BILL OF MATERIALS AND COST ESTIMATES

Date : Aug. 24,2020


Project : 6th Storey Commercial-Office Building with Roof Deck and Basement
Owner : Mr. Delfin T. Hallare Jr.
Location : 10 East Capitol Drive, Brgy. Kapitolyo Pasig City
Subject : Bill of Materials and Cost Estimates

ITEM NO. QTY. Unit DESCRIPTION UNIT PRICE AMOUNT

Fittings Threaded Connection Typical Layout ( 4th to 6th )


TREADED
150 pcs BR 1x1 1/2 44.00 PHP 6,600.00
12 pcs End Cap 2 104.00 PHP 1,248.00
150 pcs Square Plug 1/2 17.00 PHP 2,550.00
30 pcs Tee red 2x1 247.00 PHP 7,410.00
120 pcs Elbow 1 x 90 deg 53.00 PHP 6,360.00
108 pcs Tee 1 85.00 PHP 9,180.00
12 pcs Union Patente1 146.00 PHP 1,752.00
CONSUMABLE MATERIALS
144 pcs Loop Hanger 1 19.00 PHP 2,736.00
30 pcs Loop Hanger 2 24.00 PHP 720.00
6 box Expansion Shield 3/8 6.00 PHP 36.00
7 pcs Full Treaded Rod 3/8 (40mtrs) 105.00 PHP 735.00
16 gal Red Oxide 443.00 PHP 7,088.00
12 gal International Red 640.00 PHP 7,680.00
4 gal Paint Thinner 294.00 PHP 1,176.00
18 pcs Rubber Gasket 3 81.00 PHP 1,458.00
48 pcs Bolt 5/8 x 3 38.00 PHP 1,824.00
6 pcs Paint Brush 2 " 25.00 PHP 150.00
600 rolls Teflon tape 11.00 PHP 6,600.00
40 kg Welding rod 6011 139.00 PHP 5,560.00
40 kg Welding rod 6013 139.00 PHP 5,560.00
4 box Cutting Disc 4" 40.00 PHP 160.00
2 box Grinding Disc 14" 250.00 PHP 500.00
8 pcs Angular bar 1 1/2 x 1 1/2 x 6m 1,162.00 PHP 9,296.00
500 pcs Bolt 3/8 x 1" 6.00 PHP 3,000.00
400 pcs Nut and Washer 3/8 2.50 PHP 1,000.00
10 pcs Hacksaw Blade 92.00 PHP 920.00
18 pcs Cutting Disc 14" 250.00 PHP 4,500.00
BI PIPES ERW SCH 40
14 pcs Pipes 1 (84 mtr) 848.00 PHP 11,872.00
3 pcs Pipes 2 (18 m) 1,776.00 PHP 5,328.00
1 pcs Pipes 3 (6m) 3,776.00 PHP 3,776.00
1 pcs Pipes 1 1/2 (6m) 1,372.00 PHP 1,372.00
2 pcs Pipes 4 (12m) 5,760.00 PHP 11,520.00
BILL OF MATERIALS AND COST ESTIMATES

Date : Aug. 24,2020


Project : 6th Storey Commercial-Office Building with Roof Deck and Basement
Owner : Mr. Delfin T. Hallare Jr.
Location : 10 East Capitol Drive, Brgy. Kapitolyo Pasig City
Subject : Bill of Materials and Cost Estimates

ITEM NO. QTY. Unit DESCRIPTION UNIT PRICE AMOUNT

FITTING WELDED CONNECTION


18 pcs Elbow 3" 258.00 PHP 4,644.00
12 pcs Flanges 3" 262.00 PHP 3,144.00
18 pcs Elbow 4" 90 deg 329.00 PHP 5,922.00
6 pcs Bull Cap 4" 314.00 PHP 1,884.00
GATE VALVE
6 pcs Os and Y 3"mm dia 11,800.00 PHP 70,800.00
6 pcs Sight Glass 625.00 PHP 3,750.00
12 pcs Ball Valve 1" 495.00 PHP 5,940.00
6 sets Fire Hose Cabinet 10,500.00 PHP 63,000.00
150 pcs Sprinkler Head Upright 1/2" 175.00 PHP 26,250.00
PUMP ACCESSORIES
1 pcs Flexible Connection 100 mm dia 35,000.00 PHP 35,000.00
1 pcs Os and Y Valve 100mm dia 14,625.00 PHP 14,625.00
1 pcs Pressure Relief Valve 75 mm dia 35,000.00 PHP 35,000.00
1 pcs Waste Cone 75mm x 200 mm dia 0.00 PHP -
1 pcs Check Valve 100mm dia 11,000.00 PHP 11,000.00
1 set Alarm Check Valve complete with Trimmings 100mm dia 48,750.00 PHP 48,750.00
2 pcs OS and Y Valve 75mm dia 11,800.00 PHP 23,600.00
1 pcs Flow Meter 100mm dia 0.00 PHP -
2 pcs Gate Valve 40mm dia 1,237.00 PHP 2,474.00
1 pcs Check Valve 40 mm dia 1,100.00 PHP 1,100.00
2 pcs Flexible Connection 40 mm dia 1,500.00 PHP 3,000.00
3 pcs Gate Valve 1/2" dia 298.00 PHP 894.00
1 pcs Check Valve 1/2" dia 250.00 PHP 250.00
1 pcs Foot Valve 100 mm dia 8,000.00 PHP 8,000.00
1 pcs Foot Valve 40mm dia 1,000.00 PHP 1,000.00
10 pcs Fire Hose Valve 65mm dia 5,625.00 PHP 56,250.00
1 pcs Check Valve 75 mm dia 9,125.00 PHP 9,125.00
2 pcs Snots 65 mm with Cap and Chain 3,080.00 PHP 6,160.00
2 set Identification Plate for Fire Department Connection 0.00 PHP -
BILL OF MATERIALS AND COST ESTIMATES

Date : Aug. 24,2020


Project : 6th Storey Commercial-Office Building with Roof Deck and Basement
Owner : Mr. Delfin T. Hallare Jr.
Location : 10 East Capitol Drive, Brgy. Kapitolyo Pasig City
Subject : Bill of Materials and Cost Estimates

ITEM NO. QTY. Unit DESCRIPTION UNIT PRICE AMOUNT

FITTINGS
10 pcs Slip on Flange 150 mm Dia 505.00 PHP 5,050.00
8 pcs Slip on Flange 100 mm Dia 345.00 PHP 2,760.00
5 pcs Elbow 100 mm dia x 90 Deg 330.00 PHP 1,650.00
3 pcs Tee Red 100 x 75 mm 204.00 PHP 612.00
3 pcs Tee STD 100 mm 447.00 PHP 1,341.00
5 pcs Elbow 100 mm dia x 90 Deg 330.00 PHP 1,650.00
5 pcs Elbow 1/2 x 90 Deg 25.00 PHP 125.00
3 pcs Tee STD 1/2 " 35.00 PHP 105.00
2 pcs Union Patente 1/2 112.00 PHP 224.00
120 pcs Bolt 5/8 x3 inch w/ nut and washer 5/8 38.00 PHP 4,560.00
10 pcs Rubber Gasket 4 inch 115.00 PHP 1,150.00
6 pcs Rubber Gasket 3 inch 85.00 PHP 510.00
6 pcs Bushing Red 1/2 x 1/4 21.00 PHP 126.00
10 pcs Nipple 2 1/2 - 8 inch w/ tread 384.00 PHP 3,840.00

Total PHP 588,332.00


Note : All materials listed are based on the given cutting list made by the Subcontractor

Prepared by: Approved and Checked by:

Archt. Dorothy P. Castro,uap Francis Del S. Hallare III

Architect Project Head


BILL OF MATERIALS AND COST ESTIMATES

Date : Aug. 24,2020


Project : 6th Storey Commercial-Office Building with Roof Deck and Basement
Owner : Mr. Delfin T. Hallare Jr.
Location : 10 East Capitol Drive, Brgy. Kapitolyo Pasig City
Subject : Bill of Materials and Cost Estimates

