SCL-QF-043 - IS 16242 Observation Sheet
SCL-QF-043 - IS 16242 Observation Sheet
SCL-QF-043 - IS 16242 Observation Sheet
PRODUCT DETAILS
Tests requested as per IS 16242(Part 1): 2014/ IEC 62040-1:2008
Product: Uninterruptible Power Serial. No
Systems
Model/ Size/Range Make
Testing procedure according to work instruction SCL/WI:
Temperature & humidity at the Start of test: °C; %. End of test: °C & %
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
1. Components Cl. 4.5 of IS 16242(Part 1):2014
1.5.2/RD Evaluation and testing of
components
1.5.3/RD Thermal controls
1.5.4/RD Transformers
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 1 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Method:
1. If the equipment has more than one rated voltage then measured input current at each rated voltage.
2. if the equipment has more than one or more rated voltage ranges then measured input current at each end of each rated
voltage ranges.
3. if the single rated current is marked on the marking plate then it compared with the higher value of input current measured
at associated rated voltages.
4. if two rated currents are marked on the marking plate separated by hyphen then it compared with the two values of input
current measured at associated rated voltages.
5. if the equipment is intended for direct connection to an ac mains supply then take tolerances
+6% and -10% on rated voltage above 230v.
+10% and -10% on rated voltage 230v single phase or 400v three-phase.
6. if the equipment is intended connection to a dc mains supply then take tolerance
+20% and -15% on rated voltage
7. if the equipment is not intended to connect to mains supply directly then the rated voltage of the equipment is considered
for test.
Note:
a) Recharging mode-Applicable to the primary power received by the UPS while also charging the battery.
b) Stored energy mode- Applicable to DC current from, for example, a remote battery while simulating primary power outside.
c) Bypass mode
d) Normal mode- with a fully charged battery, the UPS should receive power from the primary power source.
While supplying rated output under each of the conditions described in a) to d), the relevant AC or DC steady state input current should
not exceed 110% of the rated current.
Comment:
Comment:
Comment:
Table Continued…………
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
2. Marking and Instructions Cl. 4.7 of IS 16242(Part-1):2014
4.7.1 General
4.7.2 Power Rating
Other symbols
Certification marks
Comment:
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 3 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
4.7.3 Safety Instructions
4.7.3.1 General
4.7.3.2 Installation
Location in restricted access
location only
Permanent connection to UPS
4.7.3.3 Operation
4.7.3.4 Maintenance
Method:
1. Rub the marking gently with a piece of cloth soaked with water for a period of 15 second by hand.
2. Then rub the marking gently with a piece of cloth soaked with petroleum spirit or n-hexane for 15 second by hand.
Note: The petroleum spirit to be used for the test is aliphatic solvent hexane having a maximum aromatics content of 0.1% by volume, a
kauributenol value of 29, an initial boiling point of approximately 65ºC, a dry point of approximately 69ºC and a mass per unit volume of
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 5 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
approximately 0.7kg/l.
Note:
1. For UPS systems intended for use as pluggable equipment type B or fixed installation, where the earth leakage currents of the UPS and
connected loads sum in the primary UPS protective earth conductor exceeds or is likely to exceed the limit of 5.1/RD under any mode of
operation, the unit shall carry a warning label as required by 5.1/RD, and the installation manual shall define the connection method to the
primary power source.
2. For an accessible non-conductive part, the test is made of metal foil having dimensions of 100mm x 200mm in contact with the part.
3. Accessible conductive parts that are incidentally connected to other parts are tested both as connected and disconnected parts.
4. Value of touch current shall not exceed the limits given Table 5A.
Equipment used for test Equipment id:
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
4.7.15 Language(s)
1.7.2.1/RD
and
1.7.8.1/RD
4.7.16 Durability of markings
1.7.11/RD
4.7.17 Removable parts
1.7.12/RD
Battery type
Warning label
Instructions
Test by inspection
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 7 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Supplementary information:
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
2.1.1.4/RD Access to hazardous voltage
circuit wiring
2.1.1.5/RD Energy hazards
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 9 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
1. If the measured voltage is 2V or more it will consider as hazardous energy level unless an overcurrent protective devices opens during
operation or any other reason due to which 240VA power will not be maintain for 60s.
