DHA QUETTA

DEVELOPMENT OF DHA QUETTA

SECTOR A-4

BILL OF QUANTITIES

VOLUME-III
DHA QUETTA (SECTOR A-4)
GRAND SUMMARY

S. NO. DESCRIPTION AMOUNT (PKR)

1 ROAD WORK
2 STORM WATER DRAINAGE SYSTEM
3 SEWERAGE SYSTEM
4 WATER SUPPLY
5 UTILITY CROSSING DUCTS
6 ELECTRIFICATION
TOTAL AMOUNT =
DHA QUETTA (SECTOR A-4)
SUMMARY (ROAD WORK)

S. NO. DESCRTIPTION AMOUNT (PKR)

Bill No. 01 EARTH WORK AND ALLIED ACTIVITIES


Bill No. 02 SUB BASE AND BASE
Bill No. 03 SURFACE COURSES AND PAVEMENT
Bill No. 06 ANCILLARY WORKS
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES & COST
BILL NO. 01 EARTHWORK
AMOUNT
Item No Description Unit QUANTITY Rate
(PKR)
101 CLEARING AND GRUBBING SM 353,534.00
104 COMPACTION OF NATURAL GROUND SM 353,534.00
EXCAVATE UNSUITABLE COMMON
106a CM 5,000.00
MATERIAL
EXCAVATE UNSUITBALE SOFT ROCK
106biii CM 1,000.00
MATERIAL
STRUCTURAL EXCAVATION IN COMMON
107a CM 1,000.00
MATERIAL
107d GRANULAR BACKFILL CM 1,000.00
107 COMMON BACKFILL CM
FORMATION OF EMBANKMENT FROM
108a ROADWAY EXCAVATION IN COMMON CM 399,868.31
MATERIAL
FORMATION OF EMBANKMENT FROM
108c BORROW EXCAVATION IN COMMON CM 614,928.19
MATERIAL
FORMATION OF EMBANKMENT FROM
108d STRUCTURAL EXCAVATION IN COMMON CM 1,000.00
MATERIAL
109a SUBGRADE PREPARATION IN EARTH CUT SM 88,383.00

Sum of Bill No. 01 Carried to Summary (Road Work) =


DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES & COST
BILL NO. 02 SUB BASE AND BASE
Item No Description Unit QUANTITY Rate AMOUNT (PKR)

201 GRANULAR SUB-BASE CM 50,483.00


202 AGGREGATE BASE CM 36,060.00
ASPHALTIC BASE COURSE PLANT MIX
203B (CLASS B) CM 6,990.00
Sum of Bill No. 02 Carried to Summary (Road Work) =
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES & COST
BILL NO. 03 SURFACE COURSES AND PAVEMENT
Item No Description Unit QUANTITY Rate AMOUNT (PKR)
CUT-BACK ASPHALT FOR BITUMINOUS
302a SM 200,385.00
PRIME COAT
CUT-BACK ASPHALT FOR BITUMINOUS
303a SM 130,004.00
TACK COAT.
ASPHALTIC CONCRETE FOR WEARING
305b COURSE (CLASS B) CM 10,018.00

Sum of Bill No. 03 Carried to Summary (Road Work) =


DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES & COST
BILL NO. 06 ANCILLARY WORKS
Item No Description Unit QUANTITY Rate AMOUNT (PKR)

401f LEAN CONCRETE CM 6,019.00


PRECAST CURB IN CONCRETE CLASS A-1
601dii OF SIZE 450X150 mm INCL. BEDDING & M 44,026.00
HAUNCHING
SP CURB GUTTER M 10,743.00
PAVEMENT MARKING IN NON-REFLECTIVE
608b1 M 14,670.00
CR PAINT FOR LINES OF 15 cm WIDTH
PAVEMENT MARKING IN NON-REFLECTIVE
608c1 M 49,992.00
CR PAINT FOR LINES OF 20 cm WIDTH
607A TRAFFIC ROAD SIGNS CATEGORY 1 EACH 16.00
PROVIDING AND LAYING CEMENT
CONCRETE PAVING STONE 60MM THICK IN
NATURAL COLOUR AS IN FLOORS,
STREETS, PUBLIC PARKING ETC;ANY
Mes :12-22 SM 60,190.00
PATTERN AND SHAPE (HYDRAULICALLY
COMPRESSED) LAID AND JOINTED IN SAND
INCLUDING 50MM THICK SAND BED AS
LAYING COARSE ALL AS SPECIFIED.

Sum of Bill No. 06 Carried to Summary (Road Work) =


DHA QUETTA (SECTOR A-4)
SUMMARY (DRAINAGE SYSTEM/ STORM WATER)

S. NO. DESCRTIPTION AMOUNT (PKR)

1 DRAINAGE SYSTEM / STORM WATER NETWORK

TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =


ABSTRACT OF QUANTITIES
DRAINAGE SYSTEM/ STORM WATER
RATE AMOUNT
PAY ITEM DESCRIPTION UNIT QUANTITY
(PKR) (PKR)
Excavation as in hard soil upto 1.5m
depth, in foundation and pipe
trenches upto 1.5 m wide in shafts,
wells and independent holes upto 30
sqm each and throw earth clear of
MES:'01-02 edges of excavation within 10 m. CM 13,869.06
timbering to be paid extra (trench
over 1.5 m width will be treated as
areas).

Providing and laying of cement


concrete Type 'B' using broken or
crushed stone as specified in walls,
sills, copings, channels, drains,
MES:'03-16 CM 6,110.43
steps, string courses, corbels, pier
caps, hinge stones, bed plates etc,
including form work and fair faces to
exposed surfaces.
Providing and laying of cement
MES:03-08 concrete 1:4:8 using crushed or CM 951.50
broken stone graded as specified
Burnt brick work in wall over 115 mm
thick laid and jointed in cement
MES:'04-09 mortar 1:6 straight or to curve with CM 258.05
inner radius of 6 m and over upto g.f
roof level.
RCC PIPE
Supply and fix reinforced cement
concrete pipes 300mm bore, laid and
MES 21-07 jointed with spigot socket or tongue METER 5,147.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 375mm bore, laid and
MES 21-08 jointed with spigot socket or tongue METER 1,022.00
and groove joint incl rubber ring, as
specified.
supply and fix reinforced cement
concrete pipes 450mm bore, laid and
MES 21-09 jointed with spigot socket or tongue METER 326.00
and groove joint incl rubber ring, as
specified.
ABSTRACT OF QUANTITIES
DRAINAGE SYSTEM/ STORM WATER
RATE AMOUNT
PAY ITEM DESCRIPTION UNIT QUANTITY
(PKR) (PKR)
supply and fix reinforced cement
concrete pipes 525mm bore, laid and
MES 21-10 jointed with spigot socket or tongue METER 325.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 600mm bore, laid and
MES 21-11 jointed with spigot socket or tongue METER 336.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 675mm bore, laid and
MES 21-12 jointed with spigot socket or tongue METER 575.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 750mm bore, laid and
MES 21-13 jointed with spigot socket or tongue METER 311.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 825mm bore, laid and
MES 21-14 jointed with spigot socket or tongue METER 735.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 900mm bore, laid and
MES 21-15 jointed with spigot socket or tongue METER 914.00
and groove joint incl rubber ring, as
specified.
ABSTRACT OF QUANTITIES
DRAINAGE SYSTEM/ STORM WATER
RATE AMOUNT
PAY ITEM DESCRIPTION UNIT QUANTITY
(PKR) (PKR)
Supply and fix reinforced cement
concrete pipes 1050mm bore, laid
MES 21-16 and jointed with spigot socket or METER 114.00
tongue and groove joint incl rubber
ring, as specified.
Supply and fix reinforced cement
concrete pipes 1200mm bore, laid
MES 21-17 and jointed with spigot socket or METER 314.00
tongue and groove joint incl rubber
ring, as specified.
Supply and fix reinforced cement
concrete pipes 1350mm bore, laid
MES 21-17
and jointed with spigot socket or METER 662.00
Prorata
tongue and groove joint incl rubber
ring, as specified.
Supply and fix reinforced cement
concrete pipes 1500mm bore, laid
MES 21-17
and jointed with spigot socket or METER 54.00
Prorata
tongue and groove joint incl rubber
ring, as specified.
ABSTRACT OF QUANTITIES
DRAINAGE SYSTEM/ STORM WATER
RATE AMOUNT
PAY ITEM DESCRIPTION UNIT QUANTITY
(PKR) (PKR)
CONCRETE MANHOLE -
Supply and fix bars round, using
deformed bars grade - 60 including
MES: 09-56 KG 200,369.20
cutting, bending, binding and placing
reinforcement in position.
M.S GRATING ON MANHOLE
Providing & lanying ms. grating as
per drawing and design complete in
SP EACH 366.00
all respect.

Providing and laying RCC type B


manhole cover (precast complete
with angle iron frame embedded in
MES: 21-35 concrete all as per information sheet EACH 366.00
No. Svcs-341

Providing of sand cushion in layers


as specified, under concrete roads,
MES: '02-91 hard standings, landing ground etc. CM 538.27

CEMENT PLASTERING
13mm thick cement plaster 1:3
MES: 13-3 SM 1,262.19
finished as specified.

