Professional Documents
Culture Documents
D4 Road Report 10-27-2020
D4 Road Report 10-27-2020
Bridge Activities
Closures
LC Lane Closure CO 19 Grove Summers 16.50 16.76 7:30 AM 4:00 PM Paving
LC Lane Closure CO 23 McElroy Creek Road 6.00 8.00 6:30 AM 3:00 PM Cutting Keys for Paving
LC Lane Closure CO 34 Piggin Run 0.00 1.00 7:30 AM 4:00 PM Ditching
Construction Projects
Resurfacing WV 18 Toms Fork Sugar Camp 5.49 12.44 7a 7p ditching, base failures, paving
Resurfacing WV 23 Ralpsh Run Big Battle 1.94 6.83 7a 7p ditching, base failures, paving
Bridge Activities
Closures
1
DISTRICT 4 DAILY ROAD REPORT
Reporting Date: 10/27/2020
Activity Activity Description Route Route Route Name BMP EMP Start End Detail
Number Type Number Time Time
RC Road Closure CO 8/7 Hardesty Run 0.71 0.71 12:00am Continuous Closed due to slip
LC Lane Closure CO 8 Cunningham Run 2.60 2.60 12:00am Closed undeterminedReplacing Box Culvert
LC Lane Closure US 19 Good Hope 4.03 4.03 12:00am Continuous Road Slipping/Yield Oncoming traffic
Construction Projects
Bridge Widening WV 131 Saltwell Road 3.96 4.00 Continuous Change in Traffic Pattern, Lane shifts
Bridge Replacement WV 20 East/West Pike Street 13.98 13.98 Continuous Change in Traffic Pattern, 1 City block Detour
2
DISTRICT 4 DAILY ROAD REPORT
Reporting Date: 10/27/2020
Activity Activity Description Route Route Route Name BMP EMP Start End Detail
Number Type Number Time Time
262 GradeAll CO 1/5 Starkey Run 0.00 1.44 7:00 AM 3:30 PM
809 Training Training Acad: EndLoader Training 9:00 AM - Fairmont Shop
Bridge Activities
Closures
CO 250/32 Pine Grove in Barrackville 0.50 0.50 Slip- Rd. Closed until heavy maintenance repairs
LC CO 21 Finches/Monumental Road 3.75 3.75 7:00am 3:00pm Lane Closure during working hours
Construction Projects
Resurfacing I 79 East Park Ave to East Fairmont 136.68 138.77 7P 6a milling, paving, shoulder stone, rmp, guardrail
Closures
Road Closure CO 81/2 Upper Cobun Creek 0.00 0.70 continuous MUB building reservior
Construction Projects
Resurfacing CO 857 Cheat Rd 10.44 11.22 7a 7p milling, ditching, culverts, inlets, paving
3
DISTRICT 4 DAILY ROAD REPORT
Reporting Date: 10/27/2020
Activity Activity Description Route Route Route Name BMP EMP Start End Detail
Number Type Number Time Time
Bridge Activities
364 Sign Installation/Maintenance CO 14 Rockville Truss/Mt. Nebo Rd. 1.59 1.59 6:30 AM 5:00 PM Close Bridge
286 Install and Maint of Non-Bridge Structures US 50 East Aurora 26.49 26.49 6:30 AM 5:00 PM Headwall wingwall
Heavy Maintenance Activities
406 Unclassified excavation US 50 George Washington Highway 19.65 19.65 6:30am 3:00pm Work with GSI on slip repair
813 Flagging US 50 George Washington Highway 19.65 19.65 6:30am 3:00pm Traffic control
Closures
bridge closure CO 14 Rockville Truss/Mt. Nebo Rd. 1.59 1.59 6:30 AM 5:00 PM Close Bridge
LC Slip repair US 50 George Washington Highway 19.65 19.65 7:30am 4:30pm
Construction Projects
Resurfacing WV 26 S. Preston Highway 0.00 9.42 7a 7p ditching, milling, paving, shoulder stone
4
DISTRICT 4 DAILY ROAD REPORT
Reporting Date: 10/27/2020
Activity Activity Description Route Route Route Name BMP EMP Start End Detail
Number Type Number Time Time
261 STABILIZE ROADWAY CO 12 TUCKER RUN 0.00 5.63 7:00 AM 3:30 PM 3 CWS
261 STABILIZE ROADWAY CO 12/4 HERSHMAN DR 0.00 0.53 7:00 AM 3:30 PM "
287 REMOVE DITCH OBSTACLES CO 3/2 HAWKINS RD 0.00 0.95 7:00 AM 3:30 PM 5 CWS
288 PULL SHOULDER OR DITCH PAVE PRESTON COUNTY 7:00 AM 3:30 PM 1 CW
210 paving 7:00 AM 3:30 PM 1 CW
201 PATCH BIT PAVEMENT CO 13/19 MIRACLE ROAD 0.00 0.53 7:00 AM 3:30 PM 6 CWS
201 PATCH BIT PAVEMENT CO 119/43 WEBSTER ALLEY 0.00 0.28 7:00 AM 3:30 PM "
201 PATCH BIT PAVEMENT CO 119/48 SWISHER LOOP 0.00 0.05 7:00 AM 3:30 PM "
201 PATCH BIT PAVEMENT HA 910 HUNT ROAD 0.00 0.98 7:00 AM 3:30 PM "
550 SHOP 39 SHOP 7:00 AM 3:30 PM 2 CWS/1 STKPR
803 SICK128 FAMILY DEATH 7:00 AM 3:30 PM 1 CW
803 ANNU123 ANNU123 7:00 AM 3:30 PM 2 CWS
COVID SICK COVID SICK 7:00 AM 3:30 PM 1 CW
801 OFFICE TAYLOR CO OFFICE 7:30 AM 4:00 PM 1 OA/1 CONSPT
Bridge Activities
Closures
Construction Projects
Resurfacing CO 13 Simpson Rd 0.00 5.62 7a 7p ditching, milling, paving, culverts
Bridge Activities
Closures
TRAFFIC CONTROL US 50 CORRIDOR D SECTION II 77.00 77.50 7:00AM 3:30PM FEDERAL BRIDGE INSPECTION
Construction Projects
5
DISTRICT 4 DAILY ROAD REPORT
Reporting Date: 10/27/2020
Activity Activity Description Route Route Route Name BMP EMP Start End Detail
Number Type Number Time Time
Bridge Activities
Closures
Construction Projects
Bridge beam repair I 79 I-79 NB 154.50 155.00 7:00pm 6:00am
Bridge Activities
Closures
Construction Projects
6
DISTRICT 4 DAILY ROAD REPORT
Reporting Date: 10/27/2020
Activity Activity Description Route Route Route Name BMP EMP Start End Detail
Number Type Number Time Time
Bridge Activities
Closures
Construction Projects