8.

LUCRARI DE CONSOLIDARE
8. CONSOLIDATION WORKS
PLAN DE TRASARE FUNDATII RIGOLA RANFORSATA TIP I
FOUNDATION PLAN OF REINFORCED GUTTER TYPE I
Km 41+455 - Km 41+540 stg./left;L=85m

58
59 Ax proiectat
60 Designed centre line
61

5.25
5.25
4 3 2 1
12 11 10 9 T3 T2 T1
18 16 15 14 13 T5 T4 34 35 36
17 T9 28 T8 T7 30 T6 31 33
T13 T11 26 T10 27 29
T16 T15 T14 23 24 T12 25
T17 20 21 22 5.00 5.00 5.00
19 5.00 5.00 5.00
5.00 5.00 5.00 5.00
5.00 5.00 5.00 5.00
5.00 5.00 5.00

TABEL DE COORDONATE FUNDATII


TABEL OF FOUNDATION COORDINATES

X (E-V) Y (N-S) X (E-V) Y (N-S)


1 322716.3 522390 19 322634.9 522365.5 Nr bare Lung. unei Lungimea in metri Nr bare Lung. unei Lungimea in metri
Nr bare Lung. unei Lungimea in metri Length in meters
20 322639.7 522366.9 Marca Diametrul asemenea bare Length in meters
2 322711.5 522388.6
Marca Diametrul asemenea bare Length in meters Marca Diametrul asemenea bare
3 322706.7 522387.2 21 322644.5 522368.3 Mark Diameter No. of bars Length of a OB37 PC52 Mark Diameter No. of bars Length of a OB37 PC52
Mark Diameter No. of bars Length of a OB37 PC52
4 322701.9 522385.9 22 322649.3 522369.7 alike bar 8 10 alike bar 8 10
alike bar 8 10
5 322697 522384.5 23 322654.1 522371 1 10 156 3.70 - 578 1 10 104 3.45 - 359
1 10 182 3.70 - 674
6 322692.2 522383.1 24 322658.9 522372.4 2 10 182 2.25 - 410
2 10 156 2.20 - 344 2 10 104 2.20 - 229
7 322687.4 522381.7 25 322663.7 522373.8 3 10 156 2.95 - 461 3 10 104 2.95 - 307
3 10 182 2.95 - 537
8 322682.6 522380.4 26 322668.5 522375.2 4 8 144 5.15 742 - 4 8 78 5.15 402 -
4 8 158 5.15 814 -
Lungime totala pe diametre (m) Lungime totala pe diametre (m)
9 322677.8 522379 27 322673.3 522376.6 Lungime totala pe diametre (m) 814 1621 Total lengths by diameters (m) 742 1383 402 895
Total lengths by diameters (m) Total lengths by diameters (m)
10 322673 522377.6 28 322678.1 522377.9 Masa pe metru (Kg/m)
Masa pe metru (Kg/m) Masa pe metru (Kg/m)
11 322668.2 522376.2 29 322682.9 522379.3 Weight (Kg/m) 0.395 0.617 Weight (Kg/m) 0.395 0.617
Weight (Kg/m) 0.395 0.617
12 322663.4 522374.9 30 322687.7 522380.7 Masa pe diametre (Kg) Masa pe diametre (Kg)
Masa pe diametre (Kg) Weight by diameter (Kg) 294 854 Weight by diameter (Kg) 159 553
13 322658.6 522373.5 31 322692.5 522382.1 Weight by diameter (Kg) 322 1001
Masa totala (Kg) Masa totala (Kg)
14 322653.8 522372.1 32 322697.4 522383.4 Masa totala (Kg) Total weight (Kg) 1148 712
Total weight (Kg) 1323 Total weight (Kg)
15 322649 522370.7 33 322702.2 522384.8
16 322644.2 522369.4 34 322707 522386.2
17 322639.4 522368 35 322711.8 522387.6
18 322634.6 522366.6 36 322716.6 522388.9

CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza

PTh+
COMPANIA NA IONAL DE
AUTOSTR ZI I DRUMURI NA IONALE
DE
DIN ROM NIA
TP+
REABILITARE DN76 CONTRACT 5R10/b
WD
DEVA - ORADEA km 35+432 - km 55+425
km 0+000 - 184+390 BRAD - IONESTI
Nr. contract : 92/59388/07.dec.2010
Director proiect Ing. Angelo Perrone Plan de trasare fundatii rigola
ranforsata
Proiectat Ing. Adrian Diaconu
Foundation plan of reinforced gutter
Verificat Ing. Valentin Giurca
Martie 2011 Scale 1:200 Dw. CO 23
TABEL DE COORDONATE FUNDATII PENTRU PARTEA DREAPTA
PLAN DE TRASARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI TABEL OF FOUNDATION COORDINATES FOR RIGHT SIDE
FOUNDATION PLAN OF REINFORCEMENT GUTTER AT THE EDGE OF CARRIAGEWAY X (E-V) Y (N-S) Z X (E-V) Y (N-S) Z
1 316348.4405 523886.4693 300.322 32 316331.763 523897.584 300.311
km.48+410.00 - km.48+540.00 (Dreapta/Right) 2 316344.0847 523888.8675 300.282 33 316327.383 523900.029 300.290
3 316339.7073 523891.2838 300.241 34 316323.0398 523902.4732 300.269
km.48+420.00 - km.48+540.00 (Stanga/Left) 4 316335.3289 523893.706 300.201 35 316318.6909 523904.9404 300.247
5 316330.956 523896.1382 300.161 36 316314.342 523907.4075 300.231
Sc.1:200
6 316326.5755 523898.5902 300.140 37 316310.0016 523909.8897 300.214
7 316322.2202 523901.0461 300.119 38 316305.6669 523912.3818 300.198
8 316317.875 523903.5023 300.097 39 316301.338 523914.8839 300.181
Decantoare 9 316313.5262 523905.9773 300.081 40 316297.0148 523917.396 300.163
10 316309.1808 523908.4583 300.064 41 316292.6975 523919.918 300.146
11 316304.8438 523910.954 300.048 42 316288.3859 523922.4499 300.128
12 316300.5128 523913.4601 300.031 43 316284.0802 523924.9917 300.114

Km. 48+505

Km. 48+530
Km. 48+495
13 316296.1842 523915.9703 300.013 44 316279.7804 523927.5434 300.092

Km. - 48+540
Km. 48+465
Km. 48+450
Km. 48+420
14 316291.8658 523918.4979 299.996 45 316275.4864 523930.105 300.053
PODET CADRE PREFABRICATE 15 316287.5499 523921.03 299.978 46 316271.2013 523932.6814 300.015
TIP C2' L=2,00m 16 316283.2414 523923.5745 299.964 47 316266.9162 523935.2578 299.976
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 17 316278.9386 523926.1286 299.942 48 316262.64 523937.849 299.975
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 PRECAST FRAME TYPE C2'

44
43

45

46

47
18 316274.6395 523928.689 299.903 49 316258.3698 523940.45 299.971

48
42

49
41
40

50
39
38
CULVERT L=2,00m

36

37
32

34
33
31

35
28
26

29

30
27
19 316270.3504 523931.2661 299.965 50 316254.1056 523943.0608 299.967

1.65

1.65
T17 T18 T19 T20 T21 T22 T23 T24 T25 T26

1.65
T15 T16

21
20

22

23

24
18
20 316266.0628 523933.8458 299.826 51 316249.8474 523945.6814 299.963

1.65
1.65
T5 T14

15
T6 T13

14
T3 T4 T7 T8 T9 T10 T11 T12

13
12
11

25
21 316261.7833 523936.4388 299.825 52 316245.5952 523948.3119 299.959

17

19
16
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
5.00 5.00

10
5.00 22 316257.511 523939.0437 299.821 53 316241.3521 523950.9569 299.955

6
1

7
5.00

2
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

6.50
6.50
23 316253.2443 523941.6577 299.817 54 316237.1152 523953.6117 299.951

6.50

4.85
4.85
7.10
24 316248.981 523944.2772 299.813

7.78

4.85
5.45
25 316244.7267 523946.9115 299.809

6.13
Ax proiectat 26 316240.4762 523949.5518 299.805
Ax proiectat 27 316236.233 523952.2038 299.801
Designed centre line Designed centre line
28 316349.2381 523887.9137 300.472

