List of information required for overseas

projects
NO. Item
1 project site topography
Project site surrounding
2
environment
3 Geological exploration report

Project Site meteorological


4
conditions

5 Local market price

6 The local customs and practices

7 Power access conditions

8 Site plan

Preliminary design scheme


9
requirements
Relevant legal and regulatory
10
requirements

11 PV area equipment types

Whether need to build new


12
substation
monitoring system and fire-
13
extinguishing system

14 personnel allocation requirements

15 PPA documents

16 land

Electric power company access


17
conditions
18 Building permit
rmation required for overseas
projects
Marks
Site photos or Google map screenshot

Traffic, water and electricity access, buildings, and etc.

Water and soil corrosion level,geological condition

Temperature, sunshine, amount of rain , rain season and winter


duration in last fifty years

Labor, materials, machinery rental prices and others

Religious beliefs, customs and habits, legal holidays and etc.


Transmission line length,whether there are requirements for
equipment types, should we be responsible for the construction
of acsess point,Grid structure, voltage level, access interval
verification
Area, red line drawing,plan view size,elevation and etc.

Whether to take measures for flood control,mounting system


type, solar module specifications and array plan, foundation form
Quality, safety, technology, acceptance, grid connection and
other requirements
Requirement for mounting system type, module type,
transformer, inverter, cables and others
If need, related technical requirements are requied as primary
and secondary system, communication system and others

Whether have technical requirements

working experience,major, vocational qualification and others

signed or not

bought or not,whether has legal policy for development of farmland


and woodland, if has,development permission obtained or not.

have obtained grid connection permission or not

obtained or not