Housing Complex “ELITA GARDEN VISTA” at Plot No.

– III E-4 & III E-


4/1, Action Area – III, New Town, Dist. North 24-Parganas

FORM 1

(I) Basic Information

Sl. Item Details


No.
Whether it is a violation case and Yes
application is being submitted under
Notification No. S.O. 804(E) dated
14.03.2017
Type of Violation Construction started without EC
Details of Violation The project comes under WBHIDCO area.
WBHIDCO issued letter to the Owner/
Developer that the project did not require any
Environmental Clearance as the total
WBHIDCO area received Environmental
Clearance. Subsequently the ownership has
changed. As such, the new management took
over the project and the company for
completing the balance part of the project.
After taking over the project, the new
management as abundant precaution decided
to take the environment clearance, as such,
this application.
1 Name of the project “ELITA GARDEN VISTA”- Building and
Construction project
2 Sl. No. in the schedule Sl. No.8 (b)
3 Proposed capacity/area/length/ tonnage Phase – 1
to be handled/ command area/lease Residential Blocks
area/number of wells to be drilled Block 1- G+14,
Block 2- G+17,
Block 3- G+24,
Block 4- G+29,
Block 5- G+29,
Block 14- G+24,
Block 15- G+17,
Block 16- G+14
Podium
Phase-2
Residential Blocks
Block 6- G+21,
Block 7- G+18,

Form I Page 1 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

Block 8- G+27,
Block 9- G+18,
Block 10- G+21,
Block 11- G+27,
Block 12- G+30,
Block 13- G+30,
Facilities & Utility Block : B+G+8
Club - Single storied & club with lounge –
G+1
On a land area 99983 sqm.
4 New /Expansion/Modernization New (violation)
5 Existing Capacity/ Area etc. Phase – 1 : Completed and handed over
Residential Blocks
Block 1- G+14,
Block 2- G+17,
Block 3- G+24,
Block 4- G+29,
Block 5- G+29,
Block 14- G+24,
Block 15- G+17,
Block 16- G+14
Podium

Phase-2
Residential Blocks : 3 Blocks casting
completed (Block 11- G+27,
Block 12- G+30, Block 13- G+30),

Residential Blocks : 4 Blocks


construction ongoing (Block 6- G+21,
Block 7- G+18, Block 8- G+27, Block 9-
G+18, Block 10- G+21),

Facilities & Utility Block and Club Block


: Yet to start the construction : Facilitys
and Utility Block of B+G+8 and Club -
Single storied & club with lounge –G+1
6 Category of project i.e. ‘A’ or ’B’ Category B1 (Covering an area of ≥ 50 ha or
built up area ≥ 1,50,000 sqm.)

7 Does it attract the general condition? If No


yes, please specify.
8 Does it attract the specific condition? If No
yes, please specify.
9 Location New Town

Form I Page 2 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

Plot/Survey/Khasra No. Plot No. – III E-4 & III E-4/1, Action Area –
III, New Town, Dist. North 24-Parganas
Village -
Tehsil -
District 24 Parganas (North)
State West Bengal
10 Nearest railway main station/airport along Bidhannagar Road Railway Station – 6.5
with distance in kms. kms (aerial distance)
Netaji Subhas Chandra Bose International
Airport Airport – 7 kms (aerial distance)
11 Nearest Town, City District Headquarters Kolkata
along with distance in kms.
12 Village Panchayats, Zilla Parishad, New Town Kolkata Development Authority
Municipal Corporation, Local body (NKDA).
(complete postal addresses with 03, MAR, New Town, Kol-700156.
telephone nos. to be given) Phone: 033-2324 2324/2132/2351,
13 Name of the applicant Elita Garden Vista Project Pvt. Ltd.
14 Registered Address 3/1 Dr. U.N. Brahmachari Street.
Kolkata-700017
15 Address for correspondence:
Name Sajal Kumar Bose
Designation (Owner/Partner/CEO) Vice President (Projects)
Address 3/1 Dr. U.N. Brahmachari Street.
Kolkata-17
Pin Code 700017
E-mail sajalkbose@surekagroup.com
Telephone No. 033-22871221/4
Fax No. 033-22873904
16 Details of Alternative Sites examined, if
any. Location of these sites should be NA
shown on a topo sheet.
17 Interlinked Projects No
18 Whether separate application of No
interlinked project has been submitted?
19 If yes, data of submission NA
20 If no, reason NA
21 Whether the proposal involves No
approval/clearance under: if yes, details
of the same and their status to be given.
(a) The Forest (Conservation) Act, 1980?
(b) The Wildlife (Protection) Act, 1972?
(c) The CRZ Notification, 1991?
22 Whether there is any Government No
Order/Policy relevant/relation to the site?

