1-2 Shift Solenoid Valve Replacement

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1-2 Shift Solenoid Valve Replacement

Callout Component Name


Preliminary Procedures

1. Disconnect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .
2. Remove the control valve body cover. Refer to Control Valve Body Cover Replacement .

1-2 Shift Solenoid Valve Bolt (Qty: 1)

Caution: Refer to Fastener Caution in the Preface section.

Procedure
1
Disconnect the 1-2 shift solenoid valve electrical connector.

Tighten
8 N·m (71 lb in)
2 1-2 Shift Solenoid Valve

1/1

You might also like