2. The store energy in the capacitor is at hazardous energy level if voltage is 2V or more. Store energy E is calculated by using following
formula.
E=0.5 CU2 X 10-6
Where,
U = voltage across capacitor in volts (V),
C = capacitance in microfarad ( F)
E = Energy Measured in joules (J).
Safety and Precaution:
1. Avoid contact with energized electronics circuits.
2. Disconnect the power source before servicing or preparing electrical.
3. Make use of tools and equipment with non-conducting hands when working on electrical devices.
Temperature & humidity of laboratory at the start of test: °C & %
Equipment used for test Equipment id:
4.7.20 TABLE: Energy hazard measurement
Voltage (max.) (V) Current (max.) (A) VA (max.)(VA) Observation
Supplementary Information:
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
2.3.2.3/RD Protection by earthing
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 11 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
2.6.2/RD Functional earthing :
The Functional earthing either separated
from hazardous voltages by double- or
reinforced insulation or safely connected
to Protective Bonding Conductor.
2.6.3/RD Protective earthing and protective bonding
conductors
2.6.3.2/RD Size of protective earthing Conductors
Rated current (A), cross-sectional area
(mm2), AWG
2.6.3.3/RD Size of protective bonding Conductors
2.6.4/RD Terminals
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 13 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Test Requirement:
During test, test probe shall not access to energized part in operator access area and openings in enclosures.
Method:
1. Connect line and neutral terminal of power supply cord of equipment under test together and apply one output terminal of PAES Test
apparatus to it. Whereas the other remaining output terminal of PAES Test Apparatus to the test finger, test pin or test probe as per the
requirement.
2. Adjust AC voltage 42.4V on PAES Test apparatus by adjusting its voltage knob.
3. Now apply test finger, test pin or test probe to applicable part.
4. Check whether there is any access to energized part with the application of test finger, test pin or test probe by observing indicator lamp on
the PAES apparatus, it will glow when there is an access to energized part with test finger, test pin or test probe.
5. Test finger applies to the openings in the enclosures after removal of the parts that can be detachable by operator, including fuse holders,
operator accessible doors and covers. Apply 30N force by means of a straight unjointed version where openings prevented to enter test
finger.
6. For the equipment to be installed in a restricted access location, the requirements for operator access area apply, except as permitted in the
secondary circuit at hazardous voltage, hazardous energy level and no requirement is specified regarding contact with bare parts of TNV-1,
TNV-2 and TNV-3 circuits
Note: Where Contact between test tool and part is not permitted in above test and if voltage exceeding 1000Vac or 1500V.dc then there shall be air
gap between the part at hazardous voltage and test finger or test pin in its most unfavorable position shall be either as per basic insulation
requirement specified in cl. 2.10.3 or shall withstand electric strength test as per cl. 5.2.2 of the same standard.
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
3.4.2/RD Disconnect devices
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 15 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Method:
1. Measure the voltage between any two conductors or between any such conductor and earth of SELV circuit by operating
equipment in single fault condition with the help of oscilloscope or Digital Multimeter as per the requirement. Also measured the time
duration t1 and t2 as per waveform with the help of oscilloscope if required.
Note:
1: For single fault condition if the measured voltage exceeds to voltage limit 42.4Vpeak, or 60Vd.c) it
should not be longer than 200ms, but voltage shall not exceeds to 71Vpeak or 120Vd.c
2: If measured output is having a repetitive nature after the single fault, then additional pulses exceeding V1
(But not exceeding V2) are permitted under following condition
If t1 ≤ 20ms, t2 shall be greater than 1s.
If t1 > 20ms, t2 shall be greater than 3s and t1 shall not exceed 200ms.