Form I Page 3 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

23 Forest land involved (hectares) NA


24 Whether there is any litigation pending No
against the project and/or land in which
the project is propose to be set up?

(II) Activity

1. Construction, operation or decommissioning of the Project involving


actions, which will cause physical changes in the locality (topography, land
use, changes in water bodies, etc.)

Sl. Information/Checklist Yes/ Details thereof (with approximate quantities /rates,


No. confirmation No wherever possible) with source of information data
1.1 Permanent or temporary No The project area is dedicated for residential buildings with small
change in land use, land commercial component. Total land area is 99983 sqm. Land Deed
cover or topography is enclosed as Annexure – I.
including increase in
intensity of land use (with
respect to local land use
plan)
1.2 Clearance of existing land, No
vegetation and
buildings?
1.3 Creation of new land No
uses?
1.4 Pre-construction Yes Soil testing has already been done.
investigations e.g. bore
houses, soil testing?
1.5 Construction works? Yes Construction work from Block 1-5 & 14-16 and Podium already
constructed and handed over to the residents and Block 11, 12
and 13 casting completed, Block 6 – 10 construction ongoing and
Facility and Utility Block and Club house yet to start the
construction.
1.6 Demolition works? No
1.7 Temporary sites used for Yes Temporary labour hut for the workers has been constructed within
construction works or the complex with all sanitary facilities and drinking water.
housing of construction
workers?
1.8 Above ground buildings, Yes Construction work from Block 1-5 & 14-16 and Podium already
structures or earthworks constructed and handed over to the residents and Block 11, 12
including linear structures, and 13 casting completed, Block 6 – 10 construction ongoing and
cut and fill or excavations Facility and Utility Block and Club house yet to start the
construction. Cutting and filling have been done during foundation
work.

Form I Page 4 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

1.9 Underground works Yes Pile foundations, Basements, Water reservoirs.


including mining or
tunneling?
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and No
manufacturing processes?

1.14 Facilities for storage of Yes Different raw materials, tools and tackles for construction are being
goods or materials? stored in temporary godowns.
1.15 Facilities for treatment or No (i) Garbage will be segregated at source for biodegradable, non
disposal of solid waste or biodegradable recyclables and non-biodegradable inert material
liquid effluents? during construction (140 kg/day) and operational phase (4515
kg/day) and finally disposed off following Municipal Solid Waste
Management Rules 2016 by NKDA.

Person Rate Total


kg/capita/day kg/day
Flats 7555 0.5 3777.5
Club 200 0.45 90
Facilities & Utility Block 300 0.15 45
(fixed)
Service persons 200 0.15 30
Floating Population 2900 0.1 290
STREET SWEEPING 11155 0.025 278.875
GRAND TOTAL 4511.38
SAY 4415

(ii) The wastewater generated from this Project during


operational phase will be around 1050 KLD.

Flat Occu Total Lpcd Total KLD


No. . Rate popu. litre/day
Residential 1511 5 7555 150 1133250 1133
Club 200 45 9000 9
Facilities & Utility 300 45 13500 14
Block (fixed)
Service persons 200 45 9000 9
Floating Population 2900 15 43500 44
Sub Total 1 1209
Landscaping 181
Car washing 81
Swimming pool 10

Form I Page 5 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

Losses 14
Sub Total 2 286
TOTAL WATER REQUIREMENT 1495
Total Wastewater Generation 1050
Total Wastewater discharge 448
Total Recycling 602
Landscaping 181
Flushing 340
Car washing 81
Fresh Water Requirement 893

OCCUPANCY RATE AS PER NBC 2005, PART 9, PAGE 20, PARA 4.3.1.1

Source: WBHIDCO
Wastewater generation from the proposed project will be 1050
KLD. The wastewater will be collected through a well designed
sewer network leading to STP, based on FAB/MBBR Technology
followed by tertiary system and reused as much as possible.

RECYCLED : 602 KLD (Flushing : 340 KLD, Landscaping : 181


KLD and Car Washing : 81 KLD)

The excess treated wastewater that will be discharged to


WBHIDCO sewer line in front of the project site – 448 KLD.

