List of Metro & Railway Projects Executed

Cengrs Geotechnica Pvt. Ltd.


Past Experience: Metro & Railways Projects

Year Name of Project Client

Detailed Geotechnical Investigation for Part of Delhi-Meerut RRTS Corridor Package


National Capital Region
2019 3 & 4 (Km 0.00 to km 16.30) from Sarai Kale Khan, Delhi to end of Ramp of
Transport Corporation Limited
Ghaziabad
Additional Geotechnical investigation due to revision in alignment of IGI to Vasant Delhi Metro Rail Corporation
2019
Kunj Section (Package-1) of Phase-IV Limited

Seismic Refraction Tests for Majlis Park (excluding) to R. K. Ashram Corridor Of Delhi Metro Rail Corporation
2019
Phase-IV of Delhi MRTS Project Limited

Detailed Geotechnical Investigation Work from Km 49.10 to Km 64.10 (Modi Nagar National Capital Region
2018
North to Shatabdi Nagar) of Delhi Meerut Regional Rapid Transit System Corridor Transport Corporation Limited

Detailed Geotechnical Investigation Work from Km 21.75 to Km 30.0 of Delhi-Meerut National Capital Region
2017
Regional Rapid Transit System Corridor (RRTS) Transport Corporation Limited
Geotechnical Investigation for Preparation of DPR for Metro Corridors from ISBT
2017 Dehradun to Nepali Farm, from ISBT Dehradun to Kandholi and from Prem Nagar to Delhi Metro Rail Corporation Ltd.
Ordinance Factory
Geo-Technical-3: Detailed Geotechnical Investigation Work for Tughlakabad –
2017 Terminal 1, IGI Airport corridor & Lajpat Nagar-Saket G Block corridor of Phase - IV of Delhi Metro Rail Corporation Ltd.
Delhi MRTS Project
Geotechnical Investigation for Mumbai Metro Line 3 (Colaba-Bandra_SEEPZ)
2017 Larsen & Toubro Ltd. – SUCG
Project - UG Package-1 (MM2-CBS-UGC-01)

Geotechnical Investigation for Proposed Bridges at your Second Phase of the


2017 Larsen & Toubro Limited
Western Dedicated Freight Corridor [Rewari to Dadri – 128 Km] WDFC CTP-14

Confirmatory Geotechnical Investigations for Western Dedicated Freight Corridor


2017 Larsen & Toubro Limited
Project [Package CTP-3R, Iqbalgarh to Vadodara]
Geotechnical Investigation for Tunnel by Shield TBM & ITO, Delhi Gate & Jama
2015 Masjid Stations between Mandi House & Jama Masjid under Delhi MRTS Project, Metro Tunnelling Delhi
Phase-III (DMRC)
Geotechnical Investigation for Construction of Viaduct and Elevated Stations at
2015 Sector-34, 52, 61, 59, 62 and Electronic City in Noida (CC-94), Line III Extension of YFC Projects Private Limited
Phase-III Delhi MRTS Project

Confirmatory Geotechnical Investigation for Proposed Noida Metro Project at Noida, CEC International Corporation
2015
Uttar Pradesh India Pvt. Ltd.

Geotechnical Investigation for Various Structures along the Section [Vadodara-


2014 Larsen & Toubro Limited
Vaitrana] for Western Dedicated Freight Corridor Project, DFCC(CTP-12 CTP-13)
Delhi Metro Rail Corporation
Geotechnical Investigation for C/o In-situ balance Cantilever over Railway
2014 Limited (Kochi Metro Rail
Crossing near Ernakulam South Railway Station
Project)
Geotechnical Investigation for DMRC Phase-III Project between Mandi House to Delhi Metro Rail Corporation
2014
Jama Masjid (CC-05 Contract) Limited

Confirmatory borehole work at Ashram Chowk and Sarai Kale Khan to Nizamuddin
2014 J. Kumar Infraprojects Ltd.
Station for DMRC Project CC-24
Geotechnical Investigation for Viatarana-Sachin Section (Package 12) of Western
2015 Dedicated Freight Corridor Phase-2- Sections 2 and 3 from Ch. 1.038 kms to Ch. 93 Stup Consultants Private Limited
kms. in Gujarat

Page 1 of 3
List of Metro & Railway Projects Executed
Cengrs Geotechnica Pvt. Ltd.

