BENGUET ELECTRIC COOPERATIVE, INC.
No. 4, Sout Orne, Baguio Cty
NOTICE OF POWER INTERRUPTION
Please bo formed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) ie schecuing Eletre SenroeInemsaton onthe flowing doles and tne
STAG OF] eT
EQUPT REF. OF eer
0 enew
care | me | 4209. | reeoer | ‘oeenenauso |AREAS AFFECTED Purrose scant. |onoeeneD Rove
AREA
aay ENECOPOMERTTERTUPTION
— 8013047 “arts of Riverside Ambiong, Le Trinidad |- Replacement of Rotten Pole and Rehabilitation of 133 336 Blesi PRO-325-2020
uote, | Feedet®5 | sonvasssros [Pats of Upper Riverside Ambion, Secondary Lines
JBERECO POWER NTERRUFTON: -
Laut + | ata, teeta SemmnySaecPot med eseemenenneramtneerinn rae] on | 14m | amen | PROZERED
‘Substation | Feeder Fuse Sectionalizer |Baiangbang), La Trinidad
BENECO POWER WTERRUPTION
Butcao tors ankayan Saabs catten and Como oe ee i”
Substation | S*Hl*4 | colalo Sectionalizer [locos Sur: Pars of Cervantes.
aa BERECO PONERTTERRUPTON:
viean rar ot sen cas HoghsLamen Voge eon, |eRecatoncf eranay oe ie ei eee |
Substation | Feeder02 | Loop Seconda leo cay
BENECO POWER WTERRUPTON: rapa
ovate tension ohne tne zs | xe | ammoin | Pobre aman
on, Pena, aon, Sol Cres, Usb wn
Tuesday, | gooam to Fuse Seotionatizer [P21 Fda, Insaation of Buyback Transformer (cont)
Sentenver | “Foor | subnaton | Feeders? BENECO POWER INTERRUPTION:
1.200 enztars [parsotTuana ProperandUreranoas Tudre, Panserenor ow |e sea | PRomoane
srsivaszaser_ frome
BENECO POWER WTERRUPTION
tok Bo14127 i wm, Docon, Tutte ‘Replacement of Raton Secondary Pole 45 180 ses ‘0Px-993-2020
sunt, | crounor | 20827 5 lnwnot sat Omen, Tate
BENECO POWER WTERRUPTON?
Repent Pt Transm om 108VA weo.cew | mecar.ano
BE |owo puning Sten in 1 iene 1 amo | MeOGw | Moose ann
ia auenne Reconfiguration of Pimary Stuctures
substation | Feeder 03 BENECO POWER INTERRUPTION
Wednesda. | ops on SRepacemert ote asomer on 788 ane | Nice | sc-se20z0
Septomber | "5:00 Pit Hottie Clamp [2470 Puming Staton (isan 2) oonva ‘ M ‘seo | PRO-304-2020
an . |: Reconfiguration of Primary Structures
BENECO POWER WTERRUPTION
meee Installaton of Buy Distributen Transformer
Cam Feeder 08 btdbeae |Morttnola Subdivision, Kisad Road, Baguio City _ — ar 32 Biles (PBB-085-2020
exbetenor Fuse Sectionalizer
BERECO FOREN RRO
— aod of Ganget 2, Tadiangan, Tuba |- Relocation of Primary Pole: BA 88 Biles: MSC-346-2020
‘Substation | Fe*d*r03 | Fuse Sectionalizer [Pat 0! Gangeb and Hyco 1 8. -
BENECO POWER NTERRUPTON:
Tursdox nay Poe sew | 9P%7020%0
Septomoer | S20 | Ak | croutor | BMPS ase and Lab, Amboy, Tel -Repacament of Ren Pay Po 5 s | nsociew | oPr-z0ze70
cane [BENECO POWER INTERRUPTION:
Lamst roast eee a es sao | seoowten|
etm, | reerst | pe Me ey [Osbon, eben and est, Gumeiag toa
age mn §&—ae EQUPT REF OF EST. NO.OF] EST. =
pare | me | SUB | reever | ‘e-eneraweD AREAS AFFECTED PURPOSE cons. |unoeuverco| crew nome