Wastewater originating from labour hut is being diverted to septic


tank followed by soak pit during construction phase.
1.16 Facilities for long term NO Long term housing for operational workers is not required. Only
housing of operational few security personnel will be staying.
workers?
1.17 New road, rail or sea NO
traffic during construction
or operation?
1.18 New road, rail, air NO
waterborne or other
transport infrastructure
including new or altered
routes and stations, ports,
airports etc?
1.19 Closure or diversion of NO
existing transport routes or
infrastructure leading to
changes in traffic
movements?
1.20 New or diverted NO
transmission lines or
pipelines?

Form I Page 6 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

1.21 Impoundment, damming, NO


culverting, realignment or
other changes to the
hydrology of watercourses
or aquifers?
1.22 Stream crossings? NO
1.23 Abstraction or transfers of NO Fresh water required during operational phases is 821 KLD (Total
water form ground or water demand 1495 KLD). Water required for constructional and
surface waters? operational phase will be supplied by WBHIDCO. All the facilities
will be provided by WBHIDCO and it is mentioned in the NKDA
Building By laws.
1.24 Changes in water bodies NO
or the land surface
affecting drainage or run-
off?
1.25 Transport of personnel or Yes The vehicles used for transportation of materials have valid
materials for construction, Pollution Under Control (PUC) certificates. The vehicle movement
operation or is less because all construction materials are being collected
decommissioning? through local agencies. Most of the personnel associated with the
project use public transportation system.
1.26 Long-term dismantling or NO
decommissioning or
restoration works?
1.27 Ongoing activity during NO Decommissioning has negligible impact on the environment
decommissioning which because ongoing activity is of very short duration. Demolition is
could have an impact on being done within an enclosure of a suitable height along with
the environment? water sprinkling arrangement for dust suppression so that dusts do
not travel outside the premises.
1.28 Influx of people to an area Yes Construction workers of around 700 persons are working in peak
in either temporarily or period on a temporary basis. During operation about 7555 persons
permanently? will occupy the complex if the occupancy is 100%.
1.29 Introduction of alien NO
species?
1.30 Loss of native species or NO
genetic diversity?
1.31 Any other actions? NO

2. Use of Natural resources for construction or operation of the Project (such as


land, water, materials or energy, especially any resources which are non-
renewable or in short supply):
Sl. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, wherever
confirmation No possible) with source of information data
No.
2.1 Land especially No Land Deed is given herewith as Annexure - 1.
undeveloped or agricultural
land (ha)

Form I Page 7 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

2.2 Water (expected source & Yes


competing users) unit: KLD Flat Occu Total Lpcd Total KLD
No. . Rate popu. litre/day
Residential 1511 5 7555 150 1133250 1133
Club 200 45 9000 9
Facilities & Utility 300 45 13500 14
Block (fixed)
Service persons 200 45 9000 9
Floating Population 2900 15 43500 44
Sub Total 1 1209
Landscaping 181
Car washing 81
Swimming pool 10
Losses 14
Sub Total 2 286
TOTAL WATER REQUIREMENT 1495
Total Wastewater Generation 1050
Total Wastewater discharge 448
Total Recycling 602
Landscaping 181
Flushing 340
Car washing 81
Fresh Water Requirement 893

OCCUPANCY RATE AS PER NBC 2005, PART 9, PAGE 20, PARA 4.3.1.1

Source: WBHIDCO through PHED

Wastewater originating from labour hut is being diverted to septic


tank followed by soak pit to existing sewerage collection network
during construction phase.
2.3 Minerals (MT) No

Form I Page 8 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

2.4 Construction material stone, Yes Material Quantity Source

aggregates, sand/soil Bricks 20531900 PCs Brick field


(expected source – MT) Cement 41480 Ton From reputed manufacturer
Sand 4578200 CFT Birbhum
Stone chips 3052135 CFT Pakur
2.5 Forests and timber (source Yes Use of timber has been kept as less as possible. However, the
– MT) required quantity is being procured only from the vendor
authorized by the competent authority.
2.6 Energy including electricity Yes Electricity will be supplied by NTESCL (Electrical load of about
and fuels (source, 9350 KVA). DG sets (9 nos. 1000 KVA & 1 no 350 KVA) will be
competing users) Unit: fuel installed for backup power. The emission from DG sets will be
(MT), energy (MW) discharged through stack 6.3 mt. for the 1000 KVA and 3.7 mt for
the 350 KVA set respectively above the roof of the buildings. Fuel
(diesel) required for DG sets will be around 1496 litres/hr.
2.7 Any other natural No
resources (use appropriate
standard units)

3. Use, storage, transport, handling or production of substances or materials,


which could be harmful to human health or the environment or raise
concerns about actual or perceived risks to human health.