Total Amount Carried to Grand Summary (DRAINAGE/STORM WATER) (PKR) =


DHA QUETTA (SECTOR A-4)
SUMMARY (SEWERAGE SYSTEM)

SR. NO DESCRTIPTION AMOUNT (PKR)

1 SEWERAGE NETWORK
2 DWTS

TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =


DHA QUETTA (SECTOR-A)
ABSTRACT OF QUANTITIES
SEWERAGE SYSTEM
RATE AMOUNT
PAY ITEM DESCRIPTION UNIT QUANTITY
(PKR) (PKR)
Excavation as in Hard Soil upto 1.5m depth, in
foundation and pipe trenches upto 1.5 m wide in
shafts, wells and independent holes upto 30 Sqm
MES:'01-02 each and throw earth clear of edges of excavation CM 31,800.00
within 10 m. Timbering to be paid extra (Trench
over 1.5 m width will be treated as areas).

Bottoming/ sub base of any thickness as specified


using Granular Sub Base Material laid and
MES:'02-15 compacted to 100% modified AASHTO density by CM 27,030.00
appropriate compacting equipment and roller.

RCC PIPE
Supply and fix reinforced cement concrete
MES 21-05 pipes230mm bore, laid and jointed with spigot Meter 15,603.00
socket or collars, as specified.
Supply and fix reinforced cement concrete pipes
300mm bore, laid and jointed with spigot socket
MES 21-07 Meter 2,175.00
or tongue and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement concrete pipes
375mm bore, laid and jointed with spigot socket
MES 21-08 Meter 959.00
or tongue and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement concrete pipes
450mm bore, laid and jointed with spigot socket
MES 21-09 Meter 419.00
or tongue and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement concrete pipes
525mm bore, laid and jointed with spigot socket
MES 21-10 Meter 297.00
or tongue and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement concrete pipes
600mm bore, laid and jointed with spigot socket
MES 21-11 Meter 479.00
or tongue and groove joint incl rubber ring, as
specified.
CONCRETE MANHOLE
Manhole complete rectangular or circular as
MES: 21-31 described, exceeding 600mm but not exceeding
Prorata 1800mm deep with iron steps (in angles 380mm Cum 1,366.41
(200mm wall) centers),230 mm thick poured concerte walls.
DHA QUETTA (SECTOR-A)
ABSTRACT OF QUANTITIES
SEWERAGE SYSTEM
RATE AMOUNT
PAY ITEM DESCRIPTION UNIT QUANTITY
(PKR) (PKR)
MANHOLE COVER
Providing and laying RCC type B manhole cover
(precast complete with angle iron frame
MES: 21-35 Each 832.00
embedded in concrete all as per information
sheet No. Svcs-341 dated 10-11-99.
HOUSE CHAMBER
Manholes complete rectangular or circular as
described n.exceeding 600mm deep form
MES: 21-28 Each 199.00
inverted to surface of cover, including main
channel set in CM 1:1, 150 mm thick RCC walls.
Total Amount Carried to Summary (Sewerage System) (PKR) =
ENGINEER ESTIMATE FOR DHA QUETTA
DIRTY WATER TREATMENT SYSTEM
MAIN SUMMARY
S. NO. DESCRIPTION AMOUNT (PKR)
1 ANAEROBIC BAFFLED REACTOR

2 ANAEROBIC FILTERS

3 EFFLUENT TANK

4 SETTLER TANK

5 CHAMBER
TOTAL AMOUNTCARRIED TO SUMMARY (SEWERAGE
SYSTEM) =
ENGINEER ESTIMATE FOR DHA QUETTA
EFFLUENT TANK
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount
No.
1 Clearing and Grubbing
Clearing of site including cutting of Tree Shrubs
1.1 and obstruction according to satisfaction of
engineer. Sqm 260.22
2 EXCAVATION
Excavation as in Ordinary Soil upto 1.5m depth,
in foundation and pipe trenches upto 1.5 m wide
in shafts, wells and independent holes upto 30
Sqm each and throw earth clear of edges of
2.1
excavation within 10 m. Timbering to be paid
extra (Trench over 1.5 m width will be treated as
areas).
Cum 891.49
2.2 Back Fill
Earth filling as in Ordinary or hard soil ,filling in
foundation , pipe trenches, shafs, wells,
independent holes, under floors or around plinth
etc, 1.5 M below or above Ground Level (GL),
with spoil obtained from excavation in
trenches/over areas within 10m including
watering and compaction in 150mm layer and
dressing to required profile and shape.
Cum 304.53
Compaction of Natural ground upto 95%
2.3
modified ASHTO density all as spd. Sqm 158.98
3 CONCRETE -
Providing, mixing, depositing, curing and
compacting cement concrete using ordinary
cement 1:4:8 in foundation etc, as shown on the
drawing with clean local sand and using crush
3.1
stone graded as spd including formwork where
required etc, complete in all respect and as
directed by Engineer lncharge.
Cum 15.98
ENGINEER ESTIMATE FOR DHA QUETTA
EFFLUENT TANK
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount
No.
Providing, mixing, depositing, vibrating and
curing, reinforced cement concrete using
crushed stone and clean sand, conform to
ASTM with minimum cylindrical strength of
3000 psi at 28 days with RCC Type- '8' as under
including water tight shuttering fixing and
removing etc, but excluding the cost of
3.2
reinforcing steel including the cost of extra
labour for fixing of pipes, opening and making of
drip course mould etc, complete in all respects
at any floor and any height, as per
specifications, drawings and all to the approval
of the Engineer lncharge.
-
a. Footings and raft foundation using ordinary
cement as in RCC Type 'B' concrete not
leaner than 3000 PSI. Cum 59.61
b. Beams, lintels, Slab & stair etc using ord
3.3 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI and ratio (1·2:4):- -
I. up to 12 Mtr height from G.L. upto 3rd Floor
Cum 21.25
3.4 a. Walls & Column :- -
I. up to 12 Mtr above from G.L (including GL
to footing). Cum 58.89
STEEL REINFORCEMENT -
a. Supplying, cutting, bending, binding and
fixing in position Deformed bar steel
conforming to ASTM A-615 and made of
best quality billets and having minimum yield
strength of 60,000 PSI including cost of binding
wire of 14SWG including wastage, spd/
3.5 unspd laps, steel chairs rolling margin etc, at
any floor and any height complete in all
respects as per drawings and all to the
approval of the Engineer lncharge any floor
and any height over laps and chairs not to be
paid (incl steelchairs).
Kg 15,600.00
ENGINEER ESTIMATE FOR DHA QUETTA
EFFLUENT TANK
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount
No.
4 PLASTER WORK
Providing and applying cement sand plaster 13
mm thick internal and external surfaces of walls
ceiling at any floor and any height to all surfaces
and planes both normal and oblique inclusive of
corners, splays in jamb, curves, recesses,
grooves, moulding, scaffoldings, labour, curing,
cleaning, bomding, etc,complete in all respects
as per drawings, specifications, and as directed
by the Engineer Incharge.
-
a. 13mm thick cement plaster (1:6) internal
4.1
walls etc. and add Pudlo Plaster. Sqm 297.40
b. 13mm thick cement plaster (1:4) on ceilings
4.2 surfaces and external walls.etc where
mention Sqm 257.55
5 Grill / Ladder -
Supply and fix hold fast, guard bars, Straps for
wooden trusses, holding down bolts with
washers, ladders, railings, brackets, pipe
supports, tie rods and balusters, chimny bars,
5.1 chains, rings shackles, hinges and type, grating
or gullies, etc. including forging, letting in to
stone or brick work etc: complete, by welding in
lieu of riveting/bolting etc.
Kg 40.00
6 MISCELLANEOUS
---do--- but 50mm dia UPVC for sleeves of GF
6.1 as per drawings.
Mtr 4.00
Supply and fixing cast iron manhole cover for
overhead water tank 600mm with frame
6.2 exceeding 7.5Kg but not exceeding 10 Kg/Each
set in Cm and handing in concrete as spd.
Each 4.00
Providing and fixing of PVC water stopper 190
6.3 Mtr 65.83
mm wide
TOTAL AMOUNT CARRIED TO SUMMARY DWTS (PKR) =
ENGINEER ESTIMATE FOR DHA QUETTA
ANAEROBIC BAFFLED REACTOR
CIVIL WORKS

S. NO. Description Unit Quantity Rate Amount


1 Clearing and Grubbing
Clearing of site including cutting of Tree Shrubs
1.1 and obstruction according to satisfaction of
engineer. Sqm 185.87
2 EXCAVATION
Excavation as in Ordinary Soil upto 1.5m depth,
in foundation and pipe trenches upto 1.5 m wide
in shafts, wells and independent holes upto 30
Sqm each and throw earth clear of edges of
2.1
excavation within 10 m. Timbering to be paid
extra (Trench over 1.5 m width will be treated as
areas).
Cum 2,815.73
2.2 Back Fill
Earth filling as in Ordinary or hard soil ,filling in
foundation , pipe trenches, shafs, wells,
independent holes, under floors or around plinth
etc, 1.5 M below or above Ground Level (GL),
with spoil obtained from excavation in
trenches/over areas within 10m including
watering and compaction in 150mm layer and
dressing to required profile and shape.
Cum 889.87
Compaction of Natural ground upto 95%
2.3
modified ASHTO density all as spd. Sqm 627.91
3 CONCRETE
Providing, mixing, depositing, curing and
compacting cement concrete using ordinary
cement 1:4:8 in foundation etc, as shown on the
drawing with clean local sand and using crush
3.1
stone graded as spd including formwork where
required etc, complete in all respect and as
directed by Engineer lncharge.
Cum 63.13
ENGINEER ESTIMATE FOR DHA QUETTA
ANAEROBIC BAFFLED REACTOR
CIVIL WORKS