348
347
346
345
29 316344.8823 523890.3119 300.432

344

4.85
30 316340.5053 523892.7289 300.391

4.85
6.50
4.85
343

6.50
31 316336.1289 523895.1469 300.351

4.85

6.50
342

5.00 5.00 5.00 5.00 5.00 5.00 5.00


4.85

5.00

6.50
5.00 5.00 5.00 5.00 5.00
5.00 5.00
5.00 TABEL DE COORDONATE FUNDATII PENTRU PARTEA STANGA
6.49

5.00 5.00

24
22
19

23
21

26
25
20

27
5.00

18
17
16
4.99

1.65

1.65
15
14
5.00

1.65
13
5.00 T19 T21 T22 T23 T24 T25 T26

12
T20

1.65
5.00 TABEL OF FOUNDATION COORDINATES FOR LEFT SIDE

11
T15 T16 T17 T18

50
10

47

51

52
49

53
48
5.00 T14

45

46

54
44
9

1.65
T13

43
4.99 T12

42
8
T10 T11

41
4.97

40
7
T9

39
6

38
T8 5.00
5

5.00 5.00

37
T6 T7 5.00 5.00 5.00 5.00 5.00 5.00
1.65

5.00

36
4

T5 5.00 5.00 5.00

35
5.00
3

34
5.00 X (E-V) Y (N-S) Z X (E-V) Y (N-S) Z

Km. - 48+540
5.00
1

T4 33
2

5.00

Km. 48+505
32

T3 5.00

Km. 48+520
Km. 48+490
1.65

5.00
31

T2 5.00 1 316333.7943 523881.5621 300.097 28 316324.4078 523885.3847 300.193


30

T1

Km. 48+465
5.00
29

5.00 5.00 2 316329.5322 523884.1763 300.07 29 316320.1452 523887.9983 300.167

Km. 48+445
5.00
28

5.00 5.00
Km. 48+430

Decantoare 3 316325.2701 523886.7906 300.043 30 316315.8831 523890.6125 300.138


Km. 48+410

4 316321.0079 523889.4048 300.017 31 316311.621 523893.2268 300.111


5 316316.7458 523892.019 299.988 32 316307.3588 523895.841 300.090
6 316312.4837 523894.6333 299.961 33 316303.0967 523898.4552 300.073
7 316308.2215 523897.2475 299.940 34 316298.8346 523901.0695 300.056
8 316303.9594 523899.8618 299.923 35 316294.5724 523903.6837 300.040
9 316299.6973 523902.476 299.906 36 316285.9749 523906.2674 300.024
10 316295.4351 523905.0902 299.890 37 316292.6975 523908.7897 300.009
11 316291.1228 523907.693 299.874 38 316281.6635 523911.322 299.995
12 316286.8118 523910.2184 299.859 39 316277.358 523913.864 299.981
13 316282.5008 523912.7437 299.845 40 316273.0582 523916.416 299.967
14 316278.1985 523915.2839 299.831 41 316268.7643 523918.9777 299.939
15 316273.902 523917.8339 299.817 42 316264.4763 523921.5493 299.892
16 316269.6113 523920.3937 299.789 43 316260.1972 523924.1355 299.847
17 316265.3266 523922.9633 299.742 44 316255.9227 523926.7294 299.831
18 316261.0477 523925.5427 299.697 45 316251.6477 523929.3227 299.814
19 316256.7747 523928.1319 299.681 46 316247.3834 523932.0055 299.798 CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza
20 316252.5076 523930.7309 299.664 47 316243.1251 523934.5538 299.781
21 316248.2465 523933.3396 299.648 48 316238.8727 523937.1839 299.765
22 316243.9914 523935.958 299.631 49 316234.6264 523939.8238 299.749 PTh+
COMPANIA NA IONAL DE
DE
23 316239.7423 523938.5862 299.605 50 316230.3862 523942.4733 299.732 AUTOSTR ZI I DRUMURI NA IONALE
DIN ROM NIA
TP+
24 316235.4992 523941.224 299.599 REABILITARE DN76 CONTRACT 5R10/b
WD
25 316231.2621 523943.8716 299.582 DEVA - ORADEA km 35+432 - km 55+425
km 0+000 - 184+390 BRAD - IONESTI
26 316332.9316 523880.1556 300.247 Nr. contract : 92/59388/07.dec.2010
27 316328.6695 523882.7698 300.220 PLAN DE TRASARE RIGOLA RANFORSATA
Director proiect Ing. Angelo Perrone
CAROSABILA LA MARGINEA PLATFORMEI
Proiectat Ing. Adrian Diaconu FOUNDATION PLAN OF REINFORCEMENT
Verificat Ing. Valentin Giurca GUTTER AT THE EDGE OF CARRIAGEWAY
Martie 2011 Scale 1:200 Dw. CO 25
ELEVATIE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI (DREAPTA)
ELEVATION OF REINFORCEMENT GUTTER AT THE EDGE OF CARRIAGEWAY (RIGHT)
Km. 48+410.00- Km. 48+540.00 ; L=130 m
ELEVATIE - ELEVATION
Scara/Scale 1:200

26 x 5 m = 130 m

Km 48+410.00

Ax podet Km 48+540.00
4 X 5 m =20 m 3 x 5 m = 15 m 2 x 5 m = 10 m 2 x 5 m =10 m 5x 5 m = 25 m 3x 5 m = 15 m 7 x 5 m = 35 m
Tip III - III Type Tip III - III Type Tip III - III Type Tip III - III Type Tip III - III Type Tip III - III Type Tip III - III Type
Parapet metalic Parapet metalic Parapet metalic Parapet metalic
Metallic guardrail Metallic guardrail Metallic guardrail Metallic guardrail

Culvert axis
3% T1 3% 3% T2 3% 3% T3 3% 3% T4 3% 3% T5 3% 3% T6 3% 3% T7 3% 3% T8 3% 3% T9 3% 3% T10 3% 3% 3% 3% T12 3% 3% T13 3% 3% 3% 3% T15 3% 3% T16 3% 3% T17 3% 3% T18 3% 3% 3% 3% 3% 3% T21 3% 3%
T11 T14 T19 T20 T22 3% 3% T23 3% 3% T24 3% 3% T25 3% T26 3%
3%