Sl. Information/Checklist Yes/ Details thereof (with approximate quantities/rates,


No. confirmation No wherever possible) with source of information data
3.1 Use of substances or No The construction materials which are being handled, stored
materials, which are and used are mostly non hazardous. The hazardous waste
hazardous (as per MSIHC are mainly of centering oil, grease, water proofing
rules) to human health or compounds, paints, wood dust from treated wood, discarded
the environment (flora, lube oil etc.. Special care is being taken to prevent spillage or
fauna, and water supplies) mixing of the hazardous waste with major portion of non-
hazardous waste. Discarded lube oil is being stored in HDPE
container as per Hazardous Waste (M&H) Rules 2016 and its
subsequent amendments and finally sold to the authorized
vendor of MOEF.
3.2 Changes in occurrence of No During construction phase disinfectant is being used
disease or affect disease whenever necessary to control insects.
vectors (e.g. insect or
water borne diseases)
3.3 Affect the welfare of No
people e.g. by changing
living conditions?

Form I Page 9 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

3.4 Vulnerable groups of No


people who could be
affected by the project e.g.
hospital patients, children,
the elderly etc.,
3.5 Any other causes No

4. Production of solid wastes during construction or operation or


decommissioning (MT/month)

Sl. Information/Checklist Yes/ Details thereof (with approximate quantities/rates,


No. confirmation No wherever possible) with source of information data
4.1 Spoil, overburden or mine No
wastes
4.2 Municipal waste (domestic Yes During Construction and operation phases about 140
and or commercial kg/day and 4515 kg/day of domestic solid waste (garbage)
wastes) respectively will be generated.
4.3 Hazardous wastes (as per Yes The construction materials which are being handled, stored
Hazardous Waste and used are mostly non hazardous. The hazardous waste
Management Rules) are mainly of centering oil, grease, water proofing
compounds, paints, wood dust from treated wood,
discarded lube oil etc.. Special care is being taken to
prevent spillage or mixing of the hazardous waste with
major portion of non-hazardous waste. Discarded lube oil
is being stored in HDPE container as per Hazardous
Waste (M&H) Rules 2016 and its subsequent amendments
and finally sold to the authorized vendor of MOEF.
4.4 Other industrial process No
wastes
4.5 Surplus product No
4.6 Sewage sludge or other Yes Sewage sludge will be disposed off by WBHIDCO.
sludge from effluent
treatment
4.7 Construction or demolition Yes Solid waste generated from construction activities will be
wastes about 2810 Tonnes. Other construction waste will be used
in the site and road preparation work. These wastes will
not contain any asbestos or hazardous material.
4.8 Redundant machinery or No
equipment
4.9 Contaminated soils or No
other materials
4.10 Agricultural wastes No
4.11 Other solid wastes No

Form I Page 10 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sl. Information/Checklist Yes/ Details thereof (with approximate quantities / rates,


No. confirmation No wherever possible) with source of information data
5.1 Emissions from Yes (i) DG sets will be installed for backup power. The
combustion of fossil fuels emission from DG sets (9 nos. 1000 KVA & 1 no.350
from stationary or mobile KVA) will be discharged through stack of 6.3 mt for
sources 1000 KVA and 3.7 mt for 350 KVA set respectively
above the roof of the buildings. Fuel (diesel) required
for DG sets will be around 1496 litre/hr. The emission
from DG sets will be maintained as per the norms of
CPCB given below
PM < 0.3 G/kw-hr
CO < 3.5 G/kw-hr
HC < 1.3 G/kw-hr
NO2< 9.2 G/kw-hr
(ii) The vehicles being used for transportation of materials
have a valid Pollution Under Control (PUC) certificate.
5.2 Emissions from production No
processes
5.3 Emissions from materials Yes The site has been enclosed to a height of 3 Mt. Hauling
handling including trucks are covered with tarpaulin to minimize the spillage
storage or transport during transportation. Fugitive dust generated from the
material handling areas. Water sprinkling arrangement has
been provided to minimize the dust generation.
5.4 Emissions from Yes Only from DG sets running during power failure and
construction activities operation of vibrator machines during construction.
including plant and
equipment
5.5 Dust or odour from Yes Fugitive dust is being generated from the material handling
handling of materials areas. Water sprinkling arrangement has been made to
including construction minimise the dust generation.
materials, sewage and
waste
5.6 Emissions from No
incineration of waste
5.7 Emissions from burning of No
waste in open air (e.g.
slash materials,
construction debris)
5.8 Emissions from any other No
sources

