AIRCRAFT HANGER NO2 PLOT AFC-108 @ DUBAI SOUTH (DWC)

DOCUMENT REV. No: DATE:


No: Page 1 of 4

00 03-06-2020

PROJECT NAME: DC AVIATION AIRCRAFT HANGER NO-2 @ DUBAI SOUTH

INSPECTION TEST PLAN


For
POLYUREA WATERPROOFING

CONSULTANT
REV DATE DESCRIPTION
PREPARED APPROVED APPROVED
MUSTAFA FAISEL

00 Issued for Approval SITE


SALES ENGINEER
REPRESENTATIVE
ALFUTTAIM DC AVIATION HANGER – 2 ON PLOT No. AC-F10B, DUBAI SOUTH, UAE.
DOCUMENT No: REV. No: DATE: Page 2 of 4
00 03-06-2020

Inspection Test Plan

INSPECTION & TEST PLAN REF: WSC/ITP/20-145


PROJECT : DC AVIATION AL FUTTAIM AT AL MAKTOUM AIRPORT
CONTRACTOR : AMANA
ACTIVITY: POLYUREA
No./Docume VERIFYING/ INSPECTION / TEST POINTS
RESPONSIBLE INSPECTION &TEST
NO. ACTIVITY nt ACCEPTANCE CRITERIA CONTROL
PERSON REQUIREMNETS
Reference) DATA, FORM IM GAJ WSC

MATERIAL APPROVAL
APPROVED
COMPLIANCE WITH PROJECT
PREQUALIFICATION PROJEST/TECHNICA PREQUALIFICATION PREQUALIFICAT
A-1 SPECIFICATION SPECIFIED REQUIREMENTS/ APPROVAL DT DA H
APPROVAL L/MANAGER/ENGR DOCUMENT AS PER ION DOCUMENT
BY THE CONSULTANT
PROJECT REQUIREMNET
APPROVED MATERIAL MATERIAL
COMPLIANCE WITH PROJECT
APPROVAL OF PROJEST/TECHNICA APPROVAL & SAMPLE APPROVAL AND
A-2 SPECIFICATION SPECIFIED REQUIREMENTS/ APPROVAL DT DA H
MATERIAL L/MANAGER/ENGR DOCUEMNTS AS PER APPROVED
BY THE CONSULTANT
PROJECT REQUIREMNET SAMPLES
PREPARATION AND
COMPLIANCE WITH PROJECT APPROVED
APPROVAL OF PROJEST/TECHNICA SHOP APPROVED SHOP
A-3 SPECIFIED REQUIREMENTS/ APPROVAL SHOP DT DA H
CONSTRUCTION L/MANAGER/ENGR DRAWINGS DRAWINGS
BY THE CONSULTANT DRAWINGS
METHODOLOGY
PREPARATION AND
ASPER PROJECT COMPLIANCE WITH PROJECT
APPROVAL OF PROJEST/TECHNICA APPROVED
A-4 SPECIFICATION SPECIFICATION SPECIFIED REQUIREMENTS/ APPROVAL DT DA S
INSPECTION & TEST L/MANAGER/ENGR SUBMITTAL
REQUIREMNETS BY THE CONSULTANT
PLAN
PREPARATION AND
PROJEST/TECHNICA PROJECT HSE AS PER PROJECT COMPLIANCE WITH HSE
A-5 APPROVAL OF RISJ HSE POLICY DT DA S
L/MANAGER/ENGR PLAN REQUIREMENT REQUIREMENTS
ASSESSMENT
B CONSTRUCTION COMPLIANCE
SURFACE
PREPARATION
TECH. TECH.
B-1 CHECK VISUAL SURFACE AREA OF THE ROOF - H W W
SPECIFICATION SPECIFICATION
CLEANLINESS OF
ROOF
ALFUTTAIM DC AVIATION HANGER – 2 ON PLOT No. AC-F10B, DUBAI SOUTH, UAE.
DOCUMENT No: REV. No: DATE: Page 3 of 4
00 03-06-2020

INSPECTION
RAISE MATERIAL
VERIFICATIONOF REQUEST QC
METHOD INSPECTION REQUEST;
B-2 DELIVERED TECH ENGINEER AS PER APROVED SUBMISSION CHECKLIST,MIR DT DA H
STATEMENT COMLY WITH TECHNICAL
MATERIAL & DELIVRY
SPECIFICATION
NOTE
MATERIAL TO BE TRANSPORTED AND
STORED IN THEIR ORIGIBAL
STORAGE AND
TECH ENGINEER AS PER PROJECT PACKAGING UNTILL WHEN THEY ARE
B-3 HANDLING OF VISUAL INSPECTION - GR S S
QA/QC ENGR SPECIFICATION TOB USED. STORED AT DESIGNATED
MATERIAL
PLACE AND TO BE PROTECTED FROM
DIRT AND DUST
C APPLICATION OF WATERPROOFING
RAISE INSPECTION REQUEST
CONFORMANCE TO TECHNICAL
PROJECT ENGINEER INSPECTION
METHOD SPECIFICATION REQUIREMENTS AND
C-1 METALLIC PRIMER QA/QC ENGR/ SIKA VISUAL INSPECTION REQUEST QC H W W
SUBMITTAL SHOP DRAWING. COMPLY WITH
REPRESENTATIVE CHECKLIST
APPROVE METHOD STATEMNET/
MATERIAL SUBMITTAL
RAISE INSPECTION REQUEST
VISUAL INSPECTION / DFT CONFORMANCE TO TECHNICAL
SIKALASTIC 851R PROJECT ENGINEER INSPECTION
METHOD PULL OF TEST SPECIFICATION REQUIREMENTS AND
C-2 POLYUREA QA/QC ENGR/ SIKA REQUEST QC H W W
SUBMITTAL TENSILE/ELONGATION SHOP DRAWING. COMPLY WITH
APPLICATION REPRESENTATIVE CHECKLIST
TEST APPROVE METHOD STATEMNET/
MATERIAL SUBMITTAL
RAISE INSPECTION REQUEST
VISUAL INSPECTION / DFT CONFORMANCE TO TECHNICAL
PROJECT ENGINEER INSPECTION
SIKALASTIC METHOD PULL OF TEST SPECIFICATION REQUIREMENTS AND
C-3 QA/QC ENGR/ SIKA REQUEST QC H W W
TOPCOAT SUBMITTAL TENSILE/ELONGATION SHOP DRAWING. COMPLY WITH
REPRESENTATIVE CHECKLIST
TEST APPROVE METHOD STATEMNET/