Proposed Building Minor Repair & Repainting Mrs. Susan Balderas Bill of Materials & Cost Estimates
Proposed Building Minor Repair & Repainting Mrs. Susan Balderas Bill of Materials & Cost Estimates
3 CONCRETE WORKS
Portland Cement 10 bags 220.00 P 2,200.00
Fine Sand 0.5 cu.m 950.00 P 475.00
Water proffing compund 5 bag 450.00 P 2,250.00
Material Cost P 4,925.00
Labor Cost P 1,970.00
sub-total P 6,895.00
5 CEILING REPLACEMENT
Spanded metal cladding 35 lm 340.00 P 11,900.00
Metal parring (framing) 54 pcs 120.00 P 6,480.00
blind revits 2 box 350.00 P 700.00
moulding 8 lm 180.00 P 1,440.00
Material Cost P 20,520.00
Labor Cost P 7,182.00
sub-total P 27,702.00