BASEMENT CROSSMAIN AND HORIZONTAL PIPING

Item No. QTY. Unit DESCRIPTION UNIT PRICE AMOUNT

Bi Pipes ERW SCH 40 X 6 Meters


1 pc Pipes 1 "( 1m ) PHP 848.00 PHP 848.00
1 pc Pipes 2" (3 m) PHP 1,776.00 PHP 1,776.00
1 pc Pipes 3"(4m) PHP 3,776.00 PHP 3,776.00
1 pc Pipes 1 1/2 (1m) PHP 1,372.00 PHP 1,372.00
1 pc Pipes 4 (4m) PHP 5,760.00 PHP 5,760.00
FITTINGS WELDED CONNECTION
6 pcs Elbow 4x 90 degree PHP 330.00 PHP 1,980.00
2 pcs Tee Red 4 x3 PHP 204.00 PHP 408.00
2 box Tee STD 3 PHP 388.00 PHP 776.00
2 length Slip on Flanges 3 PHP 262.00 PHP 524.00
2 gal Concentric Red 3x2 PHP 143.00 PHP 286.00
6 gal Elbow 3x 90 degree PHP 218.00 PHP 1,308.00
3 gal Threadolet 1 1/2" PHP 225.00 PHP 675.00
2 pcs Threadolet 1" PHP 120.00 PHP 240.00
FITTINGS TREADED CONNECTION
5 pcs Tee Red 2x 1 /2 PHP 247.00 PHP 1,235.00
3 pcs Tee Red 2x1 PHP 247.00 PHP 741.00
2 pcs End Cap 2 PHP 104.00 PHP 208.00
10 pcs Elbow 1 1/2 x 90 Degree PHP 105.00 PHP 1,050.00
13 pcs Tee Red 1 1/2 x1 PHP 168.00 PHP 2,184.00
11 pcs Bell Red 1 1/2 x1 PHP 82.00 PHP 902.00
30 pcs Elbow 1" x 90 deg PHP 53.00 PHP 1,590.00
15 pcs Tee STD 1 PHP 85.00 PHP 1,275.00
6 pcs Elbow 2" x 90 deg PHP 82.00 PHP 492.00
38 pcs Bell Red 1 x 1/2 PHP 44.00 PHP 1,672.00
1 pcs Union Patente 1" PHP 146.00 PHP 146.00
VALVE AND ACCESSORIES
1 pcs Os and Y Valave 3" PHP 11,800.00 PHP 11,800.00
1 pcs Sight Glass PHP 625.00 PHP 625.00
1 pcs Gate Valve PHP - PHP -
1 set Fire Hose Cabinet Surface Mounted PHP 10,500.00 PHP 10,500.00
40 pcs Sprinkler Head Upright 1/2" PHP 175.00 PHP 7,000.00
BILL OF MATERIALS AND COST ESTIMATES

Date : Aug. 24,2020


Project : 6th Storey Commercial-Office Building with Roof Deck and Basement
Owner : Mr. Delfin T. Hallare Jr.
Location : 10 East Capitol Drive, Brgy. Kapitolyo Pasig City
Subject : Bill of Materials and Cost Estimates

BASEMENT CROSSMAIN AND HORIZONTAL PIPING

Item No. QTY. Unit DESCRIPTION UNIT PRICE AMOUNT

CONSUMMABLES MATERIALS
10 kgs Welding rod 6011 PHP 163.00 PHP 1,630.00
10 kgs Welidng 6013 PHP 139.00 PHP 1,390.00
30 pcs Loop Hanger 1" PHP 19.00 PHP 570.00
15 pcs Loop Hanger 1 1/2" PHP 19.00 PHP 285.00
6 pcs Loop Hanger 2" PHP 24.00 PHP 144.00
2 pcs U-Bolt 3" PHP 40.00 PHP 80.00
3 pcs U-Bolt 2" PHP 38.00 PHP 114.00
2 box Cutting Discs 4" PHP 2,000.00 PHP 4,000.00
1 box Grinding disc 4" PHP 6,250.00 PHP 6,250.00
5 pcs Cutting disc 14" PHP 250.00 PHP 1,250.00
100 pcs Expansion Shield 3/8" PHP 6.00 PHP 600.00
4 pcs Full Threaded Rod 3/8 x 3mtr ( 10 meters) PHP 105.00 PHP 420.00
2 pcs Rubber Gasket 3" PHP 81.00 PHP 162.00
8 pcs Bolt 5/8 x 3" PHP 35.00 PHP 280.00
100 roll Teflon Tape 3/4 PHP 11.00 PHP 1,100.00
1 pcs Angular Bar 1 1/2 x 1 1/2 x 6 mtrs PHP 1,162.00 PHP 1,162.00
30 pcs Bolt 3/8 x 1" PHP 6.00 PHP 180.00
3 gal Red Oxide Primer PHP 443.00 PHP 1,329.00
4 gal International Red PHP 640.00 PHP 2,560.00
3 pcs Paint Brush #4 PHP 47.00 PHP 141.00
2 gal Paint Thinner PHP 294.00 PHP 588.00

Total PHP 85,384.00


Note : All materials listed are based on the given cutting list made by the Subcontractor

Prepared by: Approved and Checked by:

Archt. Dorothy P. Castro,uap Francis Del S. Hallare III


Architect Project Head