SCHEDULE - A
(See Clause 2.1 and 8.1)
1 THE SITE
1.1 Site of the Eight-Lane Project Highway shall include the land, buildings, structures and road works
as described in Annex-I of this Schedule-A.
1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of this
Schedule-A.
1.3 An inventory of the Site including the land, buildings, structures, road works, trees and any other
immovable property on, or attached to, the Site shall be prepared jointly by the Authority
Representative and the Contractor, and such inventory shall form part of the memorandum referred
to in Clause 8.2(i) of this Agreement.
1.4 The alignment plans of the Project Highway are specified in Annex-III. The proposed levels [FRL]
as indicated in the alignment plan shall be treated as an approximate assessment. The contractor
shall design the Road Profile of the project highway based on site/design requirement specified in
Schedule-D.
1.5 The status of the environment clearances obtained or awaited is given in Annex IV.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-1
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Annex – I
(Schedule-A)
Site for Eight Laning
The Site of the project highway is a section of Delhi – Vadodara National Highway No. 148N
commencing from Ch. 602+420 (Design Ch. 150+000) in Kandarwasa village and ending at Ch.
627+420 (Design Ch. 175+000) in Bawadi village of Ratlam district and passes through Greenfield
area in the State of Madhya Pradesh. The land, carriageway and structures comprising the site are
described below.
The project highway is a Greenfield alignment passing through Palduna, Bharoda, Badoda,
Chandodiya, Khedi, Dhamnod, Iswar Thuni villages. Latitude and longitude of the project corridor
lies between 23°30'20"N, 75°2'32"E and 23°19'49"N, 74°53'55"E. An index map showing the
existing features of the Project Highway is given at Appendix A-I.
1.3 Terrain
The terrain along the project stretch is predominantly plain and rolling terrain.
2 Land
The site of the project highway comprises the land (sum total of land already in possession and
land to be possessed) is detailed in Annex-II of this Schedule A.
3 Carriageway
4 Major Bridges
The Site includes the following ROB (road over railway line)/RUB (road under railway line):
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-2
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
6 Grade separators
Type of Structure
Chainage No. of Spans with
S. No. Width (m)
(km) Foundation Superstructure span length (m)
Nil
7 Minor bridges
Existing
S. No. Railway Chainage Level Crossing No. Remarks
Chainage (Km)
Nil
10 Culverts
11 Bus bays
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-3
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Nil
S. No. Chainage (km) Length (m) Left Hand Side Right Hand Side
Nil
S. Location Type
No. From km to km Masonry/cc (Pucca) Earthen (Kutcha)
Nil
14 Major junctions
(NH: National Highway, SH: State Highway, MDR: Major District Road)
15 Minor junctions
S.
Existing km Type of Junction Direction Width of Road Name of Place
No.
Nil
16 Bypasses
S. Chainage (km)
Name of bypass (town) Length (in Km)
No. From km to km
Nil
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-4
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
18 Submergence Locations
No existing road has been utilized as part of the project alignment hence submergence location is not
applicable.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-5
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Appendix A-I
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-6
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Annex II
(Schedule-A)
The dates on which the Authority shall provide Right of Way of Construction Zone to the Contractor on
different stretches of the Site are stated below:
Additional Land at interchanges, toll plaza/booths, wayside amenities shall be provided within 150 days of
the appointed date as per Agreement.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-7
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-8
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-9
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-10
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-11
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-12
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-13
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-14
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-15
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-16
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-17
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-18
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-19
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-20
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-21
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-22
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-23
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-24
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Annex – III
(Schedule-A)
Alignment Plans:
1. The alignment of the Project Highway is enclosed in alignment plan. Finished road level indicated in
the alignment plan shall be treated as an approximate assessment. The contractor shall design the road
profile of the project highway based on site/design requirement specified in Schedule-D.
2. Traffic Signage plan of the Project Highway showing numbers & location of traffic signs is enclosed.
The contractor shall, however, improve/upgrade upon the traffic signage plan as indicated in Annexure-
III based on site/design requirement as per IRC:SP:99-2013 & IRC:67-2012.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-25
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Request for Proposal – Bid Documents
Annex – IV
(Schedule-A)
Environment Clearances
TOR for Environment clearance has been approved by MoEF&CC. Public Hearing has been concluded on
07th January 2019 and EIA/ EMP report is submitted to MoEF&CC. EC is expected by 31.05.2019.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page A-26
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh