Brief Note on Water Supply and Sewerage System at Pali

Pali is the Head Quarters of Pali District. Pali Town is situated on the bank of the river Bandi
at 250 47’ North latitude and 730 20’ East longitude at a Distance of 300 Kms from Jaipur
and 35 km south east of Jodhpur on the NH- No.14, Jaipur. The town extends to an area of
142.24 square kilometer.

Population:

Year City Projected Population to be Population to be


Population benefited by benefited by Water
Sewerage Supply*
Census 2011 2,30,075
2016 2,49,732 2,27,523 2,99,732
2031 3,18,672 2,81,130 3,68,672
2046 4,02,565 3,46,363 4,52,565
* Including floating population and industrial workers

WATER SUPPLY:

 Source : Jawai Dam


 Existing system: The supply arrangements include a total storage capacity of 20.68
ML, with distribution network of 553 km and 31,546 house service connections.
 Existing rate of supply: 75-80 LPCD and NRW is 37%.
Demand Calculation:

Year 2016 2031 2046

Population 299732 368672 452565

Demand (MLD) 40.46 49.77 61.10

Components Existing & Proposed:

WTP Pumping Station CWSR OHSR

Existin 3 (3.7MLD, 7.4 6 (Mandli HW, Gandhi 6 (Mandli HW, Gandhi 19 nos
g MLD at Mandli HW Nagar HW, PHED Nagar HW, PHED
and 19.4 MLD at campus HW Bherughat, campus HW
PHED campus Jodhpur road, HW Labour Bherughat,Jodhpur road,
Bherughat) colony HW and Naya HW Labour colony HW
gaon HW) and Naya gaon HW
New 1 (30 MLD at 4 (Mandli Raw Water HW, 1 (Manpura Bhakhri HW) 7 nos
Manpura Bhakhri) Mandli HW, Manpura
Bhakhri HW, PHED
Campus HW Bherughat )

Page | 1
 Proposed Water supply distribution system has been divided in 19 zones and 49
DMA’s.

Transmission mains in Km Scope of work Completed


Raw water DI K-9 4.1 3.99
Clear water DI K-9 36.36 34.4
Total 40.46 38.39

Distribution Network in Km Scope of work Completed


HDPE 678.48 538.7
D I K-7 19.42 17.09
Total 697.9 555.8

Benefits after completion of Water Supply Project:

 Equitable distribution of drinking water to the entire population at required terminal


pressure of 12m.
 100 % population covered with metered (Continuous 24 x 7) daily assured water
supply.
 Significant increase in revenue for water supply.
 Upgraded water supply system to meet the water supply requirement for next 30
years.
 Provision of water supply for the uncovered areas.
 Reduction in medical expenses.
 Water supply rate shall be improved to 135 LPCD and Minimizing NRW/unaccounted
water up to 7% through proper metering system.

Page | 2
SEWERAGE SYSTEM:
The whole Pali town has been divided in to 10 Sewerage zones, 8 zones are covered under
UIDSSMT, AMRUT and RUIDP Phase-III.
Remaining 2 zones are sloping away from city area; moreover the area is less developed
with less number of road network. Sewage Collection system with an independent treatment
system can be provided in future, once the area gets fully developed.
Population and sewage generation for various horizon years:
Sewage Generation in MLD @ 113.4
Zonal Population
Zones LPCD
2011 2016 2031 2046 2011 2016 2031 2046
1 38257 40176 46904 55093 4.34 4.56 5.32 6.25
2 22539 25977 38039 52707 2.56 2.95 4.31 5.98
3 9730 12711 23168 35893 1.10 1.44 2.63 4.07
4 90732 94044 105656 119794 10.29 10.66 11.98 13.58
4A 11089 11375 12375 13593 1.26 1.29 1.40 1.54
4B 27682 28642 32007 36102 3.14 3.25 3.63 4.09
5A 5394 5679 6682 7902 0.61 0.64 0.76 0.90
6 6814 8919 16299 25279 0.77 1.01 1.85 2.87
Total 212237 227523 281130 346363 24.07 25.80 31.88 39.28

Sewage Treatment Plants:

 7.5 MLD capacity STP based on ASP process has been constructed under
UIDSSMT scheme.
 15 MLD capacity STP based on SBR process has been constructed under RUIDP
Phase-III.
 Total installed capacity of STP’s at Pali city is 22.50 MLD with a gap of 9.38 MLD for
year 2031. Presently about 10-11 MLD Sewage flow is reaching to STP.

Sewer Network:
About 98.5 Km sewer network is laid under UIDSSMT Scheme.
Under RUIDP Phase-III project 358 Km sewer network is proposed out of which about 292
Km sewer has been laid till date, work is under progress for remaining length of 66 Km.
Household to be benefitted:

Sector No. of House Hold

Water Supply 57,115


UIDSSMT RUIDP Phase-III Non Sewer
Sewerage (Including AMRUT)
10,000 43,783 3332

Benefits after completion of Sewerage Project:

Page | 3
 About 80% of human diseases are water borne and water related due to poor
sanitation.
 The main advantage of waste water system is the prevention of the spread of
disease through communities and the prevention of pollution and maintaining rivers
and water bodies in a healthy and ecologically sound condition.
 Septic tanks will be by-passed, no storage of dirt at houses resulting no foul gases
and healthy environment.
 Road side drains will be dried after house sewer connections, residents get rid form
foul smell and unhygienic conditions.
 The waste water is treated in a controlled manner and the effluent comply with
certain quality criteria.
 Sewerage systems have limited responsibility of households (from own property to
nearest street connection), institutions responsible for the conveyance and treatment
systems.

Reuse of Treated effluent: Pali city faces acute scarcity of water throughout the year, so
optimum utilization of treated effluent from STP’s in an efficient safe manner is must, so that
every drop of water is utilized. In this connection RUIDP created assets for re-use of treated
effluent at STP campus.
Municipal council, Pali is getting revenue by selling of Treated effluent to industries @ 7 Rs.
per KL.
Presently about 2 MLD i.e. 2000 KL treated effluent is distributing to industries and following
will be revenue of Municipal Council, Pali.

Rs. 14,000 per day


Rs. 4 20,000 per month
Rs. 50 40,000 per year
As demand of treated effluent will increase revenue will be increased.
As per PHED Notification dated 05.11.2015 following are the tariff:
Industrial Rate:

Monthly Consumption Rate per 1000 Litres (Rs.)


(a) For consumption upto first 15,000 litres 35
(b) For consumption exceeding 15,000 and upto 40,000 litres 45
(c) For next consumption above 40,000 litres 50

Looking to the above rates, tariff for treated effluent should be atleast half of clear water,
following are the suggested tariff:

Monthly Consumption Rate per 1000 Litres (Rs.)


(a) For consumption upto first 15,000 litres 17.5
(b) For consumption exceeding 15,000 and upto 40,000 litres 22.5
(c) For next consumption above 40,000 litres 25