299.00
Profil (m) 342 343 344 345 346 347 348
Profile (m)
Lungimi tronsoane(ext)
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
Unit lengths(ext)
Pozitie kilometrica (km.)
Chainage (km.) 48+407.84 48+428.92 48+447.33 48+468.27 48+492.88 48+504.56 48+541.11
Cota coronament 1 (m) 302.817 302.79 302.76 302.732 302.704 302.669 302.635 302.601 302.577 302.553 302.529 302.504 302.482 302.46 302.442 302.316 302.394 302.38 302.375 302.369 302.364 302.358 302.353 302.347 302.342 302.335 302.33
Head wall level 1 (m)
Cota coronament 2 (m) 301.572 301.532 301.492 301.451 301.411 301.383 301.356 301.328 301.352 301.376 301.4 301.424 301.417 301.411 301.405 301.399 301.392 301.419 301.445 301.472 301.378 301.285 301.192 301.099 301.007 300.914 300.821
Head wall level 2 (m)
Cota fund rigola (m)
Gutter level (m) 300.972 300.932 300.891 300.851 300.811 300.79 300.769 300.747 300.731 300.714 300.698 300.681 300.663 300.646 300.628 300.614 300.592 300.553 300.515 300.476 300.475 300.471 300.467 300.463 300.459 300.455 300.451
Cota inferioara fundatie -fata (m) 300.472 300.432 300.391 300.351 300.311 300.29 300.269 300.247 300.231 300.214 300.198 300.181 300.163 300.146 300.128 300.114 300.092 300.053 300.015 299.976 299.975 299.971 299.967 299.963 299.959 299.955 299.951
Foundation base level -front (m)
Cota inferioara fundatie -spate (m)
300.322 300.282 300.241 300.201 300.161 300.14 300.119 300.097 300.081 300.064 300.048 300.031 300.013 299.996 299.978 299.964 299.942 299.903 299.865 299.826 299.825 299.821 299.817 299.813 299.809 299.805 299.801
Foundation base level -rear (m)

ELEVATIE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI (STANGA)


ELEVATION OF REINFORCEMENT GUTTER AT THE EDGE OF CARRIAGEWAY (LEFT)
Km. 48+410.00- Km. 48+540.00 ; L=120 m
ELEVATIE - ELEVATION
Scara/Scale 1:200
24 x 5 m =120 m
Km 48+410.00

Km 48+540.00
6 x 5 m = 30 m 3 x 5 m =15 m 6 x 5 m =30 m 2 x 5 m = 10 m 7 x 5 m = 35 m
Tip III - III Type Tip III - III Type Tip III - III Type Tip III - III Type Tip III - III Type
Parapet metalic Parapet metalic Parapet metalic Parapet metalic Parapet metalic
Metallic guardrail Metallic guardrail Metallic guardrail Metallic guardrail Metallic guardrail

Culvert axis
Ax podet
3% T1 3% 3% T2 3% 3% T3 3% 3% T4 3% 3% T5 3% 3% T6 3% 3% T7 3% 3% T18 3% 3% T9 3% 3% T10 3% 3% T11 3% 3% T12 3% 3% T13 3% 3% T14 3% 3% T15 3% 3% T16 3% 3% T18 3%
T17 3% 3% 3% T19 3% 3% T20 3% 3% T21 3% 3% T22 T23 T24 3%
3% 3% 3% 3%

299.00
Profil (m) 343 344 345 346 347 348
Profile (m)
Lungimi tronsoane(ext)
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
Unit lengths(ext) CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza
Pozitie kilometrica (km.)
Chainage (km.) 48+428.92 48+447.33 48+468.27 48+492.88 48+504.56 48+541.11
Cota coronament 1 (m) PTh+
302.747 302.714 302.682 302.649 302.616 302.584 302.555 302.528 302.502 302.476 302.453 302.437 302.421 302.404 302.388 302.377 302.373 302.368 302.361 302.354 302.348 302.341 302.334 302.327 302.32 DE
Head wall level 1 (m) COMPANIA NA IONAL DE
AUTOSTR ZI I DRUMURI NA IONALE

Cota coronament 2 (m)


DIN ROM NIA
TP+
301.328 301.311 301.295 301.279 301.262 301.246 301.276 301.345 301.414 301.483 301.518 301.488 301.457 301.427 301.396 301.324 301.196 301.073 301.004 300.936 300.867 300.799 300.731 300.662 300.594 REABILITARE DN76 CONTRACT 5R10/b
WD
Head wall level 2 (m) DEVA - ORADEA km 35+432 - km 55+425
Cota fund rigola (m) km 0+000 - 184+390 BRAD - IONESTI
Gutter level (m) 300.747 300.72 300.693 300.667 300.638 300.611 300.59 300.573 300.556 300.54 300.524 300.509 300.495 300.481 300.467 300.439 300.392 300.347 300.331 300.314 300.298 300.281 300.265 300.249 300.232
Nr. contract : 92/59388/07.dec.2010
ELEVATIE RIGOLA RANFORSATA
Cota inferioara fundatie -fata (m) 300.247 300.22 300.193 300.167 300.138 300.111 300.09 300.073 300.056 300.04 300.024 300.009 299.995 299.981 299.967 299.939 299.892 299.847 299.831 299.814 299.798 299.781 299.765 299.749 299.732 Director proiect Ing. Angelo Perrone CAROSABILA LA MARGINEA PLATFORMEI
Foundation base level -front (m) Proiectat Ing. Adrian Diaconu
ELEVATION OF REINFORCEMENT
Cota inferioara fundatie -spate (m) GUTTER AT THE EDGE OF CARRIAGEWAY
300.097 300.07 300.043 300.017 299.988 299.961 299.94 299.923 299.906 299.89 299.874 299.859 299.845 299.831 299.817 299.789 299.742 299.697 299.681 299.664 299.648 299.631 299.615 299.599 299.582 Verificat Ing. Valentin Giurca
Foundation base level -rear (m) Scale 1:200 Dw. CO 40
Martie 2011
PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 40+410.00 - Km 40+430.00 ; L=20.00 m (Dreapta / Right)
VEDERE/VIEW B-B A
Km 48+410.00

Km 48+430.00
Scara 1:50 EXTRAS ARMATURA / REBAR QUANTITIES
20.00 Lungimea in metri
5.00 5.00 5.00 5.00 Nr. bare Lungimea Length in meters
Marca Diametrul
asemenea unei bare
SECTIUNE/SECTION A-A Mark No.of bars Length of OB37 PC52
Scara 1:50
B 15
Diameter
alike bar 8 10 12
302.817 25 20 20 20 20 20 8 1 2 20 20 20 20 20 25 24 20 20 20 20 8 1 2 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 24 25 20 20 20 20 20 20 20 20 25

30
8 1 2 8 1 2 302.704 1 10 100 2.95 - 295 -
23 2 8 100 1.95 195 - -

8 8 8 8
8 8 8 8
23 23 23 23 23

1 1 40 3 8 100 4.60 460 - -


1

24 24 24 24 24
5

100
1.25 - 1.29
2

87
5 5 1 4 10 100 2.85 - 285 -
5
5 5 8 100 1.60 160 - -

1.85 - 1.89
5
5 7 23 6 12 100 2.50 - 250

241
1.85

4 7 8 100 0.55 55.00

8
8
1.89
10

179
8 8 152 5.05 767.60

8
8
235
75 Lungime totala pe diametre (m)

10
1637.6 580 250

8
8
Total length by diameters (m)
15

60
83
12 27 22 23

3 Masa pe metru (Kg/m)

8 8 8
8 8 8
13 27 23 23
5

15
0.395 0.888 1.21

124
Weight (Kg/m)

91
4 Masa pe diametre (Kg)

50
65

65
5 Weight by diameter (Kg) 646.85 515.04 302.5

65
83

8
8
Masa totala pe tip de otel (Kg)
6 Total weight by steel type (Kg) 647 817.54
300.322 8 8 8 8 8 8 8 8 3 7 OB37 8
3 4 3 4 A 3 4 3 4 300.161 8 8 8 8 8 8 8 8
B 4buc./mp L=0.55 Masa totala (Kg)
Total weight (Kg) 1465
489 489 489 489 1.60 40
8 8 8 8 5 OB37 8/20 L=1.60
149

35
48
149

6 PC52 12/20 L=2.50

PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 40+430.00- Km 40+445.00 ; L=15.00 m (Dreapta / Right)
VEDERE/VIEW B'-B'
Km 48+430.00

