Building Pathology & Inspection Building Pathology & Inspection
Building Pathology & Inspection Building Pathology & Inspection
INSPECTION Unit 2
Property Surveys
2.1 Learning outcomes
2
2.2 Classifications of survey
The main types of survey are classified according to their function as
follows:
3
2.2 Classifications of survey
4
2.2 Classifications of survey
Surveys can be classified by level as the following:
Scheme 1- ‘The Mortgage Valuation’, prepared for the lender not for
the borrower. A brief superficial inspection of the property.
Basic equipment.
Preparing sketches.
Internal measurement.
External measurement.
6
Figure 2.1 Internal measure
7
Figure 2.2 External measure (rear elevation)
8
Figure 2.3 External measure (location or plot survey)
9
2.4 Preparation for condition survey
10
2.4.1 Desk top study
The principal documentation and possible
sources of this information include the following:
Propertydocuments:
Title deeds- containing the principal details of the property, e.g.
boundary locations and measurements. Year of original construction
and any usage restrictions that may be or have been in place. Copies
can be obtained from the local Records Office.
As-built plans and drawings- a copy may be contained within the title
deeds or may be available from architects or
surveyors who have had previous involvement
with the property. If not available then a full and
detailed re-measurement of the property.
11
2.4.1 Desk top study
12
2.4.1 Desk top study
OS & geological maps; the Ordinance Survey (OS) maps provide a
detailed representation of the building’s position and location.
British Geological Society (BGS) and Cola Board additionally
provide information of mineral and coal extraction.
Ordnance Survey
is Great Britain's
national mapping
agency, providing
the most accurate
and up-to-date
geographic data,
relied on by
government,
business and
individuals. Geological maps
13
2.4.1 Desk top study
The principal documentation and possible sources of this information
include the following:
Royal commissions on ancient & historic buildings- detailed
drawings & photographic evidence of buildings and surrounding
ground. Provide guidance on undertaking surveys; maintaining or
conserving older buildings.
Localauthority records- local development statutory notices which
can highlight issues or objections to previous developments.
Ecclesiasticalrecords- older parish churches and older village
properties available data.
14
2.4.2 Health and safety
Inspection and surveys of buildings is potentially risky which include
the following:
Injury to 3rd parties- 3rd parties suffer injury and losses due to actions
or negligence(ineffective or erroneous advice).
15
2.4.2 Health and safety
Prior to visiting site the surveyor must undertake and prepare a risk
assessment and method statement.
18
2.5.1 Issues to be addressed during survey
Illicit alterations: care needs to be taken that any alterations or
modifications to a building have the appropriate planning or building
control approvals and the subsequent construction works have been
undertaken to the correct specification and in a competent manner.
Potential illicit alterations are as follows:
Removal of chimney breast.
Openings in load-bearing walls.
Removal of wall/floor elements.
19
2.5.1 Issues to be addressed during survey
Potential illicit alterations are as follows:
Changes in layout
Loft extensions.
Window replacements.
Rewired electrical system
20
2.5.1 Issues to be addressed during survey
Ground heave: clay subsoil which becomes saturated and expands forcing
upper solid layers.
Flooding: buildings close to rivers, ponds, costal areas and flood plains are
at risk.
Pollution: this can range from effluent or gases from neighboring industrial
processes to noise and disturbance.
21
2.5.1 Issues to be addressed during survey
Wood rotting fungi (brown and white rot):wet & damp conditions
prevailing which require to be removed. Dry rot spread behind
plaster need extensive works to effectively eradicate.
Plant
or tree roots: growing up in building can result in extensive
damage to mortar joints and dislodged roof elements. 22
2.5.1 Issues to be addressed during survey
Other risks:
Electricity power lines- building close
to power lines concern health risks associated
with the electro-magnetic fields. Restriction in
remedial works close to power lines. Co-ordination
with power company to ensure safety when using scaffolding and cranes.
Identify long term and chronic in nature, e.g. dampness and cold, quick
effects, e.g. falls and trips.
The aim of the rating system is to minimize the risks posed to occupiers,
potential occupiers and visitors.