S. NO. Description Unit Quantity Rate Amount


Providing, mixing, depositing, vibrating and
curing, reinforced cement concrete using
crushed stone and clean sand, conform to
ASTM with minimum cylindrical strength of
3000 psi at 28 days with RCC Type- '8' as under
including water tight shuttering fixing and
removing etc, but excluding the cost of
3.2
reinforcing steel including the cost of extra
labour for fixing of pipes, opening and making of
drip course mould etc, complete in all respects
at any floor and any height, as per
specifications, drawings and all to the approval
of the Engineer lncharge.
-
a. Footings and raft foundation using ordinary
3.3 cement as in RCC Type 'B' concrete not
leaner than 3000 PSI. Cum 297.69
b. Beams, lintels, Slab & stair etc using ord
3.4 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI and ratio (1·2:4):- -
I. up to 12 Mtr height from G.L. upto 3rd Floor
Cum 86.98
a. Walls & Column :- -
I. up to 12 Mtr above from G.L (including GL
3.5
to footing). Cum 185.20
STEEL REINFORCEMENT -
a. Supplying, cutting, bending, binding and
fixing in position Deformed bar steel
conforming to ASTM A-615 and made of
best quality billets and having minimum yield
strength of 60,000 PSI including cost of binding
wire of 14SWG including wastage, spd/
3.6 unspd laps, steel chairs rolling margin etc, at
any floor and any height complete in all
respects as per drawings and all to the
approval of the Engineer lncharge any floor
and any height over laps and chairs not to be
paid (incl steelchairs).
Kg 55,000.00
ENGINEER ESTIMATE FOR DHA QUETTA
ANAEROBIC BAFFLED REACTOR
CIVIL WORKS

S. NO. Description Unit Quantity Rate Amount


4 PLASTER WORK -
Providing and applying cement sand plaster 13
mm thick internal and external surfaces of walls
ceiling at any floor and any height to all surfaces
and planes both normal and oblique inclusive of
corners, splays in jamb, curves, recesses,
grooves, moulding, scaffoldings, labour, curing,
cleaning, bomding, etc,complete in all respects
as per drawings, specifications, and as directed
by the Engineer Incharge.
-
a. 13mm thick cement plaster (1:6) internal
4.1
walls etc. and add Pudlo Plaster. Sqm 2,193.68
b. 13mm thick cement plaster (1:4) on ceilings
4.2 surfaces and external walls.etc where
mention Sqm 478.81
5 Grill / Ladder -
Supply and fix hold fast, guard bars, Straps for
wooden trusses, holding down bolts with
washers, ladders, railings, brackets, pipe
supports, tie rods and balusters, chimny bars,
5.1 chains, rings shackles, hinges and type, grating
or gullies, etc. including forging, letting in to
stone or brick work etc: complete, by welding in
lieu of riveting/bolting etc.
Kg 320.00
6 MISCELLANEOUS -
---do--- but 50mm dia UPVC for sleeves of GF
6.1 as per drawings.
Mtr 4.00
Supply and fixing cast iron manhole cover for
overhead water tank 600mm with frame
6.2 exceeding 7.5Kg but not exceeding 10 Kg/Each
set in Cm and handing in concrete as spd.
Each 84.00
Providing and fixing of PVC water stopper 190
6.3 Mtr 429.14
mm wide
TOTAL AMOUNT CARRIED TO SUMMARY DWTS (PKR) =
ENGINEER ESTIMATE FOR DHA QUETTA
ANAEROBIC FILTERS
CIVIL WORKS
AMOUNT
S. NO. DESCRIPTION UNIT QUANTITY RATE
(PKR)
1 Clearing and Grubbing
Clearing of site including cutting of Tree Shrubs
1.1 and obstruction according to satisfaction of
engineer. Sqm 334.57
2 EXCAVATION
Excavation as in Ordinary Soil upto 1.5m depth,
in foundation and pipe trenches upto 1.5 m wide
in shafts, wells and independent holes upto 30
Sqm each and throw earth clear of edges of
2.1
excavation within 10 m. Timbering to be paid
extra (Trench over 1.5 m width will be treated as
areas).
Cum 3,890.58
2.2 Back Fill
Earth filling as in Ordinary or hard soil ,filling in
foundation , pipe trenches, shafs, wells,
independent holes, under floors or around plinth
etc, 1.5 M below or above Ground Level (GL),
with spoil obtained from excavation in
trenches/over areas within 10m including
watering and compaction in 150mm layer and
dressing to required profile and shape.
Cum 943.93
Compaction of Natural ground upto 95%
2.3
modified ASHTO density all as spd. Sqm 850.97
3 CONCRETE
Providing, mixing, depositing, curing and
compacting cement concrete using ordinary
cement 1:4:8 in foundation etc, as shown on the
drawing with clean local sand and using crush
3.1
stone graded as spd including formwork where
required etc, complete in all respect and as
directed by Engineer lncharge.
Cum 85.55
ENGINEER ESTIMATE FOR DHA QUETTA
ANAEROBIC FILTERS
CIVIL WORKS
AMOUNT
S. NO. DESCRIPTION UNIT QUANTITY RATE
(PKR)
Providing, mixing, depositing, vibrating and
curing, reinforced cement concrete using
crushed stone and clean sand, conform to
ASTM with minimum cylindrical strength of
3000 psi at 28 days with RCC Type- '8' as under
including water tight shuttering fixing and
removing etc, but excluding the cost of
3.2
reinforcing steel including the cost of extra
labour for fixing of pipes, opening and making of
drip course mould etc, complete in all respects
at any floor and any height, as per
specifications, drawings and all to the approval
of the Engineer lncharge.

a. Footings and raft foundation using ordinary


cement as in RCC Type 'B' concrete not
leaner than 3000 PSI. Cum 399.93
b. Beams, lintels, Slab & stair etc using ord
3.3 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI and ratio (1·2:4):-
I. up to 12 Mtr height from G.L. upto 3rd Floor
Cum 122.54
3.4 a. Walls & Column :- -
I. up to 12 Mtr above from G.L (including GL
to footing). Cum 280.38
ENGINEER ESTIMATE FOR DHA QUETTA
ANAEROBIC FILTERS
CIVIL WORKS
AMOUNT
S. NO. DESCRIPTION UNIT QUANTITY RATE
(PKR)
STEEL REINFORCEMENT
a. Supplying, cutting, bending, binding and
fixing in position Deformed bar steel
conforming to ASTM A-615 and made of
best quality billets and having minimum yield
strength of 60,000 PSI including cost of binding
wire of 14SWG including wastage, spd/
3.5 unspd laps, steel chairs rolling margin etc, at
any floor and any height complete in all
respects as per drawings and all to the
approval of the Engineer lncharge any floor
and any height over laps and chairs not to be
paid (incl steelchairs).
Kg 78,000.00
4 Brick Work (Ground Floor)
Burnt brick work in wall over 115 mm thick laid
and jointed in cement mortar 1:6 straight or to
4.1
curve with inner radius of 6 m and over upto G.F
roof level. Cum 163.08
5 PLASTER WORK
Providing and applying cement sand plaster 13
mm thick internal and external surfaces of walls
ceiling at any floor and any height to all surfaces
and planes both normal and oblique inclusive of
corners, splays in jamb, curves, recesses,
grooves, moulding, scaffoldings, labour, curing,
cleaning, bomding, etc,complete in all respects
as per drawings, specifications, and as directed
by the Engineer Incharge.

