Day: Monday EPC CONTRACTOR DAILY REPORT TO

Date: 01-15-2018 GNPOWER DINGININ LTD. CO.


EPC contractor name: Shanghai Electric Power Construction
EPC contract no.: SEPC-GNPD-EPC-001
Project: GNPD 2 X 600 MW Coal Fired Power Project
Project site location: GN Power Dinginin Power Station, Bataan, Philippines

Reporting period Weather conditions during reporting period


Start Finish
7:00 11:00 Sunny
am am

Labor resources Staff Workforce Total


EPC contractor: Shanghai Electric Power Construction (SEPC)
Subcontractor: JVCD CONSTRUCTION & GENERAL SERVICES 7 70 77
Subcontractor:
Subcontractor:
Subcontractor:
Supply & Erect Subc.:
Vendor representative:
Total: 7 70 77
Equipment resources Equipment numbers
Item no. Equipment description: Used Breakdown Total
01 Excavator 3 2 5
02 On Highway Dump truck 32 0 32
03 Bulldozer 0 1 1
04 Loader 0 1 1
05 Compactor 1 0 1
06 Boom truck 0 0 0
07 Mini Dump Truck (Fuel) 1 0 1
08 Tower Light 1 0 1
09 Water Truck (11,100 liters) 1 0 1
10 Generator Set 0 0 0
TOTAL 39 4 43

Page 1 of 2
Act. No.: ACTIVITY ON SITE
01 Excavation Activity
02 Hauling of soil going to fill area 3
03
04
05

Allocation of resources
Act. no.: (Eqpt. item no. x quantity) + (Eqpt. item no. x quantity) + ………. Supervision Workforce Total

01 01X5+02x32+03x1+04x1+05x1+06×0+07x1+08x1+09x1 7 70 77
02
03
04
05

Production statistics
Actual
Total Planned Planned Forecast Ahead or
Total achieved Percent production
Measured item estimated production completi completio behind
quantity complete today
quantity today on date n date schedule
Act. no.: 01-15-2018
Common
01 Excavation@ 93,255m³ 315m³
Intake Area
Embankment @
02 Fill Area 3
93,255³ 315m³

03
04
06
07

Item no.
01
02
03

Page 2 of 2