Safety and Precaution:
1. Avoid contact with energized electronics circuits.
2. Disconnect the power source before servicing or preparing electrical.
Temperature & humidity of laboratory at the start of test: °C & %
Equipment used for test Equipment id:
2.2.3 TABLE: SELV measurement (under fault conditions)
Location Voltage (max.) (V)
V peak V d.c
Supplementary information:
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
2.8.7.2/RD Overload test
5.6.2.1 Introduction
5.6.2.2 Covers
5.6.2.3 Location and guarding of parts
2.10.1.1/RD Frequency
Method:
1. Connect the equipment, measure the voltage across 2KΩ resistor or voltage U2 of measuring instrument of D.1 network.
2. Calculate the current on the basis of measured value of voltage and resistor value.
Note:
1. For the frequency above 1 KHz the limit of 0.7mA peak or 2mA is multiplied by the value of the frequency in KHz but shall not exceed to
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 17 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
70mA peak.
2. For parts not exceeding 450V peak or d.c, the capacitance shall not exceed 0.1µF, parts those exceeds 450Vpeak or d.c but not exceed 15kV
peak or d.c, for such circuit capacitance should not exceed (45/U) nF, where U is in Kilovolt and part those exceeds 15KV peak or d.c, the
capacitance should not exceed to the (700/ U2) nF, where U is in Kilovolt.
3. When using the measuring instrument of Figure D.1 of annex D, voltage U2 is measured and current is calculated by dividing the measured
voltage U2 by 500 calculated current shall not exceeds to 0.7mA.
4. If one side of the limited current circuit has a conductive connection to earth, point B of measuring instrument of Figure D.1 is connected to
that side.
5. An accessible conductive part or circuit separated from another part by double or reinforced insulation that is bridged by a resistor or group of
resistor is treated as a limited current circuit.
Supplementary information:
Method:
1. Measured output voltage Uoc by disconnecting load, measured maximum current Isc at output by short-circuit at non capacitive load and
also measure maximum output power S (VA) apparent power.
2. After the measurement, check the measured reading of Uoc, Isc and S (VA) are within limit.
Note:
1. Measurement of Isc and S (VA) are made after 5 sec after application of load in case if protection is by an electronic circuit or positive
temperature coefficient device and 60sec after in other case.
2. for inherently limited or impedance limited output compliance is check as per Table2B along with that if in impedance limited output, if
Positive coefficient device is used it should be pass the test as per clause 15,17,J.15 and J. 17 of IEC 60730-1
3. For regulatory network limited output should compliance with table 2B, both with and without simulated single fault in regulatory network.
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
2.10.3.4/RD Clearances in secondary circuits
b) Transients from a
telecommunication network
2.10.4/RD Creepage distances
Supplementary information:
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 19 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Method:
1. Accessible conductive parts of Class I equipment, which might assume a hazardous voltage in the event of a single insulation fault should
be reliably connected to a protective earthing terminal within the equipment.
2. This requirement does not apply to accessible conductive parts that are separated from parts at hazardous voltage by earthed metal parts or
solid insulation or an air gap or a combination of the two, meeting the requirements for double insulation or reinforced insulation.
3. For testing of basic insulation, short line & neutral and apply high voltage as per requirement between line-neutral short & earth.
4. In reinforced insulation measurement, probes of high voltage are connected between primary & secondary portion of the tested part.
5. Apply voltage as per Table 5B applied for 60sec.
Basic/Supplementary :
Reinforced:
Supplementary information:
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
Working voltage
a) Basic insulation not under stress
Supplementary, reinforced
insulation
2.10.6/RD Construction of printed boards
2.10.6.1/RD Uncoated printed boards
2.10.6.2/RD Coated printed boards
2.10.6.3/RD Insulation between conductors on
the same inner surface of a printed
board
2.10.6.4/RD Insulation between conductors on different
layers of a printed board
a) Minimum Thickness of insulation:
0.4mm or
b) Confirm with one of the specification
and pass the relevant tests as per Table 2R
2.10.7/RD Component external terminations
2.10.8/RD Tests on coated printed boards and coated
components
2.10.8.1/RD Sample preparation and preliminary
inspection
2.10.8.2/RD Thermal conditioning
Method:
1. Check the protective current rating and note down in datasheet. And on the basis of that decide the test current and duration of the test.