a. 13mm thick cement plaster (1:6) internal


5.1
walls etc. and add Pudlo Plaster. Sqm 2,427.88
b. 13mm thick cement plaster (1:4) on ceilings
5.2 surfaces and external walls.etc where
mention Sqm 608.92
ENGINEER ESTIMATE FOR DHA QUETTA
ANAEROBIC FILTERS
CIVIL WORKS
AMOUNT
S. NO. DESCRIPTION UNIT QUANTITY RATE
(PKR)
6 Grill / Ladder
Supply and fix hold fast, guard bars, Straps for
wooden trusses, holding down bolts with
washers, ladders, railings, brackets, pipe
supports, tie rods and balusters, chimny bars,
6.1 chains, rings shackles, hinges and type, grating
or gullies, etc. including forging, letting in to
stone or brick work etc: complete, by welding in
lieu of riveting/bolting etc.
Kg 80.00
7 MISCELLANEOUS
---do--- but 50mm dia UPVC for sleeves of GF
7.1 as per drawings.
Mtr 4.00
Providing and fixing of PVC water stopper 190
7.2
mm wide Mtr 458.40
Providing & laying PVC Pipe 15 mm dia fill in
7.3 tank 3 feet according to Drawing complete in all
respect. Mtr 84,570.00
TOTAL AMOUNT CARRIED TO SUMMARY DWTS (PKR) =
ENGINEER ESTIMATE FOR DHA QUETTA
SETTLER
CIVIL WORKS
S.
DESCRIPTION UNIT QUANTITY RATE AMOUNT (PKR)
NO.
1 Clearing and Grubbing
Clearing of site including cutting of Tree Shrubs
1.1 and obstruction according to satisfaction of
engineer. Sqm 511.15
2 EXCAVATION
Excavation as in Ordinary Soil upto 1.5m depth,
in foundation and pipe trenches upto 1.5 m wide
in shafts, wells and independent holes upto 30
Sqm each and throw earth clear of edges of
2.1
excavation within 10 m. Timbering to be paid
extra (Trench over 1.5 m width will be treated as
areas).
Cum 1,802.74
2.2 Back Fill
Earth filling as in Ordinary or hard soil ,filling in
foundation , pipe trenches, shafs, wells,
independent holes, under floors or around plinth
etc, 1.5 M below or above Ground Level (GL),
with spoil obtained from excavation in
trenches/over areas within 10m including
watering and compaction in 150mm layer and
dressing to required profile and shape.
Cum 528.66
Compaction of Natural ground upto 95%
2.3
modified ASHTO density all as spd. Sqm 735.26
3 CONCRETE
Providing, mixing, depositing, curing and
compacting cement concrete using ordinary
cement 1:4:8 in foundation etc, as shown on the
drawing with clean local sand and using crush
3.1
stone graded as spd including formwork where
required etc, complete in all respect and as
directed by Engineer lncharge.
Cum 46.64
ENGINEER ESTIMATE FOR DHA QUETTA
SETTLER
CIVIL WORKS
S.
DESCRIPTION UNIT QUANTITY RATE AMOUNT (PKR)
NO.
Providing, mixing, depositing, vibrating and
curing, reinforced cement concrete using
crushed stone and clean sand, conform to
ASTM with minimum cylindrical strength of
3000 psi at 28 days with RCC Type- '8' as under
including water tight shuttering fixing and
removing etc, but excluding the cost of
3.2 reinforcing steel including the cost of extra
labour for fixing of pipes, opening and making of
drip course mould etc, complete in all respects
at any floor and any height, as per
specifications, drawings and all to the approval
of the Engineer lncharge.

a. Footings and raft foundation using ordinary


cement as in RCC Type 'B' concrete not
leaner than 3000 PSI. Cum 190.03
b. Beams, lintels, Slab & stair etc using ord
3.4 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI and ratio (1·2:4):-
I. up to 12 Mtr height from G.L. upto 3rd Floor
Cum 70.67
a. Walls & Column :-
I. up to 12 Mtr above from G.L (including GL
to footing). Cum 137.18
STEEL REINFORCEMENT
a. Supplying, cutting, bending, binding and
fixing in position Deformed bar steel
conforming to ASTM A-615 and made of
best quality billets and having minimum yield
strength of 60,000 PSI including cost of binding
wire of 14SWG including wastage, spd/
3.5 unspd laps, steel chairs rolling margin etc, at
any floor and any height complete in all
respects as per drawings and all to the
approval of the Engineer lncharge any floor
and any height over laps and chairs not to be
paid (incl steelchairs).
Kg 39,000.00
ENGINEER ESTIMATE FOR DHA QUETTA
SETTLER
CIVIL WORKS
S.
DESCRIPTION UNIT QUANTITY RATE AMOUNT (PKR)
NO.
4 PLASTER WORK
Providing and applying cement sand plaster 13
mm thick internal and external surfaces of walls
ceiling at any floor and any height to all surfaces
and planes both normal and oblique inclusive of
corners, splays in jamb, curves, recesses,
grooves, moulding, scaffoldings, labour, curing,
cleaning, bomding, etc,complete in all respects
as per drawings, specifications, and as directed
by the Engineer Incharge.

a. 13mm thick cement plaster (1:6) internal


4.1
walls etc. and add Pudlo Plaster. Sqm 1,051.67
b. 13mm thick cement plaster (1:4) on ceilings
4.2 surfaces and external walls.etc where
mention Sqm 392.72
5 Grill / Ladder
Supply and fix hold fast, guard bars, Straps for
wooden trusses, holding down bolts with
washers, ladders, railings, brackets, pipe
supports, tie rods and balusters, chimny bars,
5.1 chains, rings shackles, hinges and type, grating
or gullies, etc. including forging, letting in to
stone or brick work etc: complete, by welding in
lieu of riveting/bolting etc.
Kg 120.00
6 MISCELLANEOUS
---do--- but 50mm dia UPVC for sleeves of GF
6.1 as per drawings.
Mtr 4.00
Supply and fixing cast iron manhole cover for
overhead water tank 600mm with frame
6.2 exceeding 7.5Kg but not exceeding 10 Kg/Each
set in Cm and handing in concrete as spd.
Each 18.00
Providing and fixing of PVC water stopper 190
6.3 Mtr 202.97
mm wide
TOTAL AMOUNT CARRIED TO SUMMARY DWTS (PKR) =
ENGINEER ESTIMATE FOR DHA QUETTA
CHAMBER
CIVIL WORKS

S. NO. DESCRIPTION UNIT QUANTITY RATE AMOUNT (PKR)


1 Clearing and Grubbing
Clearing of site including cutting of Tree Shrubs
1.1 and obstruction according to satisfaction of
engineer. Sqm 511.15
2 EXCAVATION
Excavation as in Ordinary Soil upto 1.5m depth,
in foundation and pipe trenches upto 1.5 m wide
in shafts, wells and independent holes upto 30
Sqm each and throw earth clear of edges of
2.1
excavation within 10 m. Timbering to be paid
extra (Trench over 1.5 m width will be treated as
areas).
Cum 128.73
2.2 Back Fill
Earth filling as in Ordinary or hard soil ,filling in
foundation , pipe trenches, shafs, wells,
independent holes, under floors or around plinth
etc, 1.5 M below or above Ground Level (GL),
with spoil obtained from excavation in
trenches/over areas within 10m including
watering and compaction in 150mm layer and
dressing to required profile and shape.
Cum 88.80
Compaction of Natural ground upto 95%
2.3
modified ASHTO density all as spd. Sqm 190.49
3 CONCRETE
Providing, mixing, depositing, curing and
compacting cement concrete using ordinary
cement 1:4:8 in foundation etc, as shown on the
drawing with clean local sand and using crush
3.1
stone graded as spd including formwork where
required etc, complete in all respect and as
directed by Engineer lncharge.
Cum 1.69
ENGINEER ESTIMATE FOR DHA QUETTA
CHAMBER
CIVIL WORKS

S. NO. DESCRIPTION UNIT QUANTITY RATE AMOUNT (PKR)


Providing, mixing, depositing, vibrating and
curing, reinforced cement concrete using
crushed stone and clean sand, conform to
ASTM with minimum cylindrical strength of
3000 psi at 28 days with RCC Type- '8' as under
including water tight shuttering fixing and
removing etc, but excluding the cost of
3.2
reinforcing steel including the cost of extra
labour for fixing of pipes, opening and making of
drip course mould etc, complete in all respects
at any floor and any height, as per
specifications, drawings and all to the approval
of the Engineer lncharge.

a. Footings and raft foundation using ordinary


cement as in RCC Type 'B' concrete not
leaner than 3000 PSI. Cum 5.72
b. Beams, lintels, Slab & stair etc using ord
3.4 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI and ratio (1·2:4):-
I. up to 12 Mtr height from G.L. upto 3rd Floor
Cum 1.85
a. Walls & Column :-
I. up to 12 Mtr above from G.L (including GL
to footing). Cum 9.17
STEEL REINFORCEMENT
a. Supplying, cutting, bending, binding and
fixing in position Deformed bar steel
conforming to ASTM A-615 and made of
best quality billets and having minimum yield
strength of 60,000 PSI including cost of binding
wire of 14SWG including wastage, spd/
3.5 unspd laps, steel chairs rolling margin etc, at
any floor and any height complete in all
respects as per drawings and all to the
approval of the Engineer lncharge any floor
and any height over laps and chairs not to be
paid (incl steelchairs).
Kg 2,000.00
ENGINEER ESTIMATE FOR DHA QUETTA
CHAMBER
CIVIL WORKS

S. NO. DESCRIPTION UNIT QUANTITY RATE AMOUNT (PKR)


4 PLASTER WORK
Providing and applying cement sand plaster 13
mm thick internal and external surfaces of walls
ceiling at any floor and any height to all surfaces
and planes both normal and oblique inclusive of
corners, splays in jamb, curves, recesses,
grooves, moulding, scaffoldings, labour, curing,
cleaning, bomding, etc,complete in all respects
as per drawings, specifications, and as directed
by the Engineer Incharge.

a. 13mm thick cement plaster (1:6) internal


4.1
walls etc. and add Pudlo Plaster. Sqm 42.38
b. 13mm thick cement plaster (1:4) on ceilings
4.2 surfaces and external walls.etc where
mention Sqm 59.00
5 Grill / Ladder
Supply and fix hold fast, guard bars, Straps for
wooden trusses, holding down bolts with
washers, ladders, railings, brackets, pipe
supports, tie rods and balusters, chimny bars,
5.1 chains, rings shackles, hinges and type, grating
or gullies, etc. including forging, letting in to
stone or brick work etc: complete, by welding in
lieu of riveting/bolting etc.
Kg 120.00
6 MISCELLANEOUS
---do--- but 50mm dia UPVC for sleeves of GF
6.1
as per drawings. Mtr 4.00
Supply and fixing cast iron manhole cover for
overhead water tank 600mm with frame
6.2 exceeding 7.5Kg but not exceeding 10 Kg/Each
set in Cm and handing in concrete as spd.
Each 2.00
Providing and fixing of PVC water stopper 190
6.3
mm wide Mtr 18.29
7 SUBMERSIBLE PUMP
Providing and Installation of 2 HP Submersible
Pump with all required specifications or as
SP Each 4.00
directed by the Engineer.