Km 48+445.00
Scara 1:50
A'
15.00
EXTRAS ARMATURA / REBAR QUANTITIES
5.00 5.00 5.00 SECTIUNE/SECTION A'-A' Lungimea in metri
Scara 1:50
B' Marca Diametrul
Nr. bare Lungimea Length in meters
302.704 25 20 20 20 20 20 8 1 2 20 20 20 20 20 20 25 25 20 20 20 20 20 1 2 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 25 15 asemenea unei bare
1 2 302.601 Mark Diameter No.of bars Length of OB37 PC52
23 alike bar 8 10 12

8 8
8 8
40
24 24 24 24 24

100 98
1 1 1 240

24 24 23 24 24
10 75 3.20 - -

1.27 - 1.29
1 2 2 8 75 2.95 221.25 - -

87
8 8
8 8
3 8 75 4.55 341.25 - -

1.89 - 1.85
240
7 23 4 10 75 2.85 - 213.75 -
1.89

5 5 5

1.85
4 5 8 75 1.60 195 - -

88 8 8 8
88 8 8 8

180
236
10

6 12 75 2.50 - 187.5

10
75 7 8 75 0.55 41.25

58 - 60
8 8 114 5.05 575.7
15

5 83
13 26 23 22

5 5 3 4

12 26 22 21
Lungime totala pe diametre (m)

15
1374.45 453.75 187.5
Total length by diameters (m)

8
8
Masa pe metru (Kg/m)

91
50
0.395 0.888 1.21
65

65
Weight (Kg/m)

8
8
65
5
83 Masa pe diametre (Kg)
Weight by diameter (Kg) 542.90 402.93 226.87
6 3 7 OB37 8
300.161 300.097 8 8 8 8 8 8 8 8
3 4 3 4 3 4 8 8 8 8 8 8 8 8 B' 4buc./mp L=0.55 Masa totala pe tip de otel (Kg)
542.90 629.8
CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza
Total weight by steel type (Kg)
489 489 489 1.60 40 Masa totala (Kg) PTh+
8 8 8 Total weight (Kg) 1175 COMPANIA NA IONAL DE
DE
AUTOSTR ZI I DRUMURI NA IONALE
DIN ROM NIA
5 TP+
OB37 8/20 L=1.60 REABILITARE DN76 CONTRACT 5R10/b
WD
A' 149
DEVA - ORADEA
km 0+000 - 184+390
km 35+432 - km 55+425
BRAD - IONESTI
Nr. contract : 92/59388/07.dec.2010

35
48
Director proiect Ing. Angelo Perrone Plan cofraj si armare rigola ranforsata
149
Shuttering and reinforcement plan of
Proiectat Ing. Adrian Diaconu reinforced gutter
6 PC52 12/20 L=2.50 Verificat Ing. Valentin Giurca
Martie 2011 Scale 1:50 Dw. CO 42
PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 48+445.00 - Km 48+465.00 ; L= 20.00 m; (Dreapta / Right )
VEDERE/VIEW B-B A EXTRAS ARMATURA / REBAR QUANTITIES

Km 48+465.00
Km 48+445.00
Scara 1:50
Nr. bare Lungimea Lungimea in metri
20.00 Length in meters
Marca Diametrul
5.00 5.00 5.00 5.00
SECTIUNE/SECTION A-A Mark
asemenea
No.of bars
Diameter
unei bare
Length of OB37 PC52
25 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 20 25 Scara 1:50 alike bar 8 10 12
1 2 8 8 1 2 8 1 2 8 1 2
B 15
1 10 100 2.90 - 290 -
302.601
302.504 23 2 8 100 1.80 180 - -

102 85

114 98
3 8 100 4.70 470 - -

8 8 8 8
8 8 8 8
23 24 23 23 24

1 1 1 5 40 4 10 100 3.05 - 305 -

20 20 20 20 20

1.08 -1.27
5 5 1 2 5 8 100 1.60 160 - -
5 5 5 23 6 12 100 2.50 - - 250

1.83 - 1.85

177 180
236
4 7 8 100 0.55 55.00 - -
7
1.85

1.83
8 8 152 5.05 767.60 - -

8
8
5 5

10
75 Lungime totala pe diametre (m)

233
10

8
8
1632.6 595 250
Total length by diameters (m)

58 - 74
8
8
Masa pe metru (Kg/m)

13 27 30 30
15
83
13 27 22 22
15

3 Weight (Kg/m) 0.395 0.888 1.21

8 8 8
8 8 8

89 106
Masa pe diametre (Kg)
4 Weight by diameter (Kg) 644.877 528.36 302.5

50
65

65
65
5 Masa totala pe tip de otel (Kg)
83

8
8
Total weight by steel type (Kg) 644.87 830.86
3
6 Masa totala (Kg)
300.097
3 4 3 4 3 4 A 3 4 300.031 8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8 Total weight (Kg) 1480
B 7 OB37 8
489 489 489 489 4buc./mp L=0.55
1.60
8 8 8 8 40

5 OB37 8/20 L=1.60


149

35
48
149

6 PC52 12/20 L=2.50

PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 48+465.00 - Km 48+490.00 ; L= 25.00 m; (Dreapta / Right )
Km 48+465.00

VEDERE/VIEW B'-B' A'

Km 48+490.00
Scara 1:50 EXTRAS ARMATURA / REBAR QUANTITIES
25.00 SECTIUNE/SECTION A'-A' 15
5.00 5.00 5.00 5.00 5.00 Nr. bare Lungimea Lungimea in metri
Scara 1:50
B' 23 Marca Diametrul asemenea unei bare
Length in meters

114 120
102 107
302.504 25 20 20 20 8 1 2 20 20 20 25 25 20 20 20 20 8 1 2 20 20 20 20 25 25 20 20 20 20 1 2 8 1 2 20 20 20 20 25 25 20 20 20 20 20 8 1 2 20 20 20 20 25 Mark Diameter No.of bars Length of OB37 PC52
302.394 bar 8 10 12
alike

8 8 8 8
8 8 8 8
19 20 20 20 20

40 1 10 125 2.90 - 362.5 -

18 18 18 18 19

1.00 - 1.08
1 1 2 2 8 125 1.90 237.5 - -
1 1 1 23
3 8 125 4.90 612.5 - -

1.80 - 1.82
7 4 4 10 125 3.05 - 381.25 -

233

175 177
1.82

10
5 5 5 5 5 8 125 1.60 200 - -

1.80
10

8
8
75 6 12 125 2.50 - 312.5

231

8
8
7 8 125 0.55 68.75

74 - 80
83
15
13 27 30 30

8 8 190 5.05 959.5

15

138 144
32
5 5 5 5

8
8
3 Lungime totala pe diametre (m)

8 8 8
8 8 8
2078.25 743.75 312.5

13 27 33
Total length by diameters (m)
4 Masa pe metru (Kg/m)

50
0.395 0.888 1.21
65

65
5 Weight (Kg/m)

65
83 Masa pe diametre (Kg)

8
8
Weight by diameter (Kg) 820.90 660.45 378.12
A' 8 8 8 8 8 8 8 8 6 3
300.031 CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza
3 4 3 4 3 4 3 4 3 4 299.942 8 8 8 8 8 8 8 8 Masa totala pe tip de otel (Kg)
B' Total weight by steel type (Kg) 820.90 1038.57
489 489 489 489 489 1.60 Masa totala (Kg) PTh+
8 8 8 8 8 Total weight (Kg) 1860 COMPANIA NA IONAL DE
AUTOSTR ZI I DRUMURI NA IONALE DE
DIN ROM NIA
7 OB37 8 TP+
5 OB37 8/20 L=1.60 4buc./mp L=0.55
REABILITARE DN76 CONTRACT 5R10/b
WD
DEVA - ORADEA km 35+432 - km 55+425
149 km 0+000 - 184+390 BRAD - IONESTI
40 Nr. contract : 92/59388/07.dec.2010