2. To eliminate resistance due to probe of test apparatus before applying test current to the equipment, measure voltage drop between the
probes of apparatus by shorting them and apply test current as decided above. Note down voltage drop which is displayed on the test
apparatus after the application of the test current in data sheet.
3. Now to measure voltage drop between the mains protective earthing terminal and point in the equipment to be earthed. Connect one probe to
the mains protective earthing terminal and other probe to the point in the equipment to be earthed. Apply test current for the duration as per
standard. And note down voltage drop and subtract the measured voltage drop the mains protective earthing terminal and point in the
equipment to be earth.
4. Calculate resistance of protective bonding conductor with the help of test of the measured voltage drop in test procedure XI of this work
instruction and the test current. Note down the calculated resistance of protective bonding current.
5. The UPC output a.c circuit shall be referenced to the protective earth of the equipment as required by the AC power distribution system.
6. The bonding of the protective earth and neutral conductors applies to all modes of operation of the unit.
7. The physical bonding point may be external to the UPS.
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 21 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Note:
1. The output a.c circuit of pluggable type A or pluggable type B UPS that is not separately derived source during the normal mode of
operation is not required to be bonded in the stored energy mode of operation.
2. If the protective current rating is 16A or less then test current will be 200% of the protective current rating, applied for the 120Sec.
3. If the protective current rating is more than 16A then test current will be 200% of the protective current rating and test
duration will be as specified in table 2E.
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
2.10.12/RD Enclosed and sealed parts
4 Wiring, connections and supply Cl. 6 of IS 16242(Part-1):2014
6.1.1 Introduction
3.1/RD
3.1.1/RD Current rating and overcurrent protection
5.5 Over current and fault protection N/A Pass Fail Date:
T T
Test Requirement:
The protection from short circuit should operate within 5 s.
Method:
The inverter output is controlled solely by a current limiting circuit, the available short-circuit current or overload current shall not produce a
hazard.
Note:
The purpose of this to reduce the risk of electric shock or fire hazard during the period of an output short-circuit. Providing an automatic
circuit-breaker at the output, rated the same as the output circuit, or current limiting, at the same rating, is considered sufficient to meet this
requirement.
Method:
1. Identify the different insulation point that needs to be considered while measuring working voltage.
2. Measure working voltages at that point and note down peak and R.M.S voltage across the points.
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
Diameter or minor dimension D (mm); test
mass (g)
Radius of curvature of cord 1.5 D (min)
7.1 Enclosure
7.2 Stability
4.1/RD
a)A unit having a mass of 7 kg or more
shall not fall over when tilted to an angle
of 10° from its normal upright position.
b) A floor-standing unit having a mass of
25 kg or more shall not fall over when a
force equal to 20 % of the weight of the
unit, but not more than 250 N, is applied in
any direction except upwards, at a height
not exceeding 2 m from the floor.
Method:
1. Clearance: Shortest distance between two conductive parts or between a conductive part and the bounding surface of equipment, measured
through air..
2. Creepage: Shortest distance between two conductive parts or between a conductive part and the bounding surface of equipment, measured
along the surface of the insulation.