24
2.6.3 The HHSRS Hazards
There are 29 hazards arranged into 4 main groups reflecting the basic health
requirements.
Physiological requirements:
Hydrothermal conditions
1. Damp and mould growth
2. Excess cold
3. Excess heat
Pollutants (non-microbial)
4. Asbestos and manufactured mineral fibre
5. Biocides
6. Carbon monoxide and fuel combustion products
7. Lead
8. Radiation
9. Uncombusted fuel gas
10. Volatile organic compounds 25
2.6.3 The HHSRS Hazards
Psychological requirements:
Space, Security , Lights and Noise
11. Crowding and space
12. Entry by intruders
13. Lighting
14. Noise
26
2.6.3 The HHSRS Hazards
Protection against accidents:
Falls
19. Falls associated with baths etc
20. Falling on level surfaces etc
21. Falling on stairs etc
22. Falling between levels
An HSV is not a detailed survey of every aspect of the property and
focuses only on significant and urgent matters. It’s not suitable for
those properties in need of renovation or in assessing properties for
extension.
28
2.7 HSV
An HSV includes the following information:
The property’s general condition.
Any significant defects, in accessible parts of the property, which may affect
its value.
Urgent and significant matters that need assessing before entering into
exchanging contracts including recommendations for any further specialist
inspections.
Results of testing walls for dampness and timbers for damage including
woodworm or rot.
C: The Building- findings from the internal and external surveys are
highlighted, in particular relating to the condition of the building fabric and
if there are moisture, thermal, or infestation issues.
30
2.71 Format of the HSV
D: The Services and Site- this section includes details of the building
services, specialist inspection and testing is not included it also contains
details relating to the ground boundaries and out buildings.
31
2.8 Home Condition Report
The home information pack consist of :
Home Condition Report.
Energy Rating.
Only qualified Home Inspectors can provide the report and they must
have:
Insurance.
Registered with Government approved Certification Scheme.
32
2.8 Home Condition Report
33
2.8 Home Condition Report
The report’s main objective is to inform potential buyers understand the conditions
of the building and any urgent attention needed. It also highlights issues that need
further investigation to prevent structural damage to the building.
It is based on a rating system of 1,2 or 3 to major parts of the main building that are
inspected.
2.Repairs are required but the Home Inspector does not consider these to be either
serious or urgent.
34
2.8.1 Differences between HSV and HCR
RICS homebuyer survey and valuation (HSV) Home condition report (HCR)
Surveys are optional-<1 in 5 involve an HSV. It will be a statutory requirement for all sellers to have an
HCR prepared.
A valuation is included. No valuation is included,
Survey written as free text. Condition ratings (N, 1,2,3) given for each building element.
Condition is reported in the context of effect on value. Factual, objective statements of condition are reported,
regardless of the effect on value.
Repairs forms part of the advice No advice is given on repairs.
They are carried out by RICS members They are carried out by “licensed home inspectors”
No standardized electronic delivery of reports. Reports are delivered electronically by commercial HCR
registration organizations via secure web connections
Freestyle text is used with some use of caveats and phrases. Reports use “controlled” mandatory and preferred text.
35
2.9 Other Condition Surveys
Types:
36
2.9 Other Condition Surveys
1. During the term of the lease for tenant repair costs reimbursement.
2. During term of the lease to assess the condition of the place to see
whether there is a breach of contract and eviction of the tenant and
recover cost for damages.
3. During the term of the lease, there may be a need to assess
condition on behalf of the tenant.
4. Close to the expiry of the lease, to check whether cost are required
to repair and reinstate the place to its original condition.
38
2.10 Dilapidations
The surveyors must:
Be conversant with the terms of lease.
Act professionally and objectively in undertaking the survey and
preparation of the schedule.
The cost for schedule of repairs should be as accurate as
possible.
39
2.10.1 The Scott Schedule
The use of the Scott schedule allows the parties and any 3rd party
arbiter to quickly assess whether each party agrees with the
inclusion of an element and its subsequent costs. This ensures that
those items with which there is agreement cease to be contentious
and those where there is some level of agreement can be more
readily discussed.
40
2.11 Conclusion