Year Name of Project Client

Geotechnical Investigation for Near Khooni Darwaza Monument and Delhi Gate Metro Tunnelling Delhi
2014
Monument along the Tunnel Alignment of DMRC Project (CC-05) (L&T SUCG JV)

Geotechnical Investigation for DMRC Corridor Project at Nehru Place Station (UG)-
2014 Pratibha Industries Limited
CC23

Japan International Consultants


2014 Geotechnical Investigation for Mumbai-Ahmedabad HIgh speed Railway Corridor
for Transportation Co.Ltd

Geotechnical Investigation for Near Khooni Darwaza Monument and Delhi Gate Metro Tunnelling Delhi
2014
Monument along the Tunnel Alignment of DMRC Project (CC-05) (L&T SUCG JV)

Geotechnical Investigation for DMRC Corridor Project at Nehru Place Station (UG)-
2014 Pratibha Industries Limited
CC23

Geotechnical Investigation for Eastern DFCC Project (Bhaupur-Khurja Section) Near


2014 Stup Consultants Pvt.Ltd.
Kanpur Uttar Pradesh

Geotechnical Investigation for DMRC Corridor Project Between Kalkaji and Hauz
2013 Pratibha Industries Limited
Khas Stations(UG)-CC-23

Geotechnical Investigation for Airport Metro Express Line (Tunnel) in T-3 Approach Delhi Metro Rail Corporation
2013
Road, Delhi Airport (DMRC)

Geotechnical Investigation for Proposed Structures for Railway Siding of KWPCL near Avantha Power & Infrastructure
2013
Raigarh, Chhittisgarh Limited

Geotechnical Investigation for DMRC Corridor Project Between Shankar Vihar and Larsen & Toubro Ltd.,
2013
Munirka Stations (UG) CC-27 SUCG-JV-CC27

Geotechnical Investigation for Bhaupur-Khurja Section of Eastern Dedicated Freight


2013 STUP Consultants Pvt. Ltd.
Corridor (DFCC)

Geotechnical Investigation for Dedicated Freight Corridor Project (DFCC Western


2013 Larsen & Toubro Ltd.
Corridor CTP-1 & 2 Project) from Rewari, Haryana to Iqbalgarh, Gujarat

Geotechnical Investigation for Dedicated Freight Corridor (Western Freight Corridor


2012 NK Consortium Phase-2
from Dadri-Rewari to Vadodara-JNPT Section), Maharashtra & Gujarat

Geotechnical Investigation for doubling of Bina-Guna (Pkg.1:118.37 kms) and


URS Scott Wilson India Private
2012 Ruthiyai-Kota (Pkg.2: 164.
Limited
206 Kms) Section.

Geotechnical Investigation for Identify Black Cotton Soils Distribution


2012 Between JNPT and Vadodara for Western DFCC Project (Phase-II) [Project NK Consortium Ltd.
Executed in Two Phases under Dry Season& Rainy Season].

Preliminary Geotechnical Investigation for Eastern DFCC Project (Bhaupur- Khurja),


2019 Larsen & Toubro Limited
Uttar Pradesh

Geotechnical Investigation for Proposed Metro Stations at ITO, Delhi Gate & Jama
2012 Larsen & Toubro Limited
Masjid

Pressuremeter Tests along Tunnel from Mandi House to ITO, Delhi Gate & Jama
2012 Larsen & Toubro Limited
Masjid (UG-CC-05)

Page 2 of 3
List of Metro & Railway Projects Executed
Cengrs Geotechnica Pvt. Ltd.