Total Amount Carried to Summary (DWTS) (PKR) = -


DHA QUETTA (SECTOR A-4)
SUMMARY WATER SUPPLY SYSTEM

S. NO DESCRTIPTION AMOUNT (PKR)

1 WATER SUPPLY SYSTEM


2 OVER HEAD TANK
3 UNDER GROUND TANK
4 TUBE WELLS
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =
ABSTRACT OF QUANTITIES
WATER SUPPLY SYSTEM
AMOUNT
PAY ITEM DESCRIPTION UNIT QUANTITY RATE
(PKR)
Excavation as in Hard Soil upto
1.5m depth, in foundation and
pipe trenches upto 1.5 m wide in
shafts, wells and independent
MES:'01-02 holes upto 30 Sqm each and CM 15,111.80
throw earth clear of edges of
excavation within 10 m.
Timbering to be paid extra
(Trench over 1.5 m width will be
treated as areas).
Bottoming/ sub base of any
thickness as specified using
Granular Sub Base Material
MES:'02-15 laid and compacted to 100% CM 8,373.48
modified AASHTO density by
appropriate compacting
equipment and roller.
PROVIDING OF SAND
CUSHION IN LAYERS AS
SPECIFIED, UNDER
MES: '02-91 CM 6,122.26
CONCRETE ROADS, HARD
STANDINGS, LANDING
GROUND ETC.
Providing and laying of cement
concrete 1:4:8 using crushed or
MES:03-08 CM 34.45
broken stone graded as
specified
Providing and laying reinforced
cement concrete Type B using
shingle or gravel in columns,
MES'3-22 beams, stairs, posts, struts, CM 339.01
piers, lintols, and the like
requiring shuttering, as specified.
Reinforcement measured and
paid separately
Supply and fix bars round, using
deformed bars grade - 40
MES :09-54 including cutting, bending, KG 32.21
binding and placing
reinforcement in position.
One coat of water proofing
MES'10- compound using bitumen 10-20
applied hot at 14.68 kg per 10 SM 845.12
102
sqm.
ABSTRACT OF QUANTITIES
WATER SUPPLY SYSTEM
AMOUNT
PAY ITEM DESCRIPTION UNIT QUANTITY RATE
(PKR)
RCC PIPE
Supply and fix high density
polyethlene (hdpe) pipe 66 mm
SP-1 METE 7,947.00
dia, class pn-10 complete in all
R
respect
Supply and fix high density
polyethlene (hdpe) pipe 96.8 mm
SP-2 METE 5,684.00
dia, class pn-10 complete in all
R
respect
Supply and fix high density
polyethlene (hdpe) pipe 141 mm
SP-3 METE 5,297.00
dia, class pn-10 complete in all
R
respect
Supply and fix high density
polyethlene (hdpe) pipe 176.2
SP-4 METE 201.00
mm dia, class pn-10 complete in
R
all respect
Providiing & laying of gate vale
SP-8 NO 84.00
complete in all respect
Providiing & laying of air relief
SP-9 NO 1.00
vale complete in all respect
Providiing & laying of wash out
SP-10 NO 1.00
valve complete in all respect
Post marker gi pipe 100 mm dia
SP-12 NO 63.00
one meter
Brass connection with clamps
SP -13 and gi pipe with elbow fitting EACH 1,104.00
complete
MANHOLE COVER
Providing and laying rcc type b
manhole cover (precast complete
with angle iron frame embedded
MES: 21-35 EACH 86.00
in concrete all as per information
sheet no. svcs-341 dated 10-11-
99.
CEMENT PLASTERING
13mm thick cement plaster 1:3
MES: 13-3 SM 601.94
finished as specified.
Total Amount Carried to Summary (Water Supply) (PKR) =
DHA QUETTA (SECTOR A-4)
SUMMARY
OVER HEAD WATER TANK
S. No. DESCRIPTION AMOUNT (PKR)

1 OVER HEAD WATER TANK (100,000 GLN)

TOTAL AMOUNT CARRIED TO SUMMARY (WATER SUPPLY) (PKR) =


DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
OVERHEAD TANKS (2 Nos, 100,000 Each)

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
Excavation
01-6 Excavation in over area as in Ordinary soil
upto 1.5 m depth, in foundation / to obtain
earth for filling under floors/areas etc,or for
Cum 832.00
shafts,wells,exc 30 Sqm each clear of edges
of excavation within 10 M

01-6+
1.5 M to 3.0 M. Cum 832.00
01 - 13
01-6+
3.0 M to 4.5 M. Cum 238.40
2 (01 - 13)
Termite
11-1 Termite Proofing of new buildings incl wood
work therein with approved chemicals. Sqm 974.20

Granular Back Fill


02-07 Roll and compact Granular Soil formation
surface/ embankment upto 150mm layers by
compacting equipment and roller upto 100% Cum 1,678.00
Modified AASHTO density, incl filling in
depression with hard soil.
P.C.C 1:4:8
03-8 Providing and laying of C.C Type' C' using
crushed or broken stone graded as specified. Cum 30.00

R.C.C
03-36 Providing and laying RCC 28 Mpa (4000 psi)
cylinder strength ,as in piers ,foundations
etc,incl lead up to 5 km without the use of
Cum 348.00
shuttring .Reinforcement to be measured and
Paid Separately .

03-34 Providing and laying RCC 28 Mpa (4000 psi)


cylinder strength incl lead up to 5 km , using
weigh batch ,as in roof ,Slabs,walls ,
landings ,plinth beams and bands etc as
specified ,requiring shuttring .Reinforcement
to be measured and Paid Separately .
i) Lift 00' - 40'

Cum 156.00
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
OVERHEAD TANKS (2 Nos, 100,000 Each)

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
03-34
ii) Lift 40' - 50' Cum 34.00
+03-71
03-34
iii) Lift 50' - 60' Cum 34.00
+ 2 * (03-
03-34+
iv) Lift 60' - 70' Cum 70.80
3 * (03-71)
03-34
v) Lift 70' - 80' Cum 149.20
+ 4 * (03-
71)
03-34
+ 5 * (03- vi) Lift 80' - 90' Cum 76.20
71)
03-35 Providing and laying RCC 28 Mpa (4000 psi)
cylinder strength ,as in columns
,beams,stairs,posts ,struts ,piers ,lintels
and the like,incl lead up to 5 km as specified
,requiring shuttring .Reinforcement to be
measured and Paid Separately.
i) Lift 00' - 40'
Cum 11.62
03-35 ii) Lift 40' - 50'
Cum 3.40
+ 03-71
03-35 + iii) Lift 50' - 60'
Cum 2.20
2*(03-71)
10-102 One coat of water proofing compound using
bitumen 10-20 applied hot at 14.68 Kg per 10
Sqm 455.00
Sqm.

13-03 13mm thick cement plaster 1:3 finished as


Sqm 1,507.00
specified.
13-11 19mm thick cement plaster 1:4 finished as
Sqm 1,238.00
specified.
15-121 Wall finish coat of graffiato wall coating
1.5mm to 3.00mm thick (stright and swirl ) in Sqm 1,507.00
any colour .
15-125 Surface preparation by using putty on
plastered wall or ceiling to form smooth base
Sqm 2,745.20
for distemper, plastic emulsion paint all as
specified.
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
OVERHEAD TANKS (2 Nos, 100,000 Each)

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
Sand Cushion
02 91 Providing Sand Cushion in layers as specified
, under concrete roads ,hard standings and
Cum 8.80
landing grounds etc.

12-15 Providing and laying of cement concrete type


B as in floor ,slabs, surface finished smooth
with neat cement and steel trowel, using Cum 4.60
crushed or broken stone.

12-37 Providing and laying 10mm thick Terrazzo


(-) 12-44 floor using marble chips 1:2 with ordinary Sqm 87.60
cement.
Bricks Ballast
12-07 Providing and laying burnt bricks, laid on
edge. in floors, roofs , channels, etc., laid and Sqm 87.60
jointed in sand or mud.
Marble Patti
12-28 Supply and fix 8-10mm thick and 40mm wide
marble patty as dividing strips in floor Meter 287.40

12-38 Providing and laying 10mm thick Terrazzo in


(-) 12-44 dado,skirting using marble chips 1:3 with
ordinary cement ,incl 10 mm thick cement Sqm 795.60
plaster.

18-264 Sluice valve according to BSS-3464, (Table


18-1-5) flanged and drilled to BS table 18-1-
Each 2.00
9, complete with rubber packing 100mm dia,
supply and fixing.
Each 6.00
18-265 150mm dia.
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
OVERHEAD TANKS (2 Nos, 100,000 Each)

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
Manhole Cover
21-35 Providing and laying, R.C.C Type 'B' manhole
cover (precast) complete with angle iron
frame, embedded in concrete, all as per Each 2.00
information sheet # Svcs-341

Water Stopper
3-32 Providing and fixing of PVC water stopper 190
M 199.00
mm wide.
M.S Pipe
18-429 MS pipe,water quality(Medium),100 mm
dia,with all fittings i.e.
sockets,bends,tees,elbows etc where
required,laid complete in trenches, as M 20.00
specified (excl cost of excavation),supply and
fixing.