‘AREA arrecTen | ENERGY
[eo (| ee ae oe cee [fem | MconorenaneRRORTRON fee [emg ae aed
= ort dl Pet, Bau Rerouting of Pray tines r :
Func MOOS a |Pavte of PMA, Fort Per, Baguio Cty 2 01 752 Bes | sc-s03.2020
on satataion | Feeders? BENECO POWER HTERRUPTION aa
doy, |g, ubstation 5 e ‘oP Ka04:
savtomter | *20atic 1208205 late fuck, Hay How, eau iy -Reruing oma tines zu | 2 | pandas | Shxcaonzte0
25,2020 (cont)
[BENECO POWER WTERRUPTION:
Bulises> | creunoa | ,, 2500124 [Pans ot Abstr, Buyacoen Amaseygny, Legaoer, [neato ef BjteckOasbuten Tansiomes | sie | ass ‘anges | PB8-035-2020
‘Substation Fuse Sectionatzer |Amimay, Posation, Buus and Gamban, Batan 88.036.2090
whole of: Domiican Mirador Hil, Lourdes Subdvcion [BENECO POWER INTERRUPTION:
ete |-Rerousng of Primary tines conan
reer or | ng SOOTY. Iprts Nagin Rom St Vn omar Bap [ Ronettes Poe aso | swase | neocon | crxisesne
ICereten), MRR Queen of Peace, Compo Fipno, Loner (cont)
itor ope, San Roque Voge
|BENEGO POWER INTERRUPTION:
[Pas o Gomoogeo and Poblacion (oar Murcia Hal, 'PeP-088:2029
saturday. | gooaynty | Noth Sanitary Booesse [Pare |-Exenson of Primary Lines 0 tn | Ewonhtio | Pascoe
Soptomber | °2080 10 | Cor Fuse Sectionatzor -istataton of Snack Transformers eat
28,2020 ‘Substation (0c
fone |BENEGO POWER INTERRUPTION: =
Bc12406 See instalation of adatona pave ‘ SOC" | pep.o702020
FU ate (Whol of Balacbec, So. Tomes Proper, Baguio City 238 2076 Sees ple
iene |BENEGO POWER INTERRUPTION:
Fandar 0a | Fuse Strawberry |PArs of Strawberry Fisds, Swamp Ares, Betag and | Relocation of 3-15kVA Private Distribution 504 4,050 Bes sc-208.2020
Srmwberty lpaimawte, Pug a Tnidad I reciomers
Please _be termed that_the_ NATIONAL GRIO CORPORATION OF THE PHILIPPINES (NGCP) is scheaung Elecre Senice ntemupton onthe folowing dle and tino:
a EQUPT REF. OF ESTNO.OF] EST, peur
pare | me | SUS. | reever | ‘DEENERGIZED [AREAS AFFECTED PuRPose cons. |unoeuvereo) crew Rove
AREA asrecten | "ENERGY
Ls Trini: pars of Beckl (along Ambulino Rees) NGCP POWER INTERSUFTION:
Martenance works song Becke-Loakan 694
s:00 amt | Lamut 12012850 _|togen: Loscan (Aphaland, Angin, Tocmo,Labiab, | Maniensnes wo"
“Doone | substation | Feedortt | py, 2012880 | |ouect ots, Lunes Bee, Sad, Sabi Cemsong) zo | 19st sce a
x _ !Bokod: Ambukio (Guesset Sombrero, Adonet Seno,
vine, Lebena top, Ambango)
NOTES. 1 Thisabosenes as noticeto a concerned Cate & Commuricaton Companies fo nepetandinsute necessary eafty meacueuactone
con ther cablosinesetached onthe affected BENECO poles.
2. Aways consdec lines energized, Power maybe restore sare than the scheduled time
For more nformston peste contact the folowing nos. G/-44QU local 1 6 | U90UBID/ 202 /M MZ NES
Manager, N
x: alloca! Radio & TV stations, Telephone & Cable Companies, all lected tig loaders
radio roomfednnredileiconeiNGCP
Page 202