3. Measure clearance and Creepage across insulation using Vernier caliper or feeler gauge measuring Instrument.
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 25 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Basic / supplementary:
Reinforced:
Supplementary information:
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
7.3 Mechanical strength
4.2/RD
4.2.1/RD General
Swing test
7.4.1 Introduction
4.3.1/RD Edges and corners
4.3.2/RD Handles and manual controls;
force (N)
4.3.3/RD Adjustable controls
4.3.4/RD Securing of parts
4.3.5/RD Connections by Plugs and
Sockets
4.3.7/RD Heating elements in earthed
equipment
4.3.11/RD Containers for liquids or gases
4.4/RD Protection against hazardous
moving parts
4.4.2/RD Protection in operator access
areas
4.4.3/RD Protection in restricted access
locations
4.4.4/RD Protection in service access
areas
4.5/RD Thermal Requirements
4.5.2/RD Temperature tests under normal
load condition as per Cl.1.4.5
4.5.3/RD Temperature limits for materials
4.5.4/RD Touch temperature limits
4.5.5/RD Resistance to abnormal heat
7.4.2 Openings
7.4.3 Gas concentration
7.4.4 Equipment movement
7.5 Resistance to fire
4.7/RD
Method:
1. If weight of equipment under test is 7kg or more then place the equipment to the centre of 10° inclining plane
2. If the mass of equipment is 25Kg or more and if it is floor-standing equipment then force equal to 20% of its total mass (but less than 250N)
is applied in any direction from the floor height less than 2m is applied to the equipment.
3. For a floor standing equipment downward force of 800N is applied from the floor height of 1m applied to the point of maximum movement to
any horizontal surface of at least 125mm x 200mm.
Note:
1. While applying the force to the floor standing equipment by keeping doors, drawers etc., which may be moved for servicing by operator and
service person, are place in their unfavorable position.
2. While applying the force 800N downward then doors and drawers etc. remain closed at this time.
3. Its used to improve the stability when drawers, doors, etc are opened and it shall be automatic in operation when associated with operator use,
if not automatic suitable and conspicuous markings shall be provided to caution service persons.
4. During the test containers shall contain the amount of substance within their rated capacity producing the most disadvantageous condition
5. Castors used in the normal operation of the unit, shall be in their most unfavourable position
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 27 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
o Physically
mass (but less than 250N) is applied
Unstable
o Physically Stable
Floor standing equipment downward force of 800N is
o Physically
applied from the floor height of 1m with test tool
Unstable
7.3 Mechanical Test (Steady force test) N/A Pass Fail Date:
Test Requirement:
During the test Equipment does not evident of damage to finish, cracks, dents and chips or in means which affect the safety functioning of
equipment.
Method:
1. Apply steady force of 10N ±1N to the components and parts other than parts serving as an enclosure.
2. Apply steady state force of 30N±3N by means of unjoint test finger to the part on or within the equipment which one parts of an enclosure
located in an operator access area, which is protected by cover door for period of 5sec.
3. Apply the steady force of 250N±10N for the period of 5s to the top, bottom and sides of enclosure fitted with equipment by mean of force
applying tool providing contact of circular plane of 30mm in diameter.
Note:
Steady force of 250N±10N test not applied to bottom of enclosure of equipment having mass of 18kg or more.
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
4.7.1/RD Reducing the risk of ignition and spread of
flame
Method 1, selection and application of
components wiring and materials
4.7.3/RD Materials
4.7.3.1/RD General
Method:
1. Identify the openings side of enclosure.
2. Openings located behind the doors, panels, covers etc. that can be opened or removed by operated not considered.
3. Side of fire enclosure and bottom of fire enclosure also considered.
4.
Note:
1. Portion of side of fire enclosure it complies if one of following requirement satisfied
Openings that do not exceeds 5 mm in any dimensions
Openings that do not exceeds 1 mm in width regardless of length.
Top openings in which vertical entry is prevented
Side openings provided with louvres that are shaped to deflect outwards an external vertically falling object
Top or side openings, that are not located vertically, or within a volume V bounded by a 5° vertical projection up to the size of
openings L, above bare conductive parts:
At Hazardous Voltages or
That presents an energy hazard.
2. Openings vertically above bare parts at hazardous voltages in the top of a fire enclosure or an electrical enclosure shall not exceed 5mm in
any dimension unless the construction prevents vertical access to such parts and this requirement does not apply to equipment having
openings in the top to enclosure with a height exceeding 1,8m.