Form I Page 11 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sl. Information/Checklist Yes Details thereof (with approximate quantities/rates,


No. confirmation / wherever possible) with source of information data
No with source of information data
6.1 From operation of Yes (i) Possible source of vibration and noise is from DG sets.
equipment e.g. engines, The DG sets will be acoustically enclosed to restrict the
ventilation plant, crushers sound level as stipulated by the CPCB. The foundation of
the DG sets will be designed in a manner to minimize the
vibration.
(ii) From Vibrator machines only during construction. But the
vibration and noise will be confined within close proximity of
machine.
(iii) From piling rigs during construction. But this will be
within permissible limit.
6.2 From industrial or similar No
processes
6.3 From construction or Yes Equipment used for demolition and construction work
demolition generates noise and the anticipated noise levels are
tabulated below.
Equipments Typical Noise levels DB(A)
50 ft from source
Air Compressor 81
Compactor 82
Concrete Mixer 85
Concrete pump 82
Concrete vibrator 76
Jack Hammer 88
Paver 89
Pile driver 96-101
Pump 76
Shovel 82
Mobile Crane 83
Roller 74
Source : Transit Noise and Vibration Impact
Assessment, Final report, 1995 by US Department of
Transportation
But this is not causing any disturbance to the neighbouring
areas.
6.4 From blasting or piling No -
6.5 From construction or Yes (i) During construction phase it has been ensured that
operational traffic vehicles have valid Pollution Under Control (PUC) certificate

Form I Page 12 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

for transportation of construction materials.


(ii) During operational phase the vehicles to be used by the
occupants shall have PUC certificate.
(iii) Traffic movement right now is being controlled by the
security personnel inside the premises.
6.6 From lighting or cooling No
systems
6.7 From any other sources No

7. Risks of contamination of land or water from releases of pollutants into the


ground or into sewers, surface waters, groundwater, coastal waters or the
sea:

Sl. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates,


No. confirmation No wherever possible) with source of information data
7.1 From handling, storage, Yes The construction materials being handled, stored and used
use or spillage of are mostly of non hazardous type. The hazardous wastes
hazardous materials are mainly of centering oil, grease, water proofing
compounds, paints, wood dust from treated wood,
discarded lube oil etc. Special care is being taken to
prevent spillage and health hazard. Discarded lube oil is
being stored in HDPE container as per Hazardous Waste
(M&H) Rules 2016 and its subsequent amendments and
finally sold to the authorized vendor of MOEF.
7.2 From discharge of No Wastewater generation from the proposed project will be
sewage or other effluents 1050 KLD. The wastewater will be collected through a well
to water or the land designed sewer network leading to STP, based on
(expected mode and place FAB/MBBR Technology followed by tertiary system and
of discharge) reused as much as possible.

RECYCLED : 602 KLD (Flushing : 340 KLD, Landscaping :


181 KLD and Car Washing : 81 KLD)

The excess treated wastewater that will be discharged to


NKDA sewer line in front of the project site – 448 KLD.
7.3 By deposition of pollutants No Nothing mention worthy pollutants will be emitted to air,
emitted to air into the land which may cause dry/wet deposition on the land or water.
or into water
7.4 From any other sources No
7.5 Is there a risk of long term No
build up of pollutants in the
environment from these
sources?

Form I Page 13 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

8. Risk of accidents during construction or operation of the Project, which


could affect human health or the environment

Sl. Information/Checklist Yes Details thereof (with approximate quantities/rates,


No. confirmation / wherever possible) with source of information data
No
8.1 From explosions, No
spillages, fires etc from
storage, handling, use or
production of hazardous
substances
8.2 From any other causes No
8.3 Could the project be Yes During design all precautions for disaster management was
affected by natural considered as per NBC, IS codes and other statutory
disasters causing norms.
environmental damage
(e.g. floods, earthquakes,
landslides, cloudburst
etc.)?

