Professional Documents
Culture Documents
South Jebel Exploratory Wells Conclusion and Testing Summary: Well UUUU1-6
South Jebel Exploratory Wells Conclusion and Testing Summary: Well UUUU1-6
● Well UUUU1-6:
The exploratory well UUUU1-6 was spud on 29.12.2006 and drilled to a total depth of
7,923ft. A 9 5/8” casing was set at 6310ftKB and cemented to surface. Due to the
Waha formation wet “100% water” the well was completed in Gialo formation.
Gialo “A”: In order to evaluated Gialo “A” separately, Gialo “C” was isolated and
perforation in Gialo “A” using 4 ½” casing gun through interval at 2397’-2407’KB.
Again the well couldn’t flow with out enhancement of N2 lifting. The flow is descried in
“Table I”.
Gialo “C”: Was initially perforated with 4 ½” casing gun at interval 2676’-2690KB.
Due to low formation pressure, CT was run lifting the well with nitrogen. Flow descried
is as tabulated below “ Table I”
TESTING SUMMARY:
“Formation Wet”
Flow test
Gialo “A” 2397’-2407’KB 100% water, salinity
Using Nitrogen
10,000PPM
Flow test
using nitrogen
“Formation Oil” It is expected
50% water cut that Gialo “C”
Gialo “C” 2676’-2690’KB
Salinity; 10,000PPM will produced oil
Estimated rate; 200 bbl/d at high water cut.
The exploratory well UUUU2-6 was spud on 18.09.08 and drilled to a total depth of
3000ft. A 7” casing was set at 2995ft and cemented to surface. On 28.11.2008, the
workover rig “Adowc 5” moved and rig up on location to evaluate Gialo formation, run
final completion.
Gialo “C”:
The Gialo “C” was perforated with 4 5/8” casing gun, HMX Deep Penetration at 2750-
2768ftKB. on 05.12.2008.
On 06.12.2008, run with temporary completion. Injectivity was tested at 0 BPM at
different pressure 500, 600, 800& 1000 psi.
To remove any near wellbore damage and improve well productivity, an acid
stimulation was conducted on 06.12.2008 using 2000 gals with 15% HCL. Injectivity
was increased to 1.5 BPM at 595psi.
Swabbing was commenced on 07.12.2008, and continues for four days light with total
fluid recovered of 40bbl with 60% oil and 40% water, total salinity was 16,500PPM.
However, the results from the initial immeasurable flow and low bottom hole pressure
indicated a weak influx from the formation. Table II lustrates the flow type.
TESTING SUMMARY:
Swabbing Result:
“Formation Oil”
Recovered 60% oil with
well 30-40% water cut
Gialo “C” 2750’-2768’KB Estimated rate; 40% water.
200 bbl/d Salinity=16,000 PPM
Gialo “C”: Was initially perforated with 4 ½” casing gun at interval 2086’-2102’&
2106’-2118’KB. Due to unsufficient formation pressure ESP was run and used to
conduct DST. More perforation were added into the upper part of Gialo “C” and flow
tested utilizing ESP. The table III lustrates the each interval in Gialo “C” flow.
TESTING SUMMARY:
“Formation Wet”
1768’-1778’ & 100% water, DST
Gialo “A” 1782’-1794’KB salinity 10,000PPM (ESP)
“Formation Oil”
2086’-2102’&
50% water cut DST
2106’-2118’KB
Salinity ; 10,000PPM (ESP)
2086’-2102’
“Formation Wet”
2106’-2118’&
85% water cut, Flow test
Gialo “C” 2067’-2082’ ,
Salinity; 10,000PPM (ESP)
2022’-2029’KB
Estimated rate; 100-200 bbl/d
“Formation Oil”
2022’-2032’&
30-40% water cut, Swabbing
2075’-2090’KB
Salinity;10,000-18,000PPM.
The well was spud on 27-10-2009. The total depth of 7992’ KB (driller depth) was
reached on 06-01-09. The top of Waha formation was encountered at 7842’KB; the
interval 7842’-7854’KB was perforated in the Waha formation with SDP 4 1/2” casing
gun at (5+1) SPF.
To repair the collapsed casing 9 5/8” @ 2845’KB, it was decided to tieback the 7” liner
to surface.
Following acid stimulation and clean up, the well flowed 100% oil with 170 psi on 32/64”
choke. Unfortunately, after run final completion well couldn’t flow naturally due to
formation damage and well was stimulated with 15% HCL.
Based on nitrogen lifting results after acid, it is estimated that the subject well is
capable to produce +/- 600 BFPD from Waha formation using artificial lift “Jet Pump
(JP)”.
TESTING SUMMARY:
Flow test
using nitrogen
It is expected
“Formation Oil”
5590’-5602’ low rate.
NIL water cut
Harash 5612’-5626’ ( it is in future
Salinity; 10,000PPM
KB hydraulic frac.
Estimated rate; 250 bbl/d
plan)