Equipment used for test Equipment id:
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 29 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Supplementary information:
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
c) Materials for components that fill an
opening in a FIRE ENCLOSURE, and that
are intended to be mounted in this
opening shall : be of V-1 CLASS
MATERIAL; or pass the tests of Clause
A.2; or comply with the flammability
requirements of the relevant IEC
component standard
a) Materials shall be of :
− HB75 CLASS MATERIAL if the
thinnest significant thickness of this
material is < 3 mm,
or
− HB40 CLASS MATERIAL if the
thinnest significant thickness of this
material is ≥ 3 mm,
or
− HBF CLASS FOAMED
MATERIAL.
Supplementary information:
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 31 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
a) High-voltage components operating at
peak-to-peak voltages exceeding 4 kV shall
either be of V-2 CLASS MATERIAL, or
HF-2 CLASS FOAMED MATERIAL, or
comply with 14.4 of IEC 60065 or pass the
needle flame test according to IEC 60695-
11-5.
Clause 8 - Conditioning
7.6.3 Distance
7.6.4 Case insulation
7.6.5 Wiring
7.6.6 Electrolyte spillage
7.6.7 Ventilation
7.6.8 Charging voltage
7 Temperature rise Cl. 7.7 of IS 16242(Part-1):2014
4.5/RD Thermal Requirements
4.5.2/RD Temperature tests under normal load
condition as per Cl.1.4.5
4.5.3/RD Temperature limits for materials
4.5.4/RD Touch temperature limits
4.5.5/RD Resistance to abnormal heat
General requirements and simulated abnormal conditions Cl. 8 of IS 16242(Part-1):2014
8.1 General provision for earth leakage
5.1.1/RD General
5.1.7/RD Equipment with touch current exceeding
3,5 mA
5.1.7.2/R Simultaneous multiple connections to the
D supply
8.2 Electric strength
5.2/RD
5.2.1/RD General
5.2.2/RD Test procedure
8.1 General provision for earth leakage N/A Pass Fail Date:
Test Requirement:
After test measured value of Touch current should not exceeds the limits as specified in Table 5A/RD
Method:
1. Tests are conducted using one of the measuring instruments in Annex D. i.e. D1 Network
2. Terminal B of the measuring instrument is connected to earthed(neutral) conductor of the supply
3. Terminal A of the measuring instrument is connected to
Protective earthing connection or functional earthing connection of EUT via measurement switch with earthing switch is open
Unearthed or non-conductive accessible part of EUT via measurement switch with earthing switch is close.
4. For single-phase equipment, the tests are repeated in reverse polarity
5. For three-phase equipment, the tests are repeated in reverse polarity unless the equipment is sensitive to phase sequence.
6. Either r.m.s value of the voltage, U2 is measured using the measuring instrument D1 network or the r.m.s value of the current is measured
using the measuring instrument of D 2 network.
7. Touch current (A) = U2 /500
8. Systems of interconnected equipment with individual connections to the a.c mains supply shall have each piece of equipment tested
separately.
9. Systems of interconnected equipment with one common connection to the a.c mains supply shall be treated as a single piece of equipment.
10. If the earth leakage current exceeds 3.5mA, the requirements of 5.1.7/RD apply.
Note:
1. For an accessible non-conductive part, the test is made of metal foil having dimensions of 100mm x 200mm in contact with the part.
2. Accessible conductive parts that are incidentally connected to other parts are tested both as connected and disconnected parts.
3. Value of touch current shall not exceed the limits given Table 5A/RD.
4. Equipment designed for connection to multiple main supplies, only one of which is required at a time shall be tested with only one mains
supply connected.
5. Equipment requiring power simultaneously from two or more mains supplies shall be tested with all mains supplies connected.
Equipment used for test Equipment id:
8.1 TABLE: General provisions for earth leakage current
Test voltage (V)........................................: AC :
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 33 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Supplementary information
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
8.2 a) The test voltages for electric strength for
the appropriate grade of insulation
[FUNCTIONAL INSULATION if required
by 5.3.4 b), BASIC INSULATION,
SUPPLEMENTARY INSULATION or
REINFORCED INSULATION]
are as specified in either:
− Table 5B using the PEAK WORKING
VOLTAGE (U), as determined in 2.10.2; or
− Table 5C using the REQUIRED
WITHSTAND VOLTAGE, as determined
in G.4.