18-430 ii) 150mm dia. M 182.80


Vent Pipe
Supply and fix 100mm dia bore cast iron soil
20-02 waste and vent (SWV) Pipes as specified. M 8.00

Supply and fix bars round, using deformed


bars Grade-60, including cutting, bending,
09-56 binding and placing reinforcement in position. Kg 180,000
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
OVERHEAD TANKS (2 Nos, 100,000 Each)

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
Supply and fix,holds fast, guard Bars, straps
tor wooden trusses, holding down bolts with
washers, ladders, railing, brackets pipe
supports, tie rods and balusters, chimney
bars, chains, rings shackels, Hinges any type,
09-16 gratings or gullies, etc, incl, froging, letting Kg 1,600.00
into stone or brick work etc. complete by
welding in lieu of riveting bolting etc.

GAUGE
N.S Providing and fixing guage for masurment of
water level in the tank, guage made of 12"
wide M.S sheet 12 guage with painting in
white masurment marks in red along with
masurment arrangment, complete in all Nos. 4.00
respect including pullies, M.S wire, and fixing
arrangements as per instruction of Engineer
Incharge)

N.S M.S Railing


Providing and fixing M.S railing 18 SWG best
quality of approved design and section in
stairs, top rail 1-1/2" dia pipe and vertical
posts 3/4" dia pipe fixed over steps with 3/8"
dia rawal bolts, including cost of two coat of Sqm 119.40
enamal paint over one coat of red
oxide,complete in all respects, as per
drawings, and as per instruction of the
Engineer Incharge.
S/ F of steel door of approved design all as
Sqm 5.20
spd
Supplying of Aluminum sliding window
(Deluxe Model) of Anodized champagne
extruded section upto height of 1524 mm as
specified incl fixing on concrete. Wooden or 6725 18.60
steel frames complete with all necessary
fitting including 5 mm tinted glass.
Total Amount Carried to Summary (OHT) (PKR) =
DHA QUETTA (SECTOR A-4)
SUMMARY
UNDERGROUND WATER TANK
S. NO. DESCRIPTION AMOUNT (PKR)

1 UNDERGROUND WATER TANK (200,000 GLN)

TOTAL AMOUNT CARRIED TO SUMMARY (WATER SUPPLY) (PKR) =


DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
UNDERGROUND TANKS

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
Excavation
01-6 Excavation in over area as in Ordinary soil
upto 1.5 m depth, in foundation / to obtain
earth for filling under floors/areas etc,or for
Cum 1,159
shafts,wells,exc 30 Sqm each clear of edges of
excavation within 10 M

01-6+
1.5 M to 3.0 M. Cum 1,159
01 - 13
01-6+
3.0 M to 4.5 M. Cum 980
2 (01 - 13)
Termite
11-1 Termite Proofing of new buildings incl wood
work therein with approved chemicals. Sqm 1,450

Granular Back Fill


02-07 Roll and compact Granular Soil formation
surface/ embankment upto 150mm layers by
compacting equipment and roller upto 100% Cum 934
Modified AASHTO density, incl filling in
depression with hard soil.
P.C.C 1:4:8
03-8 Providing and laying of C.C Type' C' using
crushed or broken stone graded as specified. Cum 60

R.C.C
03-36 Providing and laying RCC 28 Mpa (4000 psi)
cylinder strength ,as in piers ,foundations
etc,incl lead up to 5 km without the use of
Cum 180
shuttring .Reinforcement to be measured and
Paid Separately .

03-34 Providing and laying RCC 28 Mpa (4000 psi)


cylinder strength incl lead up to 5 km , using
weigh batch ,as in roof ,Slabs,walls ,
landings ,plinth beams and bands etc as
specified ,requiring shuttring .Reinforcement to Cum 192
be measured and Paid Separately .
i) Lift 00' - 40'
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
UNDERGROUND TANKS

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
10-102 One coat of water proofing compound using
bitumen 10-20 applied hot at 14.68 Kg per 10 Sqm 671
Sqm.
13-03 13mm thick cement plaster 1:3 finished as
Sqm 1,222
specified.
13-11 19mm thick cement plaster 1:4 finished as
Sqm 1,227
specified.
Manhole Cover
21-35 Providing and laying, R.C.C Type 'B' manhole
cover (precast) complete with angle iron frame,
embedded in concrete, all as per information Each 4
sheet # Svcs-341

Water Stopper
3-32 Providing and fixing of PVC water stopper 190
M 880
mm wide.
Vent Pipe
Supply and fix 100mm dia bore cast iron soil
20-02 waste and vent (SWV) Pipes as specified. M 8

Supply and fix bars round, using deformed bars


Grade-60, including cutting, bending, binding
09-56 Kg 60,000
and placing reinforcement in position.

GAUGE
Providing and fixing guage for masurment of
water level in the tank, guage made of 12" wide
M.S sheet 12 guage with painting in white
masurment marks in red along with masurment
SP arrangment, complete in all respect including Nos. 4
pullies, M.S wire, and fixing arrangements as
per instruction of Engineer Incharge)

SP BUILDING AREA
Complete area of Building Sft 2,716
Total Amount Carried to Summary (UGT) (PKR) =
DHA QUETTA (SECTOR A-4)
SUMMARY (TUBE WELL)
SR .
DESCRIPTION AMOUNT (PKR)
NO
1 CIVIL WORKS
2 MECHANICAL & PLUMBING WORKS
3 ELECTRIFICATION WORKS

TOTAL AMOUNT OF TUBE WELLS CARRIED TO SUMMARY (WATER


SUPPLY) (PKR) =
DHA QUETTA (SECTOR - A)

ABSTRACT OF QUANTITIES

PAY RATE AMOUNT


DESCRIPTION UNIT QUATITY
ITEM (PKR) (PKR)

CIVIL WORKS
EXCAVATION FOR FOUNDATION
Excavation in foundation of building , bridge and other
structure including dagbelling, dressing and refilling
around structure with excavated earth water and
ramming as directed, lead beyond 8 kilometer and lift
3/ 21 (c) upto 5 feet (1.52 m).
Dressing and levelling of earhtwork to designed section,
etc.
In Ordinary soil
%0 Cft 16,121
GRANULAR FILL
Bottoming/ sub base of any thickness as specified using
Granular Sub Base Material laid and compacted to 100%
Mes/ 02- modified AASHTO density by appropriate compacting
Cft 5,862
15 equipment and roller.

ANTI TERMITE TREATMENT


Providing and spraying anti-termite liquid mixed with water
26/ 42 in the ratio of 1:40 (Rate for each spray) 100 Sft 11,718

P.C.C
Cement concrete plain including compacting, finishing and
curing placing,complete (including screening and washing
6/ 5(i) of stone aggregate):

i) Under Foundation/Raft P.C.C ( 1:4:8 ) 100 cft 967


STEEL REINFORCEMENT
(Deformed Grade 60, ASTM A615)
Fabrication of mild steel reinforcement for cement concret
including cutting bending, laying in position, welding and
fastening, including cost of binding wire and labour
6/ 9 (c), charges for binding of steel reinforcement (also includes
removal of rust from the bars). Deformed bar 60 grade

All Structure Kg 30,100


DHA QUETTA (SECTOR - A)

ABSTRACT OF QUANTITIES

PAY RATE AMOUNT


DESCRIPTION UNIT QUATITY
ITEM (PKR) (PKR)
REINFORCED CEMENT CONCRETE (RAFT)
Providing and laying reinforced cement concrete
(including 1) The rate includes rendering floor
prestressed concrete), using coarse sand and screened
surface smooth, and the plastering graded and washed
aggregate, in required shape and design, done for making
up all surfaces including forms, moulds, Shuttering, lifting,
compacting, after removing centring. curing, endering and
finishing exposed surface, complete (but excluding the
6/ 6-a cost of steel reinforcement, its fabrication 2) Plastering
ii(3), done under soffit of and placing in position, etc.)
(a)(ii) Reinforced cement concrete in slab of rafts / strip
foundation, base slab of column and retaining walls; etc
and other structural members other than those mentioned
in 5(a) (i) above ot requiring form work (i.e. horizental
shuttering) complete in all respects:-

(3) Type C (nominal mix 1: 2: 4)


a) Raft Per Cft 2,234
REINFORCED CEMENT CONCRETE
Providing and laying reinforced cement concrete
(including pre-stressed concrete), using coarse sand and
screened graded and washed aggregate, in required
6/ 6,a(i)1 shape and design, including forms, moulds, shuttering,
lifting, compacting, curing, rendering and finishing
exposed fabrication and placing in position etc).

Reinforced cement concrete in roof slab, beams, columns,


lintels, girders and other structural members laid in situ or
pre cast laid in position or prestressed members cast in
situ complete in all respect. Type-A (Nominal Mix 1:1:2 )

For All Structure Per Cft 8,355


BLOCK MASONRY
Precast cement concrete hollow blocks (1: 2: 4) , including
6/ 11 cost of templates and constructing walls thereof. Cft 7,395
DHA QUETTA (SECTOR - A)

ABSTRACT OF QUANTITIES

PAY RATE AMOUNT


DESCRIPTION UNIT QUATITY
ITEM (PKR) (PKR)
INTERNAL PLASTER C.S.M. (1:5)
Cement plaster 1:5 upto 20' (6.00 m)
b)½" (13 mm) thick
11/ 11(b) Extra for lime, mud or cement plaster and pointing from20'
(6.00 m) and above for each additional 10' (3.00 m)height
or part thereof.

