Schedule No 1 Plant Including Mandatory
Schedule No 1 Plant Including Mandatory
Schedule No 1 Plant Including Mandatory
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
Schedule No. 1 : Plant (including Mandatory Spare Parts) Supplied from abroad
A POWER TRANSFORMER
A1. POWER TRANSFORMER
a) 160MVA , 220/132 KV, 3-phase Autotransformer (Excluding insulating oil) Nos. 2
b) Insulating oil for 160MVA , 220/132 KV, 3-phase Autotransformers (* 1Lot Lot* 2
= Oil for 1Autotransformers )
c) OLTC ( MR Germany or Equivalent) 2 set
SUB TOTAL - A [A1]
C1. Mandatory Spare List for 160 MVA 220/132KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
Page 1 of 34
Schedule-1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste Set 1
of each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 10
requirement
k) 6000 LPH Oil filteration unit 1 set
SUB TOTAL - C[C1]
b) Insulating oil for 100MVA , 220/132 KV, 3-phase Autotransformers (* 1Lot Lot* 2
= Oil for 1 Autotransformers )
c) OLTC ( MR Germany or Equivalent) 2 set
d) 10MVA , 132/11 KV, 3-phase Power Transformer (Excluding insulating oil) Nos. 2
e) Insulating oil for 10MVA , 132/11 KV, 3-phase Power Transformers(* 1Lot Lot* 2
= Oil for 1Autotransformers )
f) OLTC ( MR Germany or Equivalent) 1 set
SUB TOTAL - A [A1]
Page 2 of 34
Schedule-1
C1. Mandatory Spare List for 100 MVA 220/132KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste Set 1
of each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 10
requirement
SUB TOTAL - C1
C2. Mandatory Spare List for 10 MVA 132/11KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste Set 1
of each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 5
requirement
Page 3 of 34
Schedule-1
SUB TOTAL - C2
SUB TOTAL - C[C1 +C2]
b) Insulating oil for 100MVA , 220/132 KV, 3-phase Autotransformers (* 1Lot Lot* 2
= Oil for 1 Autotransformers )
c) OLTC ( MR Germany or Equivalent) 2 set
d) 63MVA , 220/33 KV, 3-phase Power Transformer (Excluding insulating oil) Nos. 2
e) Insulating oil for 63MVA , 220/33 KV, 3-phase Power Transformers(* 1Lot Lot* 2
= Oil for 1Autotransformers )
f) OLTC ( MR Germany or Equivalent) 2 set
SUB TOTAL - A1
A2. REACTORS
a) 25MVAR,145kV Bus reactor (Excluding insulating oil) Nos. 1
b) Insulating Oil for 25 MVAR, 145 kV Shunt Reactors (* 1Lot = Oil for 1 Bus Lot* 1
reactor)
SUB TOTAL - A2
Page 4 of 34
Schedule-1
SUB TOTAL - B
C1. Mandatory Spare List for 100 MVA 220/132KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste Set 1
of each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 10
requirement
SUB TOTAL - C1
C2. Mandatory Spare List for 63 MVA 220/33KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste Set 1
of each type)
h) Remote Tap postion Indiactor No. 1
Page 5 of 34
Schedule-1
# Specify currency in accordance with specifications in Bid Data Sheet under ITB 18.1. Create and use as many columns for Foreign Currency requirement as there are
foreign currencies.