Abnormal operation and fault conditions Cl. 8.3 of IS 16242(Part-1):2014
8.3.1 General
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 35 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Method:
1. When we are doing single fault , the single fault consist of single failure of any insulation(excluding double insulation or reinforced
insulation ).
2. Single fault consists of Short circuit of elements, motor stalling, transformer fault, ventilation blockage.
Note:
1. Where it is required to apply simulated faults or abnormal operating conditions, these shall be applied in turn and one at a time.
2. When applying simulated fault or abnormal fault , abnormal operating conditions, parts, supplies consumable materials , media and
recording material shall be in place if they are likely to have an effect on the outcome of the rest.
3. For the components and circuits other than those covered by IS 13252, compliance is checked by simulating the following conditions,
Faults in any components in primary circuits.
Faults in any components where failure could adversely affect supplementary insulation or reinforced insulation.
For the equipment that does not comply with the requirements of 4.7.1/RD and 4.7.2/RD, faults in all components.
faults arising from connection of the most unfavorable load impedance to terminals and connectors that deliver power or signal
outputs from the equipment, other than main power outlets.
4. A ups having ventilation shall be operated in the normal mode with the rotor of a blower motor or fan locked and if the UPS having more
than one blower motor or fan, lock one at a time.
5. The test are applied one at a time with the equipment operating at rated voltage or at the upper limit of the rated voltage range.
6. Temperature in the transformer supplying the component under the test shall not exceed those specified in Annex C/RD.
Supplementary information:
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
6.2.2.2/RD Steady-state test
6.2.2.3/RD Compliance criteria
6.3/RD Protection of the
telecommunication wiring
system from overheating
Max. output current (A)
3.5/RD Interconnection of equipment
3.5.1/RD General requirements
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 37 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
M.3.1/R Ringing signal
D
M.3.1.1/ Frequency (Hz)
RD
M.3.1.2/ Voltage (V)
RD
M.3.1.3 Cadence; time (s), voltage (V)
/RD
M.3.1.4 Single fault current (mA)
/RD
M.3.2/R Tripping device and monitoring
D voltage
M.3.2.1/ Conditions for use of a tripping
RD device or a monitoring voltage
M.3.2.2/ Tripping device
RD
M.3.2.3/ Monitoring voltage (V)
RD
A/RD Annex A, Tests for resistance
to heat and fire
A.1/RD Flammability test for fire
enclosures of movable
equipment having a total mass
exceeding 18 kg, and of
stationary equipment (see
4.7.3.2/RD)
A.1.1/RD Samples
Wall thickness (mm)
A.1.2/RD Conditioning of samples;
temperature (C)
A.1.3/RD Mounting of samples
A.1.4/RD Test flame (see IEC 60695-11-
3)
Flame A, B, C or D
A.1.5/RD Test procedure
A.1.6/RD Compliance criteria
Sample 1 burning time (s)
Sample 2 burning time (s)
Sample 3 burning time (s)
A.2/RD Flammability test for fire
enclosures of movable
equipment having a total mass
not exceeding 18 kg, and for
material and components
located inside fire enclosures
(see 4.7.3.2/RD and
4.7.3.4/RD)
A.2.1/RD Samples, material
Wall thickness (mm)
A.2.2/RD Conditioning of samples;
temperature (°C)
A.2.3/RD Mounting of samples
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 39 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
A.2.4/RD Test flame (see IEC 60695-11-
4)
Flame A, B or C