100 Sft 11,120


EXTERNAL WALL PLASTER C.S.M. (1:4)
Cement plaster 1:4 upto 20' (6.00 mm)
b)3/4" (20 mm) thick
11/ 9© Extra for lime, mud or cement plaster and pointing from20'
(6.00 m) and above for each additional 10' (3.00 m)height
or part thereof.

100 Sft 22,225


EMULSION PAINTING
preparing of surface and painting with emulsion paint ,
13/ 31 complete in all respect.
a,b 39, a) New surface 1+ 2 total 3 coat

ceiling & walls 100Sft 13,673


WEATHER SHIELD
Preparing surface and painting with water proof coloured
13/ 32A cement finish, like duracem, buxcem or other finishes with
a ,I, ii, similar specifications, on walls, etc.
39,

a) New surface 1+ 2 total 3 coat 100 Sft 19,201


MS. WINDOW GRILL
P/F MS box section of 16 SWG,having frames of 2”x1-1/2”
leave frame of T- type box section of 2” x 1” x 1 ” ,
with½”x1/2”box section using, Ushaped rubber for fixing
5mm thick glass panesi / cthe cost of fixing of 24 SWG
25/54 wire guaze on inner side by mean sof ½”x1/8” MS flat
patti, MS grill fitted with in the window frame and screws
including hinges ,brass handles and painting 3 coats.
Complete in all respect.

Sft 1,394
DHA QUETTA (SECTOR - A)

ABSTRACT OF QUANTITIES

PAY RATE AMOUNT


DESCRIPTION UNIT QUATITY
ITEM (PKR) (PKR)
P.C.C ( UNDER FLOOR)
Cement concrete plain including compacting, finishing and
6/ 5(f,i ) curing placing,complete (including screening and washing
of stone aggregate):

(1:4:8) 100 cft 998


(1:2:4) 100 cft 514
P.C.C. FOR PLINTH PROTECTION
Cement concrete plain including placing, compacting,
6/ 5(f,i ) finishing and curing complete (including screening and
washing of stone aggregate):

(1:4:8) 100 cft 1,447


(1:2:4) 100 cft 745
ALUMINUM WINDOWS, VENTILATORS ,DOORS
Providing and fixing all types of glazed aluminium
windows of anodized champagne colour partly fixed and
party sliding using deluxe section of approved
manufacturer having Frame of size 100mm x 30mm using
frame at bottom, at top and side leaf leaf frame sections of
60mm x 23mm at top & bottom and size 45mm x 25mm at
center and size 45mm x 25mm at sides, Jali leaf frame
25 /53a size 43mm x 13mm i/c fine quality aluminum jali, 5mm
thick imported tinted glass with rubber gasket using
approved standard latches, wheel, stopper, brush chennel
angle joint and hardware etc. complete in all respect.
(2 mm thick section)

Door ,windows ,ventilator Sft 806


TERRAZO CHIPS
Providing and laying floor of mosaic marble chips 1"(25
mm) thick of approved quality and shade, laid in white
cement and pigment, over ¾"(20 mm) thick bedding of
10/ 23 cement sand mortar 1:2, including finishing and polishing, 100Sft 3,307
complete.
DHA QUETTA (SECTOR - A)

ABSTRACT OF QUANTITIES

PAY RATE AMOUNT


DESCRIPTION UNIT QUATITY
ITEM (PKR) (PKR)
WATER PROOFING (ROOF TREATMENT)
Providing and laying insulation and water proofing to roof
consisting of.
2 coat of with Sika Seal - 105

19 mm cement sand mortor(1:6)


50 m thermopore sheets
75 mm thick Screed(1:2:4) on slabs
1000 gauge sinle layer polythene sheet
25 mm thick terrazo tiles laid with 20mm (1:5) cement
sand mortar nominal thickness pointed flush with cement
sand mortar (1:3) using 1-part of OPC and 3-parts of
clean approved quality sand. Including curing, mortar fillet
2”x2” all around at corner of slab and parapet wall, Sft 5,894
complete in all respect as per drawings and specification,
or as directed by the Engineer Incharge.

CHAKWAL STONE
Providing and laying 3/4" thick (minimum) natural sand
stone fixng with bond around the building , complete in P.Sft 1,285
all respect.

TOTAL AMOUNT CARRIED TO SUMMARY (TUBE WELLS) (PKR)=

MECHANICAL & PLUMBING WORKS


BORING
Providing and installation of Submersible Pump for water
bore Complete in all respect.(bore depth aproximately.
800 ft)
Water bore material and all accesssories with labour
SP charges
Rft. 16,000
SP 30 HP Nos. 16

TOTAL AMOUNT CARRIED TO SUMMARY (TUBE WELLS) (PKR)=


DHA QUETTA (SECTOR - A)

ABSTRACT OF QUANTITIES

PAY RATE AMOUNT


DESCRIPTION UNIT QUATITY
ITEM (PKR) (PKR)

ELECTRIFICATION WORKS

ZE-03 Raceways, Boxes and Installation Details


Supply and laying of 3″ (75mm) Φ UPVC pipe Class "D"
for electric cables from manhole outside the building to
Distribution Box as specified and as per
1 instruction/satisfaction of Engineer in charge Ft 1,600

Supply and laying of 1″ (25mm) Φ PVC pipe for electric


cables from Distribution Box to Switch board, and upto
2 each point as specified and as per instruction/satisfaction Ft 4,800
of Engineer in charge

Supply, installation, testing and commissioning of Light/fan


point wiring with 02 No. of 2.5 mm² single core PVC
insulated (including green/yellow earth conductor of 01
No. of 2.5 mm² single core PVC insulated, stranded
copper conductors (voltage grading 450/750) in already
3 laid PVC conduit pipes (rigid/flexible), concealed in Nos. 32
structure or under floor, complete with all accessories
from distribution board to switch board and as per the
satisfation of the Engineer Incharge.

4 Same as above Sr. No. 3 , but from point to point Nos. 96


DHA QUETTA (SECTOR - A)

ABSTRACT OF QUANTITIES

PAY RATE AMOUNT


DESCRIPTION UNIT QUATITY
ITEM (PKR) (PKR)
Supply, installation, testing and commissioning of 3 Pin 16
Amps., Power Socket, wiring (including circuit wiring) with
02 No. of 4 mm² single core PVC insulated (including
green/yellow earth conductor of 01 No. of 4 mm² single
core PVC insulated, stranded copper conductors (voltage
grading 450/750) in already laid PVC conduit pipes
5 (rigid/flexible), from DB to Power Socket, concealed in Nos. 64
structure or under floor, complete with all accessories and
as per the satisfation of the Engineer Incharge.

ZE-04 Fans
Supply, installation, testing, and commissioning complete
with all hardware, wall brackets, cords and other
1 accessories etc. of:
i. Exhaust Fan 12" dia Nos. 64
ZE-05 Earthing and Bonding
Supply, Installation and connecting of 01 Nos. Earth point
comprising of earth rod (copper claded MS rod) 20 mm
dia. 10 ft. length (for double earthing of DB's body) driven
in ground by means of 8 SWG Hard Drawn Bare Copper
1 Job 32
Conductor. The earthing rod shall be complete with fixing
clamps, necessary hardwares etc as per the satisfaction
of The Engineer.
DHA QUETTA (SECTOR - A)

ABSTRACT OF QUANTITIES

PAY RATE AMOUNT


DESCRIPTION UNIT QUATITY
ITEM (PKR) (PKR)

ZE-07 Switchgear and Distribution Board


Supply, installation, testing and commissioning of wall
mounted DB - TW along with angle iron frame 16 SWG,
sheet steel enclosure having high quality powder coated
paint, color RAL 7032. The panel shall be complete with
incoming and outgoing MCB's, CU busbars
(20A,415V,TPN+E) Amp./volt. meters, indication lights,
construction with IP 54 protection class, door locking
arrangment etc and all other accessories as required for
quality work, incoming from SMDB-04 Near Petrol Pump,
1 Job 32
having
Incoming
20A TP MCCB, 16 KA,
Outgoings (from bottom through cables)
i) 02 x 10 A SP MCB, of 10 kA capacity ii)
01 x 16 A SP MCB, of 10 kA capacity iii)
01 x 20A, 30 mA 4P ,RCBO

ZE-08 Interior Lighting


Supply, installation, testing and commissioning of light
fixtures complete with lamps, starting gears, holders,
including all suspension, mounting and fixing materials,
concrete bases, swivel mounts, brackets, suspension
1 chains and hooks as specified and to the satisfaction of
Engineer.

i. LED Tube Light (1 X 18W Single Rod) Nos. 128

TOTAL AMOUNT CARRIED TO SUMMARY (TUBE WELLS) (PKR)=


DHA QUETTA (SECTOR- A-4)
SUMMARY (UTILITY DUCTS/ SLEAVES)

SR. NO DESCRTIPTION AMOUNT (PKR)

1 UTILITY DUCTS NETWORK

TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =


ABSTRACT OF QUANTITIES
UTILITY DUCT/SLEAVES NET WORK
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
(PKR)
MES:'01-02 Excavation as in Hard Soil upto 1.5m depth,
in foundation and pipe trenches upto 1.5 m
wide in shafts, wells and independent holes
upto 30 Sqm each and throw earth clear of
edges of excavation within 10 m. Timbering CM 729.00
to be paid extra (Trench over 1.5 m width will
be treated as areas).