Year Name of Project Client

2012 Geotechnical Investigation for DMRC project at Badarpur-Faridabad Route Lanco Infratech Limited

Geotechnical Investigation for Proposed Elevated DMRC Corridor Project from Moti
2012 Larsen & Toubro Limited
Bagh to Delhi Cantt Via Dhaula Kuan(CC-17)

Geotechnical Investigation for DMRC Corridor Project Between Moti Bagh and Lajpat
2012 FEMC-Pratibha JV
Nagar Stations(UG)-CC18

2012 Geotechnical Investigation for New Faridabad Station for DMRC Project Lanco Infratech Limited

Geotechnical Investigation for Jama Masjid & Kashmere Gate for UG Works under
2012 Era Infra Engineering Limited
Delhi MRTS Project of Ph-III

Geotechnical Investigation for Proposed Sarai Metro Station for DMRC Proejct - CC-
2012 MBL Infrastructures Limited
16

2012 Geotechnical Investigation for DMRC Projct-CC-27 (UG-2) Phase-III Larsen & Toubro Limited

2012 DMRC Project-CC-27 (UG-2) Phase-III L&T - SCUG JV CC27 DELHI

Geotechnical Investigations for Chennai Metro Rail Project Phase-I (Underground


2011 Metro Tunneling Chennai
Package Uaa-04)

Design and Construction of Under-Ground Stations at Shenoy Nagar Anna Nagar Transtonnelstroy - Afcons Joint
2011
East, Anna Nagar Tower Thirumangalam and Associated Tunnels : UAA-05 Venture

Geotechnical Investigation for Tunnel Between Central Secretariat and Mandi House
2011 Pratibha-CRFG JV
for Underground Works Under Delhi MRTS Project (BC-45)

Geotechnical Investigation for Under Ground Tunnel at Delhi (Package CMC1) of


2009 Larsen & Toubro Limited
Delhi Mass Rapid Transport System (MRTS)

Drilling of boreholes for the Installation of Inclinometer/ Extensometer along


2008 monitoring line ML-11 near Sarvapriya Vihar club at 4 No.locations at Hauz Khas Metro Tunneling Group
Station and Malviya Nagar Station

Geotechnical Investigation for Railway Under Bridge Aat Railway Crossing No.7
2008 Tandon Consultants Pvt. Ltd.
Between Shalimar Bagh and Azadpur Fruit Mandi, Delhi

Geotechnical Investigation for Delhi Metro Project (Phase-III)-BC 20 Contract : Metro


2007 Tunnel Alignment between green park and saket including stations Hauz Khas and Metro Tunneling Group
Malviya Nagar

Geotechnical Investigation for Delhi Metro Project (Phase-III)-BC 20 Contract : Metro


2007 Tunnel Alignment to construct viaduct and three elevated Stations at Chhattarpur Simplex Infrastructures Ltd.
Ghitorni and Arjungarh on Qutab Minar Gurgaon Corridor

`2007 Geotechnical Investigation for Marginal Bund Over Ken River at Banda (UP) Irrigation Construction

Geotechnical Investigation for DMRC Mass Rapid Transport System Airport Metro
2007 Larsen & Toubro Limited
Line (AMEL-C5) Project New Delhi

Page 3 of 3
List of Metro & Railway Projects Executed
Cengrs Geotechnica Pvt. Ltd.

Year Name of Project Client

Geotechnical Investigation for Qutab Minar-Gurgaon Corridor of Phase-II of Delhi


2006 Simplex Infrastructures Ltd.
MRTS Project (Contract BC-20)

Geotechnical Investigation for Construction of Railway Bridge Across Yamuna River


2004 Larsen & Toubro Limited
Near Shastri Park, Delhi

Geotechnical Investigation for DMRC Extension of Line No.3 From Barakhamba Road Consulting Engineering Services
2004
to Indraprastha Estate New Delhi (I) Private Limited

Additional Geotechnical Investigation for Delhi Metro Rail Project Under Contract MC-
2002 KSHI JV
1A

1999 Geotechnical Investigation for DMRC - Seelampur Station, New Delhi Delhi Metro Rail Corporation Ltd.

Additional Geotechnical Investigation Along Metro East - West Corridor From ISBT -
1998 RITES Limited
Partap Nagar, Delhi

Page 4 of 3