d. Addition Lifecycle Management

Question 43 ______ are the means for setting objectives on Project Planning and Tracking releases and for planning
Complete and tracking release progress towards these objectives throughout its duration.
Mark 1.00 out of
1.00

Select one:
a. Thresholds

b. Analysis

c. Scope items

d. Scoreboard

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=217822&cmid=1046&showall=1 8/10
8/6/2020 Prelim Examination: Attempt review

Question 44 A test set folder in the Test Lab module contains tests that are covered by your requirements.
Complete

Mark 1.00 out of Select one:


1.00
True

False

Question 45 A _______ is an independent business unit within an organization, with its own set of rules, standards,
Complete resources, objectives, and applications.
Mark 1.00 out of
1.00 Select one:
a. Sample Release Tree

b. Releases and Cycles throughout ALM

c. Line of business (LOB)

d. Release Module Icons

Question 46 The testing process begins with defining defect in the Management module.
Complete

Mark 1.00 out of Select one:


1.00
True

False

Question 47 After adding a cycle to a release, you specify the details for the cycle using the _____.
Complete

Mark 1.00 out of


1.00 Select one:
a. Details tab

b. Cycle tab

c. Attachment

d. Button

Question 48 Refreshes the scorecard table, so that it displays the most up-to-date information.
Complete

Mark 1.00 out of


1.00 Select one:
a. Scorecard layout

b. Scoreboard

c. None of the choices

d. Generate

Question 49 Contains the Analysis tree in which you organize all of your analysis items. 
Complete

Mark 1.00 out of


1.00 Select one:
a. Live Analysis graphs

b. Analysis Menus tab

c. Dashboard view module

d. Analysis View module

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=217822&cmid=1046&showall=1 9/10
8/6/2020 Prelim Examination: Attempt review

Question 50 Enables you to purge calculations after a specific time period.


Complete

Mark 1.00 out of Select one:


1.00
a. Advanced Area

b. Purge Area

c. None of the choices

d. Scheduling Area

Module 5-WORKING WITH


◄ Prelim Quiz 2 Jump to... REQUIREMENTS AND ANALYZING RISK

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=217822&cmid=1046&showall=1 10/10

You might also like