35
Director proiect Ing. Angelo Perrone Plan cofraj si armare rigola ranforsata

48
149 Shuttering and reinforcement plan of
Proiectat Ing. Adrian Diaconu reinforced gutter
PC52 12/20 L=2.50 Verificat Ing. Valentin Giurca
6
Martie 2011 Scale 1:50 Dw. CO 43
PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 40+520.00 - Km 40+535.00 ; L=15.00 m (Dreapta / Right)
VEDERE/VIEW B-B EXTRAS ARMATURA / REBAR QUANTITIES
Km 48+520.00 Scara 1:50 A Nr. bare Lungimea Lungimea in metri

Km 48+535.00
Marca Diametrul asemenea unei bare Length in meters
15.00 OB37 PC52
5.00 5.00 5.00
SECTIUNE/SECTION A-A 15 Mark Diameter No.of bars Length of
alike bar 8 10 12
25 20 20 20 20 8 1 2 20 20 20 20 20 20 24 24 20 20 20 20 20 20 8 1 2 20 20 20 20 20 20 24 25 20 20 20 20 20 8 1 2 20 20 20 20 20 20 25
Scara 1:50 B 23 1 10 75 2.95 - 221.25 -

100 113
302.353 302.335 2 8 75 2.00 150 - -

73 86
3 8 75 4.70 352.5 - -

8 8 8 8
8 8 8 8
13 27 29 29 151021 21 21 21 22

40 2 4 10 2.85 - 213.75 -

12 27 161615 26 27 27 27 27
75

1.16 - 1.42
1 23 5 8 75 1.60 120 - -
6 12 75 2.50 - - 187.5

1.88 - 1.89
4 41.25

239
7 7 8 75 0.55 - -

184 183
1.89

1.88
8 8 114 5.05 575.7 - -

8 8 8 8
8 8 8 8
Lungime totala pe diametre (m)

240
75 1239.45 435 187.5
Total length by diameters (m)

45 - 72
10
83 Masa pe metru (Kg/m)
4 0.395 0.888 1.21

136 109

104 77
Weight (Kg/m)

8
8
3 Masa pe diametre (Kg)

8
8
Weight by diameter (Kg) 489.58 386.28 226.87

50
65

65
65

8 8
8 8
5 Masa totala pe tip de otel (Kg)
83 489.58 613.15
Total weight by steel type (Kg)
3 Masa totala (Kg)
8 8 8 8 8 8 8 8 6
299.817 299.805 8 8 8 8 8 8 8 8 Total weight (Kg) 1105
3 4 3 4 3 4
A B
489 489 489 1.60 7 OB37 8
4buc./mp L=0.55
8 8 8
5 OB37 8/20 L=1.60 40
149

35
48
149

6 PC52 12/20 L=2.50

PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 40+535.00 - Km 40+540.00 ; L=5.00 m (Dreapta / Right)
VEDERE/VIEW B'-B'
Scara 1:50 A'
Km 48+540.00
Km 48+535.00

5.00
SECTIUNE/SECTION A'-A'
25 20 20 20 20 20 20 20 20 25 B' EXTRAS ARMATURA / REBAR QUANTITIES
302.335 8 1 2 302.33 Scara 1:50 Lungimea in metri
15 Nr. bare Lungimea
Marca Diametrul Length in meters
asemenea unei bare
OB37 PC52

8
8
40 23
10 26 27 27 27 27

Mark Length of
28 28 28 28 29

No.of bars
Diameter

64 76

77 86
bar 8 10 12
8
8
alike
2

1.51 - 1.42
1 1 10 25 2.70 - 67.5 -

183
8 23
8 2 8 25 1.75 43.75 - -
1.88

1.88

1.88

7 4 3 8 25 4.50 112.5 - -
8
8

4 10 25 2.40 - 60 -
239

8
8

5 8 25 1.60 40 - -
10

6 12 25 2.50 - 62.5
8 88 8
8 88 8
15

75 13.75
7 8 25 0.55
11 27 22 15

45
37
12 27 31

83 8 8 34 5.05 171.7

100 109
3

68 77
Lungime totala pe diametre (m)
4 381.7 127.5 62.5

50
65

65

65

Total length by diameters (m)


8 8
8 8

5
Masa pe metru (Kg/m)
Weight (Kg/m) 0.395 0.888 1.21
6 B' 83
299.805
3 4 A' 299.801 8 8 8 8 8 8 8 8 3 Masa pe diametre (Kg)
150.77 113.22 63.71
CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza
8 8 8 8 8 8 8 8 Weight by diameter (Kg)
489 1.60 Masa totala pe tip de otel (Kg)
150.77 176.93 PTh+
8 Total weight by steel type (Kg) COMPANIA NA IONAL DE
DE
AUTOSTR ZI I DRUMURI NA IONALE
Masa totala (Kg) DIN ROM NIA
TP+
5 OB37 8/20 L=1.60 7 OB37 8 Total weight (Kg) 330 REABILITARE DN76 CONTRACT 5R10/b
WD
DEVA - ORADEA
4buc./mp L=0.55 km 35+432 - km 55+425
149 km 0+000 - 184+390 BRAD - IONESTI

40 Nr. contract : 92/59388/07.dec.2010


35

Plan cofraj si armare rigola ranforsata


48

Director proiect Ing. Angelo Perrone


149 Shuttering and reinforcement plan of
Proiectat Ing. Adrian Diaconu reinforced gutter
6 PC52 12/20 L=2.50 Verificat Ing. Valentin Giurca
Martie 2011 Scale 1:50 Dw. CO 45
PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 48+420.00 - Km 48+450.00 ; L=30.00 m (Stanga / Left)
VEDERE/VIEW B-B
Scara 1:50
Km 48+420.00 A
SECTIUNE/SECTION A-A

Km 48+450.00
30.00
5.00 5.00 5.00 5.00 5.00 5.00
EXTRAS ARMATURA / REBAR QUANTITIES
Scara 1:50 15 Lungimea in metri
B Nr. bare Lungimea

30
25 20 20 20 20 20 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 20 20 20 20 25 Length in meters
302.747 8 1 2 8 1 2 8 1 2 8 1 2 8 1 2 8 1 2 Marca Diametrul asemenea unei bare
23 OB37 PC52
Mark Length of

96 - 109
302.555 Diameter No.of bars

85 - 98
alike bar 8 10 12

8
8
13 27 22 22 10 26 26 26 26 27

40 1 2 1 10 150 3.05 - 457.5 -

8
8
13 27 27 27 10 24 24 24 24 24
2 8 150 2.05 307.5 - -

142 - 172
23

8
8
3 8 150 4.75 712.5 - -

1.96 - 2.00
4

251 247
4 10 150 2.95 - 442.5 -

8
8
7
2.00

5 8 150 1.60 240 - -

1.96

8 8 8 8 8 8
8 8 8 8 8 8
6 12 150 2.50 - 375

194
7 8 150 0.55 82.5
75
15

3 8 8 5.05 1151.4

58 - 68
228
83 Lungime totala pe diametre (m)

15
2493.9 900 250

133 - 122

89 - 100
4 Total length by diameters (m)
Masa pe metru (Kg/m)
0.395 0.888 1.21

50
Weight (Kg/m)

63
65

8 8
8 8
5

0.65
83 Masa pe diametre (Kg)
Weight by diameter (Kg) 985.09 799.2 453.75
8 88 8 8 8 8 8 6 3
300.097
3 4 3 4 3 4 3 4 3 4 3 4 299.94
8 88 8 8 8 8 8 B Masa totala pe tip de otel (Kg)
985.09 1252.95
Total weight by steel type (Kg)
489 489 489 489 489 489 1.60 Masa totala (Kg)
8 8 8 8 8 8 Total weight (Kg) 2240
5 OB37 8/20 L=1.60
A 7 OB37 8
149 4buc./mp L=0.55

