2.tripping in Hole

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Daqing Petroleum Iraq Branch HSE-MS/Doc. No.

22

JOB SAFETY ANALYSIS 工作安全分析

Rig: Well: Date:


Associated Permit No(IF required).:
工作许可号(如果需要)
Loacation/Area: Date Of Elaboration:
位置/区域
Work/Job/Project : Crew:
工作/工程名称 TRIPPING IN HOLE 人员:
Description For the job: Estimated Time Hours
工作描述: 预计时间: 小时
N0. Work Sequence Hazards or Potential Incidents Recommendations to Eliminate or
(Job Steps) Reduce Hazards
SET SLIPS IN PROPER WEIGHT HELD IN ELEVATORS UNTIL
1 RECESS AND PINCH POINTS,BACK STRAIN DOG COLLAR INSTALLED. 2 MEN TO
INSTALL DC PUT DOG COLLAR ON
BREAK CONN ON P/U TUGGER TO BE USED, PLACE HANDS
2 PINCH POINTS,BACK STRAIN
SUB AND REMOVE IN CORRECT PLACES
CONT TO RIH WITH
3 PINCH POINTS,BACK STRAIN SAME AS ABOVE
DC
INSTALL X/O AND
4 PINCH POINTS,BACK STRAIN SAME AS ABOVE
HW
5 RIH HW TO DP PINCH POINTS,BACK STRAIN SAME AS ABOVE
6 RIH WITH DP PINCH POINTS,BACK STRAIN SAME AS ABOVE

Executor Personnel 执行人员


Company/RIG Position Signature Company/RIG Position Signature
公司/队伍 岗位 签字 公司/队伍 岗位 签字

Elaborated By: HSE Supervisor.: Rig Manager:

Name: Name: Name:


Signature:_________________ Signature: ____________ Signature: ____________

Observations: Personnel Understood And Assumed Risk Associated With The Work To Be Done.
Daqing Petroleum Iraq Branch HSE-MS/Doc. No.22

You might also like