A.2.5/RD Test procedure
A.2.6/R Compliance criteria
D
Sample 1 burning time (s)
Sample 2 burning time (s)
Sample 3 burning time (s)
Tested by: Checked by:
Revision: 1.10 Date: March 12, 2019 Page 40 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SCL/QF/43
SKC COMPLIANCE LAB PVT. LTD. OBSERVATION SHEET TESTING
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 41 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
B.8/RD Test for motors with capacitors
B.9/RD Test for three-phase motors
B.10/RD Test for series motors
Operating voltage (V)
C/RD Annex C, Transformers (see
1.5.4/RD and 5.3.3/RD)
Position
Manufacturer
Type
Rated values
Method of protection
C.1/RD Overload test
C.2/RD Insulation
Protection from displacement of
windings
D/RD Annex D, Measuring
instruments for touch current
tests (see 5.1.4/RD)
D.1/RD Measuring instrument
D.2/RD Alternative measuring
instrument
E/RD Annex E, Temperature rise of a
winding (see 1.4.13/RD)
F/RD Annex F, Measurements of
clearances and creepage
distance (see 2.10/RD and
Annex G/RD)
G/RD Annex G, Alternative method
for determining minimum
clearances
G.1/RD Clearances
G.1.1/RD General
G.1.2/RD Summary of the procedure for
determining minimum
clearances
G.2/RD Determination of mains
transient voltage (V)
G.2.1/RD AC mains supply
G.2.2/RD Earthed d.c. mains supplies
G.2.3/RD Unearthed d.c. mains supplies
G.2.4/RD Battery operation
G.3/RD Determination of
telecommunication network
transient voltage (V)
G.4/RD Determination of required
withstand voltage (V)
G.4.1/RD Mains transients and internal
repetitive peaks
G.4.2/RD Transients from
telecommunication networks
G.4.3/RD Combination of transients
G.4.4/RD Transients from cable
distribution systems
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 43 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048
SKC COMPLIANCE LAB PVT. LTD. SCL/F&F/004
FORMAT NO.: QF-35 OBSERVATION SHEET TESTING
Sl. Test Details and Clause reference of IS Observations Inst. Used Date Sign
No. Specification I.D. No.
G.5/RD Measurement of transient
voltages (V)
a) Transients from a mains
supply
For an a.c. mains supply
For a d.c. mains supply
b) Transients from a
telecommunication network
G.6/RD Determination of minimum
clearances
H Annex H, Guidance on
protection against ingress of
water and foreign objects
(see IEC 60529)
Backfeed protection test Annex I of IS 16242(Part-1):2014
I.1 General
5.3.7/RD Simulation of faults
I.2 Test for pluggable UPS
I.3 Test for permanently connected
UPS
I.4 Load-induced change of
reference potential
I.5 Solid-state backfeed protection
(see clause 7.1-7.5 of IEC
62040-2 and clause 7.1-7.2 of
IEC 62040-3)
J/RD Annex J, Table of
electrochemical potentials (see
2.6.5.6/RD)
Metal(s) used
K/RD Annex K, Thermal controls (see
1.5.3/RD and 5.3.8/RD)
K.1/RD Making and breaking capacity
K.2 /RD Thermostat reliability; operating
voltage (V)
K.3/RD Thermostat endurance test;
operating voltage (V)
K.4/RD Temperature limiter endurance;
operating voltage (V)
K.5/RD Thermal cut-out reliability
K.6/RD Stability of operation
Reference load Annex L of IS 16242(Part-1):2014
L.1 General
L.2 Reference resistive load
L.3 Reference inductive-resistive
load
L.4 Reference capacitive-resistive
loads
L.5 Reference non-linear load
L.5.1 General
L.5.2 Test method
L.5.3 Connection of the non-linear
reference load
Ventilation of battery compartments IS 16242(Part-1):2014
M.1 General
M.2 Normal conditions
M.3 Blocked conditions
M.4 Overcharge conditions
Tested by Checked by
Revision: 1.10 Date: February 24, 2020 Page 45 of 45
SKC COMPLAINCE LAB PVT. LTD. Copyright Protected
Sp-9, NGEF Industrial Estate, Mahadevapura, Bangalore-560048