35
40

48
149

6 PC52 12/20 L=2.50

PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 48+450.00 - Km 48+465.00 ; L=15.00 m (Stanga / Left)
VEDERE/VIEW B'-B'
A' Scara 1:50
EXTRAS ARMATURA / REBAR QUANTITIES
Km 48+450.00

Km 48+465.00
15.00 15
SECTIUNE A'-A' Lungimea in metri
5.00 5.00 5.00 23 Nr. bare Lungimea
Scara 1:50 Marca Diametrul Length in meters
asemenea unei bare
302.555
25 20 20 20 20 20
1 2 8
20 20 20 25 25 20 20 20 20 20
1 2 8
20 20 20 20 25 25 20 20 20 20 20
1 2 8
20 20 20 25 B' Mark Diameter No.of bars Length of OB37 PC52

109 134
302.476 bar

96 121
alike 8 10 12
1 10 75 3.00 - 255 -
13 27 18 181815 24 24 24 24 24

8 888 8 8 8 8 8
8 888 8 8 8 8 8
1818181818
40 2
2 8 75 2.05 153.75 - -

99 - 1.27
23 3 8 75 5.15 386.25 - -
1
7 4 10 75 3.30 - 247.5 -
4

1.94 - 1.96
5 8 75 1.60 120 - -

244
10
1.96

1.94
75
6 12 75 2.50 - 187.5
41.25

191
7 8 75 0.55

247
83

68 - 94
15
636.3

13 27 28 26 25
8 8 126 5.05
10

Lungime totala pe diametre (m)

100 126
1337.55 502.5 187.5
3 Total length by diameters (m)

8
8
4
Masa pe metru (Kg/m)

8
8
Weight (Kg/m) 0.395 0.888 1.21

50
65

8
8
65

65
Masa pe diametre (Kg)
5 528.33 446.22 226.87
83 Weight by diameter (Kg)

8
8
6 Masa totala pe tip de otel (Kg)
299.94 8 8 8 8 8 8 8 8 3 528.33 673.09 CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si
3 4 A' 3 4 3 4 299.89
8 8 8 8 8 8 8 8 Total weight by steel type (Kg)
BENEFICIAR Faza
Masa totala (Kg)
1.60 B' Total weight (Kg) 1205 PTh+
COMPANIA NA IONAL DE
AUTOSTR ZI I DRUMURI NA IONALE
DE
5 OB37 8/20 L=1.60 7 OB37 8
DIN ROM NIA
TP+
REABILITARE DN76 CONTRACT 5R10/b
4buc./mp L=0.55 WD
149 DEVA - ORADEA km 35+432 - km 55+425
km 0+000 - 184+390 BRAD - IONESTI
40

35
Nr. contract : 92/59388/07.dec.2010

48
149 Director proiect Ing. Angelo Perrone
Plan cofraj si armare rigola ranforsata
Shuttering and reinforcement plan of
PC52 12/20 L=2.50 Proiectat Ing. Adrian Diaconu reinforced gutter
6
Verificat Ing. Valentin Giurca
Martie 2011 Scale 1:50 Dw. CO 46
PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 48+465.00 - Km 48+495.00 ; L=30.00 m (Stanga / Left)
VEDERE/VIEW B-B
Scara 1:50 EXTRAS ARMATURA / REBAR QUANTITIES
Km 48+465.00

Km 48+495.00
15

30
30.00
23 Nr. bare Lungimea Lungimea in metri
5.00 500 5.00 5.00 5.00 5.00
SECTIUNE/SECTION A-A B Marca Diametrul asemenea unei bare Length in meters
25 20 20 20 20 20 20 20 20 20 20 20 20 20 20 25 24 20 20 20 20 20 20 20 20 20 20 20 20 24 24 20 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 25 24 20 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 25 Scara 1:50 Mark Diameter No.of bars Length of OB37 PC52
8 1 2 8 1 2 8 1 2 8 1 2 1 2 1 2

121 116

134 129
302.476 8 8 alike bar 8 10 12
302.377
1 10 150 3.00 - 450 -

8 888 8 8 8 88
8 888 8 8 8 88
40
18 18 18 18 18

2 2 8 150 2.05 307.5 - -

19 19 19 19 20

99 - 105
23 3 8 150 5.35 802.5 - -
1 4 10 150 3.50 - 525 -
7 4

193

194 - 193
5 8 150 1.60 240 - -

244
10
1.94

6 12 150 2.50 - 375

10
1.94
75 7 8 150 0.55 82.5

194
245
15

83 8 8 252 5.05 1272.6

94 - 88
13 27 26 26 27

Lungime totala pe diametre (m)

13 27 24 25 25
15
2705.1 975 375

126 120
153
3 Total length by diameters (m)

8
8
4
Masa pe metru (Kg/m)
0.395 0.888 1.21

8
8
Weight (Kg/m)

50
Masa pe diametre (Kg)

8
8
65

65
5

65
Weight by diameter (Kg) 1068.51 865.8 453.75
83

8
8
Masa totala pe tip de otel (Kg)
8 8 8 8 8 8 8 8 6 3 Total weight by steel type (Kg) 1068.51 1319.55
299.89
3 4 3 4 3 4 3 4 3 4 3 4 299.789 8 8 8 8 8 8 8 8
Masa totala (Kg)
489 489 489 489 489 489 1.60 B Total weight (Kg) 2390

8 8 8 8 8 8 OB37 8/20 L=1.60


149 7 OB37 8
4buc./mp L=0.55

35
48
149 40

6 PC52 12/20 L=2.50

PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 48+495.00 - Km 48+505.00 ; L=10.00 m (Stanga / Left)
VEDERE/VIEW B'-B'
Scara 1:50
Km 48+495.00

Km 48+505.00
15
10.00
23
5.00 5.00 SECTIUNE/SECTION A'-A' EXTRAS ARMATURA / REBAR QUANTITIES
B

116 100

129 113
25 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 20 20 25 Scara 1:50 Nr. bare Lungimea Lungimea in metri
302.377 8 1 2 8 1 2 302.368
Marca Diametrul asemenea unei bare Length in meters
Mark Diameter No.of bars Length of OB37 PC52

88 8 8 8 8 8 8
88 8 8 8 8 8 8
19 19 19 19 20

24 24 24 24 24
alike bar 8 10 12
23 1 10 50 3.05 - 152.5 -

1.05
1
7 4 2 8 50 2.05 102.5 - -

197
254
3 8 50 5.10 255 - -
1.93

1.94
15 10

2.02
4 10 50 3.30 - 165 -

10
75

188
5 8 50 1.60 80 - -

244
83 6 12 50 2.50 - 125
13 27 24 25 25

89
7 8 0.55 27.5

8
8
50

153 137

120 104
13 27 19 19 19
15
3 4 8 8 84 5.05 424.2

8
8
Lungime totala pe diametre (m)
889.2 317.5 125

8 8
8 8
Total length by diameters (m)

50
Masa pe metru (Kg/m)
66

65
5

65
83 Weight (Kg/m) 0.395 0.888 1.21

8
8
Masa pe diametre (Kg) CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza
8 88 8 8 8 8 8 6 3 Weight by diameter (Kg) 351.234 281.94 151.25
299.789
3 4 3 4 299.697 8 88 8 8 8 8 8
B Masa totala pe tip de otel (Kg) PTh+
489 489 1.60 Total weight by steel type (Kg) 351.23 433.19 COMPANIA NA IONAL DE
AUTOSTR ZI I DRUMURI NA IONALE DE
8 8 Masa totala (Kg) DIN ROM NIA
TP+
OB37 8/20 L=1.60 Total weight (Kg) 785 REABILITARE DN76 CONTRACT 5R10/b
WD
7 OB37 8 DEVA - ORADEA km 35+432 - km 55+425
149 km 0+000 - 184+390 BRAD - IONESTI
4buc./mp L=0.55
Nr. contract : 92/59388/07.dec.2010