9. Factors which should be considered (such as consequential development)


which could lead to environmental effects or the potential for cumulative
impacts with other existing or planned activities in the locality

Sl. Information/Checklist Yes/ Details thereof (with approximate quantities /rates,


No. confirmation No wherever possible) with source of information data
9.1 Lead to development of Yes (i) Electric power will be supplied by NTESCL.
supporting facilities,
ancillary development or (ii) Internal roads are being constructed by the project
development stimulated proponent.
by the project which could
have impact on the (iii)The construction waste is being used in site preparation
environment e.g.: and road work. These wastes do not contain any asbestos
or hazardous material.
• Supporting
infrastructure (roads, (iv) Sufficient numbers of colour coded (For organic,
power supply, waste or Inorganic recyclable and Inorganic inert) storage bins have
waste water treatment, been provided to store the municipal solid waste
etc.) (garbage).These will finally be disposed off by NKDA as per
• housing development Municipal Solid Waste Management Rules 2016.
• extractive industries

Form I Page 14 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

• supply industries
• other
9.2 Lead to after-use of the No
site, which could have an
impact on the
environment
9.3 Set a precedent for later No
developments
9.4 Have cumulative effects No Many building construction projects exist in close vicinity of
due to proximity to other the proposed project.
existing or planned
projects with similar
effects

Form I Page 15 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

(III) Environmental Sensitivity

Sl. Areas Name/ Aerial distance (within 15


No. Identity km.)
Proposed project location
boundary
1 Areas protected under international conventions, East Kolkata Within 3 kms.
national or local legislation for their ecological, Wetlands
landscape, cultural or other related value
2 Areas which are important or sensitive for ecological East Kolkata Within 3 kms.
reasons - Wetlands, watercourses or other water Wetlands
bodies, coastal zone, biospheres, mountains, forests
3 Areas used by protected, important or sensitive East Kolkata Within 3 kms.
species of flora or fauna for breeding, nesting, Wetlands
foraging, resting, over wintering, migration
4 Inland, coastal, marine or underground waters No
5 State, National boundaries No
6 Routes or facilities used by the public for access to No
recreation or other tourist, pilgrim areas
7 Defense installations Ordinance Within 6 kms.
Factory,
Rajabagan
Estate,
Jessore Road,
Dumdum,Kolk
ata 700028
8 Densely populated or built-up area Rajarhat Within 5 kms.

9 Areas occupied by sensitive man-made land uses Many hospital, Within 15 km


(hospitals, schools, places of worship, community school and
facilities) college
10 Areas containing important, high quality or scarce No
resources (ground water resources, surface
resources, forestry, agriculture, fisheries, tourism,
minerals)
11 Areas already subjected to pollution or environmental No
damage. (those where existing legal environmental
standards are exceeded)
12 Areas susceptible to natural hazard which could No
cause the project to present environmental problems
(earthquakes, subsidence, landslides, erosion,
flooding or extreme or adverse climatic conditions)

Form I Page 16 of 17
Housing Complex “ELITA GARDEN VISTA” at Plot No. – III E-4 & III E-
4/1, Action Area – III, New Town, Dist. North 24-Parganas

(IV). Proposed Terms of Reference for EIA studies

I hereby give undertaking that the data and information given in the application
and enclosures are true to the best of my knowledge and belief and I am aware
that if any part of the data and information submitted is found to be false or
misleading at any stage, the project will be rejected and clearance given, if any,
to the project will be revoked at our risk and cost.

Date:
Place: Kolkata

Sajal Kumar Bose, Vice President (Projects)


Elita Garden Vista Project Pvt. Ltd.
3/1 Dr. U.N. Brahmachari Street, Kolkata-700017

Note:

1. The projects involving clearance under Coastal Regulation Zone Notification, 1991 shall
submit with the application a C.R.Z map duly demarcated by one of the authorized agencies,
showing the project activities , w.r.t. C.R.Z (at the stage of TOR) and the recommendations of
the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action
shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z
Notification, 1991 for the activities to be located in the CRZ.

2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere


Reserves, Migratory Corridors of wild animals, the project proponent shall submit the map
duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the project
location and the recommendations or comments of the Chief Wildlife Warden thereon (at the
stage of EC).

3. All correspondence with the Ministry of Environment & Forest including submission of
application for TOR/Environmental Clearance, subsequent clarification, as may be required
from time to time, participation in the EAC Meeting on behalf of the project proponent shall be
made by the authorized signatory only. The authorized signatory should also submit a
document in support of his claim of being an authorized signatory for the specific project.

Form I Page 17 of 17