Professional Documents
Culture Documents
Mathematical Problem - Winding
Mathematical Problem - Winding
1. The winding drum of a high speed cone winder having a diameter of 3 " makes 2870 r.p.m.
The actual amount of yarn wound in 9 hrs was found to be 332,838 yds. What is the efficiency?
3
Calculated production in 9 hrs = 2870 60 9
36
= 405,400 yds.
Actual production
Efficiency = 100%
Calculated production
332,838
= 100% = 82%
405,900
2. Calculate the efficiency of a modern high speed cone winding machine if its actual production
per 8 hrs is found to be 384 hanks. The rate of winding (calculated) is 800 yds per min.
3. The calculated rate of winding based on actual measurement of a modern high speed fully
automatic pirn winder is 552 yds per min. If the production per day of 8 hrs per spindle is 14
lbs of 20’S yarn. Calculate efficiency.