35
40 Plan cofraj si armare rigola ranforsata

48
149 Director proiect Ing. Angelo Perrone
Shuttering and reinforcement plan of
Proiectat Ing. Adrian Diaconu reinforced gutter
6 PC52 12/20 L=2.50 Verificat Ing. Valentin Giurca
Martie 2011 Scale 1:50 Dw. CO 47
PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 48+505.00 - Km 48+530.00 ; L=25.00 m (Stanga / Left)
Km 48+505.00 VEDERE/VIEW B-B A

Km 48+530.00
Scara 1:50
25.00
SECTIUNE/SECTION A-A
5.00 5.00 5.00 5.00 5.00 EXTRAS ARMATURA / REBAR QUANTITIES

30
Scara 1:50 15
302.368
25 20 20 20 20
8 1 2 20 20 20 20 25 25 20 20
8 1 2 20 20 20 20 20 20 25 25 20 20 20
8 1 2
20 20 20 20 20 25 24 20 20
8 1 2
20 20 20 20 25 25 20 20
8 1 2
20 20 20 20 20 25 B 23
Nr. bare Lungimea Lungimea in metri
302.334

113 - 87
100 - 74
Marca Diametrul asemenea unei bare Length in meters
Mark Length of OB37 PC52

8 8 8 8
8 8 8 8
Diameter No.of bars
24 24 24 24 24

40

30 30 30 30 30
1 2 alike bar 8 10 12

1.30 - 1.60
23 1 10 125 3.10 - 387.5 -
2 8 125 2.15 268.75 - -

2.03- 2.06
4

254 258
3 8 125 4.70 587.5 - -

197 202
7
2.02

8
8
2.07
4 10 125 2.85 - 356.25 -
10

5 8 125 1.60 200 - -

8 88 8
8 88 8
75 6 12 125 2.50 - 312.5

10

73 - 46
3 83 7 8 125 0.55 68.75
13 27 29 29
15

8 8 190 5.05 959.5

104 - 78
137 - 111
12 27 1616
Lungime totala pe diametre (m)

15
4 2084.5 743.75 312.5

8
8
Total length by diameters (m)

50
Masa pe metru (Kg/m)

8
8
65

65
5 0.395 0.888 1.21

65
83 Weight (Kg/m)

8
8
Masa pe diametre (Kg)
8 8 8 8 8 8 8 8 6 3 Weight by diameter (Kg) 823.37 660.45 378.12
299.697
3 4 3 4 3 4 3 4 3 4 299.615 8 8 8 8 8 8 8 8
Masa totala pe tip de otel (Kg)
489 489 489 489 489 1.60 B Total weight by steel type (Kg) 823.37 1038.57
Masa totala (Kg)
8 8 8 A 8 8
5 OB37 8/20 L=1.60 Total weight (Kg) 1865
7 OB37 8
149 4buc./mp L=0.55

35
40

48
149

6 PC52 12/20 L=2.50

PLAN COFRAJ SI ARMARE RIGOLA RANFORSATA CAROSABILA LA MARGINEA PLATFORMEI / SHUTTERING AND REINFORCEMENT PLAN OF REINFORCED GUTTER AT THE EDGE OF CARRIAGEWAY
Km 48+530.00 - Km 48+540.00 ; L=10.00 m (Stanga / Left)
VEDERE/VIEW B'-B'
A'
Km 48+530.00

Km 48+540.00
Scara 1:50
10.00
5.00 5.00
SECTIUNE/SECTION A'-A' B' EXTRAS ARMATURA / REBAR QUANTITIES
25 20 20 20 20 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 25
302.334 1 2 8 1 2 8 302.32 Scara 1:50 Lungimea in metri
15 Nr. bare Lungimea
Marca Diametrul asemenea unei bare Length in meters
23 OB37 PC52

8 8
8 8
40 2 Mark Diameter No.of bars Length of
10 30 30 30 30 30

74 63
33

87 76
alike bar 8 10 12
1 10 50 3.15 - 157.5 -

33
1

1.60 - 1.72
8
8
23 2 8 50 2.15 107.5 - -

2.07 - 2.09
33
4 3 8 50 4.35 217.5 - -

8
8
260
2.07

2.09
7 4 10 50 2.50 - 125 -

33

8
8
5 8 50 1.60 80 - -

201
258
6 12 50 2.50 - 125

33
10

8 88 8
8 88 8
75 7 8 50 0.55 27.5
3
4 8 8 68 5.05 343.4

47
36
15

83
13 27 32

15
Lungime totala pe diametre (m)

13 27 21

78 67
775.9 282.5 125
Total length by diameters (m)
Masa pe metru (Kg/m)

50
5
65

8
8
65

65
Weight (Kg/m) 0.395 0.888 1.21
83

8
8
6 Masa pe diametre (Kg)
Weight by diameter (Kg) 306.48 250.86 151.25 CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza
299.615 299.582 8 8 8 8 8 8 8 8 3
3 4 3 4 8 8 8 8 8 8 8 8
Masa totala pe tip de otel (Kg)
489 489
1.60
B' Total weight by steel type (Kg) 306.48 402.11 PTh+
COMPANIA NA IONAL DE
8 8 Masa totala (Kg) AUTOSTR ZI I DRUMURI NA IONALE DE
5 OB37 8/20 L=1.60 Total weight (Kg) 710 DIN ROM NIA
TP+
A' REABILITARE DN76
DEVA - ORADEA
CONTRACT 5R10/b
WD
149 7 OB37 8 km 0+000 - 184+390
km 35+432 - km 55+425
BRAD - IONESTI
4buc./mp L=0.55 Nr. contract : 92/59388/07.dec.2010

35
48
149 Director proiect Ing. Angelo Perrone Plan cofraj si armare rigola ranforsata
40 Shuttering and reinforcement plan of
Proiectat Ing. Adrian Diaconu reinforced gutter
6 PC52 12/20 L=2.50 Verificat Ing. Valentin Giurca
Martie 2011 Scale 1:50 Dw. CO 48
CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza

PTh+
COMPANIA NA IONAL DE
AUTOSTR ZI I DRUMURI NA IONALE
DE
DIN ROM NIA
TP+
REABILITARE DN76 CONTRACT 5R10/b
WD
DEVA - ORADEA km 35+432 - km 55+425
km 0+000 - 184+390 BRAD - IONESTI
Nr. contract : 92/59388/07.dec.2010
Plan cofraj si armare
Director proiect Ing. Angelo Perrone camera de cadere dreapta
Reinforcement and shuttering plan
Proiectat Ing. Adrian Diaconu
for falling chamber right side
Verificat Ing. Valentin Giurca Km 45+859.49
Martie 2011 Scale 1:100 Dw. CO 49
CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza

PTh+
COMPANIA NA IONAL DE
AUTOSTR ZI I DRUMURI NA IONALE
DE
DIN ROM NIA
TP+
REABILITARE DN76 CONTRACT 5R10/b
WD
DEVA - ORADEA km 35+432 - km 55+425
km 0+000 - 184+390 BRAD - IONESTI
Nr. contract : 92/59388/07.dec.2010
Plan cofraj si armare
Director proiect Ing. Angelo Perrone camera de cadere dreapta
Reinforcement and shuttering plan
Proiectat Ing. Adrian Diaconu
for falling chamber right side
Verificat Ing. Valentin Giurca Km 45+987.15
Martie 2011 Scale 1:100 Dw. CO 50
CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza

PTh+
COMPANIA NA IONAL DE
AUTOSTR ZI I DRUMURI NA IONALE
DE
DIN ROM NIA
TP+
REABILITARE DN76 CONTRACT 5R10/b
WD
DEVA - ORADEA km 35+432 - km 55+425
km 0+000 - 184+390 BRAD - IONESTI
Nr. contract : 92/59388/07.dec.2010
Plan cofraj si armare
Director proiect Ing. Angelo Perrone camera de cadere dreapta
Reinforcement and shuttering plan
Proiectat Ing. Adrian Diaconu
for falling chamber right side
Verificat Ing. Valentin Giurca Km 46+082.35
Martie 2011 Scale 1:100 Dw. CO 51
CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza

PTh+
COMPANIA NA IONAL DE
AUTOSTR ZI I DRUMURI NA IONALE
DE
DIN ROM NIA
TP+
REABILITARE DN76 CONTRACT 5R10/b
WD
DEVA - ORADEA km 35+432 - km 55+425
km 0+000 - 184+390 BRAD - IONESTI
Nr. contract : 92/59388/07.dec.2010
Plan cofraj si armare
Director proiect Ing. Angelo Perrone camera de cadere dreapta
Reinforcement and shuttering plan
Proiectat Ing. Adrian Diaconu
for falling chamber right side
Verificat Ing. Valentin Giurca Km 46+300.18
Martie 2011 Scale 1:100 Dw. CO 52
PLAN DE TRASARE FUNDATII RIGOLA RANFORSATA TIP I
FOUNDATION PLAN OF REINFORCED GUTTER TYPE I

TABEL DE COORDONATE FUNDATII-stg. TABEL DE COORDONATE FUNDATII-stg.


8.35
TABEL OF FOUNDATION COORDINATES-left TABEL OF FOUNDATION COORDINATES-left
643 642 641 638
640 Ax proiectat 639 X (E-V) Y (N-S) X (E-V) Y (N-S)

Km. 55+008.35
1 312280.9 528257.6 1 312278.5 528279.6
Designed centre line

Km. 54+982.57
2 312281.3 528262.6 2 312278.6 528284.6

Km. 54+975.38

Km. 54+960.47
3 312280.5 528267.6 3 312278.6 528289.6

5.25
4 312279.7 528272.5 4 312278.7 528294.6

5.25
5 312278.6 528272.3 5 312275.3 528298.3
5.00 6 312279.4 528267.4 6 312271.9 528302
4 5.00 7 312280.2 528262.6 7 312271.1 528301.3
3 5.00 2
00 3 8 312279.8 528257.7 8 312274.5 528297.6

1.10
T3 2
5. 9
1 4
T2 T1
1
9 312277.6 528294.2
10 T2 7

1.10
11 T1 T3 6
5 10 312277.5 528289.6
T4 12
8
5
6 2
00 8 4.
Pod peste paraul Ociu 5.
Bridge over Ociu stream T5
L=10.70m;Km 55+018 6
0 0
5.
10
1. 7
Sant pereat
Paved ditch
TABEL ARMATURI LUNGIMI VARIABILE PLAN ARMARE PENTRU RIGOLA RANFORSATA TIP I
REINFORCEMENT PLAN FOR REINFORCED GUTTER TYPE I
EXTRAS DE ARMARE PENTRU TRONSONUL T3
REINFORCING LIST ON VARIABLE LENGHT REBAR QUANTITIES FOR UNIT T3
Scara / Scale 1:50 Pentru 1 tronson / For 1 unit Pentru 1 tronson / For 1 unit Pentru 1 tronson / For 1 unit Pentru 1 tronson / For 1 unit
Marca /Mark 1 Marca /Mark 2 Nr bare Lung. unei Lungimea in metri Nr bare Lung. unei Lungimea in metri
Tronson Nr bare Lung. unei Lungimea in metri Nr bare Lung. unei Lungimea in metri
d1(cm) L 1med (m) d2(cm) L 2med (m) Marca Diametrul asemenea bare Length in meters
Marca Diametrul asemenea bare Length in meters Marca Diametrul asemenea bare Length in meters
Marca Diametrul asemenea bare Length in meters
Mark Diameter No. of bars OB37 PC52 Mark Diameter No. of bars OB37 PC52 Mark Diameter No. of bars Length of a OB37 PC52 Mark Diameter No. of bars Length of a OB37 PC52
4.40 2.30 Length of a Length of a
alike bar alike bar alike bar 8 10 alike bar 8 10
T3 4.30 2.35 1 8 10 8 10
1 10 26 4.40 * - 114.4 1 10 26 4.30 * - 111.8 1 10 26 4.30 * - 111.8 1 10 26 4.30 * - 111.8
2 10 26 2.30 * - 59.8 2 10 26 2.35 * - 61.1 2 10 26 2.75 * - 71.5 2 10 26 2.70 * - 70.2
3 10 26 2.95 - 76.7 3 10 26 2.95 - 76.7 3 10 26 2.95 - 76.7 3 10 26 2.95 - 76.7
NOTA/NOTE: 2 4 8 18 5.15 92.7 - 4 8 18 5.15 92.7 - 4 8 18 5.15 92.7 - 4 8 18 5.15 92.7 -
Lungime totala pe diametre (m) Lungime totala pe diametre (m) Lungime totala pe diametre (m) Lungime totala pe diametre (m)
) lungime medie / average lenght 92.7 250.9 92.7 249.6 Total lengths by diameters (m) 92.7 260 Total lengths by diameters (m) 92.7 258.7
Total lengths by diameters (m) Total lengths by diameters (m)
) nr. mediu de bare marca 4/ average number of rebars mark 4 Masa pe metru (Kg/m) Masa pe metru (Kg/m) Masa pe metru (Kg/m)
0.395 0.617
Masa pe metru (Kg/m)
0.395 0.617
4 Weight (Kg/m) 0.395 0.617 Weight (Kg/m) 0.395 0.617 Weight (Kg/m) Weight (Kg/m)
Masa pe diametre (Kg) Masa pe diametre (Kg) Masa pe diametre (Kg) Masa pe diametre (Kg)
Weight by diameter (Kg) 37 155 Weight by diameter (Kg) 37 154 Weight by diameter (Kg) 37 161 Weight by diameter (Kg) 37 160
TABEL ARMATURI LUNGIMI VARIABILE Masa totala (Kg) Masa totala (Kg) Masa totala (Kg)
198
Masa totala (Kg)
197
15 Total weight (Kg) 192 Total weight (Kg) 191 Total weight (Kg) Total weight (Kg)
40
REINFORCING LIST ON VARIABLE LENGHT 3 Pentru 2 tronsoane / For 2 units Pentru 1 tronson / For 1 unit Pentru 3 tronsoane / For 3 units Pentru 2 tronsoane / For 2 units

Marca /Mark 1 Marca /Mark 2 OB37 = 74 kg OB37 = 37 kg OB37 = 111 kg OB37 = 74 kg


Tronson PC52 = 310 kg PC52 = 154 kg PC52 = 483 kg PC52 = 320 kg
d1(cm) L 1med (m) d2(cm) L 2med (m)
2.75 CONSULTANT Asocierea INOCSA INGENIERIA, S.L. si BENEFICIAR Faza
490
2.70 100
L=2.95 PTh+
COMPANIA NA IONAL DE
AUTOSTR ZI I DRUMURI NA IONALE
DE
DIN ROM NIA
TP+
REABILITARE DN76 CONTRACT 5R10/b
WD
DEVA - ORADEA km 35+432 - km 55+425
km 0+000 - 184+390 BRAD - IONESTI
Nr. contract : 92/59388/07.dec.2010
Director proiect Ing. Angelo Perrone Plan de trasare rigole ranforsate
Foundation plan of reinforced
Proiectat Ing. Adrian Diaconu
gutter
Verificat Ing. Valentin Giurca
Martie 2011 Scale 1:200/ 1:50 Dw. CO 55