MES:'02-15
Bottoming/ sub base of any thickness as
specified using Granular Sub Base Material
laid and compacted to 100% modified CM 470.00
AASHTO density by appropriate compacting
equipment and roller.

Providing of sand cushion in layers as


MES: '02-91 specified, under concrete roads, hard CM 213.00
standings, landing ground etc.
RCC PIPE

Supply and fix reinforced cement concrete


MES 21-05 pipes230mm bore, laid and jointed with Meter 3,281.00
spigot socket or collars, as specified.

Total Amount Carried to Summary (UTILITY DUCTS/ SLEAVES) (PKR) =


DHA QUETTA (SECTOR-A-4)
SUMMARY (EXTERNAL ELECTRIFICATION)
S. NO. DESCRIPTION AMOUNT (PKR)
1 ELECTRIFICATION

TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =


DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
(PKR)

ZE-02 Pad Mounted Distribution Transformer

Supply, installation, testing and commissioning


of following Outdoor type Pad Mounted
Distribution Transformers (11 KV/415V)
including Construction of foundations as per
technical specification, drawings and as per
directed by the Engineer.

i 630 KVA Each 140.00


ii 400 KVA Each 156.00
iii 200 KVA Each 56.00
iv 100 KVA Each 16.00
ZE-03 Out Door Pad Mounted Ring Main Unit

1 11KV RMU
Supply, installation, testing and commissioning
of following MV Pad Mounted switches
including Construction of Foundations as per
technical specification, drawings and as per
directed by the Engineer.
i 4 - way RMU Each 39.00
ii 3 - way RMU Each 58.00
ZE-04 HT & LT Cable and Cable Accessories

(a) HT XLPE Cable


Supply, laying, testing and commissioning of
following HT XLPE cables, directly in sand layer
in already excavated trenches or through RCC
Pipes (already installed at road crossings),
including cable binding ties as per
specifications and drawings
i 1-Core 1000MCM 11KV Cable M 361,353.00
ii 3-Core 4/0 AWG 11KV Cable M 24,000.00
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
(PKR)
(b) LT Cable
Supply, laying, testing and commissioning of
following Aluminum LT cable directly in sand
layer in already excavated trenches or through
the RCC pipe (already installed at road
crossings) as per specifications, drawings and
as dire
i LV Cable 4-Core 37/0.083 M 20,000.00

(c ) HT heat Shrinkable Termination Kits


Supply, installation, earthing and
commissioning of following HT heat shrinkable
termination kits of Raychem / 3-M/Cellpack for
cables laid , including cable glands and
miscellaneous materials and supply, installation
as per requirement
i 1-Core 1000MCM 11KV Cable Sets 300.00
ii 3-Core 4/0 AWG 11KV Cable Each 600.00
(d) LT Heat Shrinkable Termination Kits
Supply, installation, testing and commissioning
of LT heat shrinkable termination kits of
Raychem / 3 - M / Cell pack for cables laid
including cable glands, miscellaneous materials
and supply, installation as per requirements,
specification
i 4- core 120mm2 - 150mm2 PVC / PVC Each 500.00
(e ) Cable Markers
Supply at works and, installation of HT & LT
i cable markers as per specifications, drawings, Each 1,800.00
and as directed by the Engineer.
ZE-06 LT Service Boxes / Feeder Pillars
Supply, installation, testing and commissioning
of 06 way LT Distribution Boxes (IP54) (Feeder
i Pillars / Services box) including construction of Each 471.00
foundations as per technical specifications,
drawings and as directed by the Engineer.
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
(PKR)

ZE-07 Earthing System


Earthing Rod for Transformers, Ring Main Units
(a)
& Feeder Pillars/Distribution Box
i Transformers Nos. 736.00
ii 11 KV HT Pad Mounted Switches / RMU Nos. 194.00
(b) iii Feeder Pillars / Distribution Box Nos. 471.00
iv Earthing Wire Kg 7,005.00
v Fixing of Earthing Wire Job 1,401.00
ZE-08 Raceways, Excavation and Backfilling

Excavation and Backfilling of trench in any type


of soil within the project area for laying of HT &
LT cables including sand, protective bricks and
(a)
excavated earth compaction in layers not
exceeding 9" thick site cleaning etc: as per
drawings, specification
i Excavation CM 118,866.00
ii Sand (Bed and Cover) CM 10,972.00
iii Bricks (Protection Cover) 3" thick Nos. 18,067.00
iv Excavated earth backfilling and compaction CM 102,225.00
v Plinth for Transformer Job 368.00
vi Plinth for RMU Job 97.00
vii Plinth for Feeder Pillar / Distribution Box Job 471.00
(b) PIPES
Providing, excavation, laying, jointing and
compaction of uPVC pipes for road crossing as
per requirements, standards, specifications and
as directed by the Engineer.
i 6" dia (uPVC) M 10,000.00
ii 4" dia (uPVC) M 1,000.00
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
(PKR)
(c ) PIPE DUCT

Providing, excavation, laying, jointing of uPVC


Pipe duct for Main HT/LT Feeders as per
requirments standards specificaitons and as
directed by the Engineer.
i 2 Way duct M 200.00
ii 4 Way duct M 1,000.00
iii 6 Way duct M 1,000.00
iv 8 Way duct M 800.00
v 12 Way duct M 800.00

Providing, excavation, & preparation of


(d) vii manholes as per requirments standards Nos. 158.00
specificaitons and as directed by the Engineer.
ZE-09 SOLAR ROAD LIGHTING

Making of RCC foundation size 600 x 600 x


1830 mm as specified with 1:2:4 including 4
Nos. J-Bolts dia 25 mm each 1220 mm long,
complete with 8 Nos. nuts/bolts, including back
filling of excavated material, as shown in
i Nos. 42.00
drawing and complete to the satisfaction of
Engineer. Contractor shall have to provide the
construction drawings of pole foundation for the
approval of Engineer/Consultant as per site
conditions

Making of RCC foundation size 550 x 550 x


1830 mm as specified with 1:2:4 including 4
Nos. J-Bolts dia 25 mm each 1220 mm long,
complete with 8 Nos. nuts/bolts, including back
filling of excavated material, as shown in
ii Nos. 381.00
drawing and complete to the satisfaction of
Engineer. Contractor shall have to provide the
construction drawings of pole foundation for the
approval of Engineer/Consultant as per site
conditions
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
(PKR)

Providing, installation and erecting octagonal


shape hot dip galvanized steel pole 225mm dia
bottom 100mm dia top shell thickness 4.5mm.
12 meter high with Double arm of 2.0 meter
iii each (make Munir, Jamal Poles or equivalent). Nos. 34.00
Complete with base plate arm. Complete with
base plate of 470mmx470mmx25mm.
electrically welded. Pole shall be erected with
4x25mm dia 1220mm long anchor bolts.

Providing, installation and erecting octagonal


shape hot dip galvanized steel pole 225mm dia
bottom 100mm dia top shell thickness 4.5mm.
10 meter high with Double arm of 1.5 meter
iv each (make Munir, Jamal Poles or equivalent). Nos. 8.00
Complete with base plate arm. Complete with
base plate of 470mmx470mmx25mm.
electrically welded. Pole shall be erected with
4x25mm dia 1220mm long anchor bolts.

Providing, installation and erecting octagonal


shape hot dip galvanized steel pole 192mm dia
bottom 62mm dia top shell thickness 4.5mm. 8
meter high with Single arm of 1.0 meter each
vi (make Munir, Jamal Poles or equivalent). Nos. 381.00
Complete with base plate arm. Complete with
base plate of 400mmx400mmx25mm.
electrically welded. Pole shall be erected with
4x25mm dia 1220mm long anchor bolts.

140Wp, 36V, 3.9A Solar Cylinder Panel, with


mono crystalline cells, Tempered glass
material, aluminum alloy frame and efficiency of
vii the solar cells should be greater than 20%, fully Nos. 930.00
weather proof (IP 65).including all accessories
and as per the satisfaction of the engineer
incharge.
DHA QUETTA (SECTOR A-4)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
(PKR)
Solar LED Road lighting of 120W suitable for
the project requirement (make Sunlight,
Unilamp) , fully IP 66 with corrsion resistance
die cost Aluminum Husing, Silicon gas kit,
thermally hardened glass complete with built in
2100WH, 25.6V Li-ion Battery, 24V
Programable MPPT controller, Automatically
viii control through photo cell or with time controller Nos. 84.00
and color rendring index (CRI) should be
greater than 80 . The contractor shall furnish
and install the Complete LED Street Light
Luminaries as describe in tender specification.
The specific wattages of the LED lumanireis are
to be indicated in individual luminaries
specifications.

Solar LED Road lighting of 90W suitable for


the project requirement (make Sunlight,
Unilamp) , fully IP 66 with corrsion resistance
die cost Aluminum Husing, Silicon gas kit,
thermally hardened glass complete with built in
1680WH, 25.6V Li-ion Battery, 24V
Programable MPPT controller, Automatically
ix control through photo cell or with time controller Nos. 381.00
and color rendring index (CRI) should be
greater than 80 . The contractor shall furnish
and install the Complete LED Street Light
Luminaries as describe in tender specification.
The specific wattages of the LED lumanireis are
to be indicated in individual luminaries
specifications.

TOTAL AMOUNT CARRIED TO SUMMARY (EXTERNAL ELECTRIFICATION) (PKR) =