IBS CALCULATION

ELEMENTS AREA IBS COVERAGE IBS SCORE


(m2) FACTOR (%)
Part 1 : Structural Elements
1. Precast concrete beam
+ In-situ concrete using
steel formworks + 90.95 0.9 0.5 0.9  0.5  50
Precast half slabs floor.
 22.5
2. Roof truss-
Prefabricated timber 90.95 1.0 1.0  0.5  50
roof truss 0.5
 25
Roof area =
Total Part 1 181.9 1.00 47.5
ELEMENTS LENGTH IBS COVERAGE IBS SCORE
(m) FACTOR
Part 2 : Wall Systems
1. Internal wall using
Precast concrete panel 39.1 0.5 0.65 0.5 X 0.65 X
20 = 6.5

2. External wall using 21 1.0 0.35 1 X 0.35 X 20


Precast block works =7
Total Part 2 60.1 1.0 13.5
ELEMENTS COVERAGE IBS SCORE
Part 3 : Other Simplified
Solutions
1. Beams : 60% complies 60% 2
with MS 1064 Part
10:2001
2. Columns : 100% complies 100% 4
with MS 1064 Part
10:2001
3. Wall : Less than 50% 50% 0
complies with MS 1064
Part 10:2001
4. Slab : less than 50% 50% 0
complies with MS 1064
Part 10:2001 80% 4
5. Doors: 80% complies with
MS 1064 Part 4:2001
0% 0
6. Windows : 0% complies
with MS 1064 Part 5:2001
7. Horizontal repetition of 100% 6
structure = 100%
Total Part 3 16
IBS CONTENTS SCORE OF 77
PROJECT ( Part 1 + Part 2 + Part 3 )
CONCLUSION

The conclusion from this mini project is we are able to make


house plan through autocad. From autocad, we are also able to
make a mini house from the plan that we make through the
autocad. This mini project make our team and responsibility
increase as we are doing it together because it was a group
assigment.

You might also like