Designation: ____________________________
Page 6 of 34
Schedule 2
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
Schedule No. 2 : Plant (including Mandatory Spare Parts) Supplied from within Employer's country
A POWER TRANSFORMER
A1. POWER TRANSFORMER
a) 160MVA , 220/132 KV, 3-phase Autotransformer (Excluding insulating oil) Nos. 2
b) Insulating oil for 160MVA , 220/132 KV, 3-phase Autotransformers (* 1Lot = Lot* 2
Oil for 1Autotransformers )
c) OLTC ( MR Germany or Equivalent) set 2
SUB TOTAL - A [A1]
C1. Mandatory Spare List for 160 MVA 220/132KV Three Phase Power
Transformer
Page 7 of 34
Schedule 2
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
Page 8 of 34
Schedule 2
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste of Set 1
each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 10
requirement
k) 6000 LPH Oil filteration unit set 1
SUB TOTAL - C[C1]
b) Insulating oil for 100MVA , 220/132 KV, 3-phase Autotransformers (* 1Lot = Lot* 2
Oil for 1 Autotransformers )
c) OLTC ( MR Germany or Equivalent) set 2
d) 10MVA , 132/11 KV, 3-phase Power Transformer (Excluding insulating oil) 2
e) Insulating oil for 10MVA , 132/11 KV, 3-phase Power Transformers(* 1Lot = 2
Oil for 1Autotransformers )
OLTC ( MR Germany or Equivalent) set 2
SUB TOTAL - A [A1]
Page 9 of 34
Schedule 2
C1. Mandatory Spare List for 100 MVA 220/132KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste of Set 1
each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 10
requirement
SUB TOTAL - C1
C2. Mandatory Spare List for 10 MVA 132/11KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
Page 10 of 34
Schedule 2
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste of Set 1
each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 5
requirement
SUB TOTAL - C2
SUB TOTAL - C[C1 +C2]
b) Insulating oil for 100MVA , 220/132 KV, 3-phase Autotransformers (* 1Lot = Lot* 2
Oil for 1 Autotransformers )
c) OLTC ( MR Germany or Equivalent) set 2
d) 63MVA , 220/33 KV, 3-phase Power Transformer (Excluding insulating oil) Nos. 2
e) Insulating oil for 63MVA , 220/33 KV, 3-phase Power Transformers(* 1Lot = Lot* 2
Oil for 1Autotransformers )
OLTC ( MR Germany or Equivalent) 2
SUB TOTAL - A1
Page 11 of 34
Schedule 2
A2. REACTORS
a) 25MVAR,145kV Bus reactor (Excluding insulating oil) Nos. 1
b) Insulating Oil for 25 MVAR, 145 kV Shunt Reactors (* 1Lot = Oil for 1 Bus Lot* 1
reactor)
SUB TOTAL - A2
C1. Mandatory Spare List for 100 MVA 220/132KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste of Set 1
each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 10
requirement
Page 12 of 34
Schedule 2
SUB TOTAL - C1
C2. Mandatory Spare List for 63 MVA 220/33KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste of Set 1
each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 5
requirement
SUB TOTAL - C2
Page 13 of 34
Schedule 2
C3. Mandatory Spare List for Mandatory Spares for 145 KV, 25MVAR, Three
Phase Bus Reactor
a) Buchholz relay complete with float and contacts Set 1
b) Local WTI with sensing device and contacts Set 1
c) Remote WTI with sensing device and contacts Set 1
d) Oil temperature indicator (OTI) with contacts and sensing device Set 1
e) 145kV Bushing with metal parts and gaskets alongwith lifting tools No 1
f) 36kV Bushing with metal parts and gaskets alongwith lifting tools No 1
g) Spare insulating oil to be handed over to NEA after commissioning for O&M KL 5
requirement
SUB TOTAL - C3
SUB TOTAL - C[C1+C2+C3]
Designation: ____________________________
Page 14 of 34
Schedule 3
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
The scope of the Contract covers the detail design of the substations as well. The price of the detail design is deemed to have been covered in the
prices of the other schedules. So the contractor shall not be required to show the breakdown of the prices in this schedule. Accordingly no separate
payment shall be made for the design Services.
TOTAL
Date: Signature:
Place: Printed Name:
Designation:
Common Seal:
Page 15 of 34
Schedule 4-Part A
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
A POWER TRANSFORMER
A1. POWER TRANSFORMER
a) 160MVA , 220/132 KV, 3-phase Autotransformer (including OLTC but Nos. 2
Excluding insulating oil)
b) Insulating oil for 160MVA , 220/132 KV, 3-phase Autotransformers (* 1Lot Lot* 2
= Oil for 1Autotransformers )
SUB TOTAL - A [A1]
C1. Mandatory Spare List for 160 MVA 220/132KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
Page 16 of 33
Schedule 4-Part A
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste Set 1
of each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 10
requirement
k) 6000 LPH Oil filteration unit set 1
SUB TOTAL - C[C1]
Page 17 of 33
Schedule 4-Part A
C1. Mandatory Spare List for 100 MVA 220/132KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste Set 1
of each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 10
requirement
SUB TOTAL - C1
C2. Mandatory Spare List for 10 MVA 132/11KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste Set 1
of each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 5
requirement
SUB TOTAL - C2
SUB TOTAL - C[C1 +C2]
Page 18 of 33
Schedule 4-Part A
A2. REACTORS
a) 25MVAR,145kV Bus reactor (Excluding insulating oil) Nos. 1
b) Insulating Oil for 25 MVAR, 145 kV Shunt Reactors (* 1Lot = Oil for 1 Bus Lot* 1
reactor)
SUB TOTAL - A2
Page 19 of 33
Schedule 4-Part A
C1. Mandatory Spare List for 100 MVA 220/132KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste Set 1
of each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 10
requirement
SUB TOTAL - C1
C2. Mandatory Spare List for 63 MVA 220/33KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste Set 1
of each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 5
requirement
SUB TOTAL - C2
Page 20 of 33
Schedule 4-Part A
C3. Mandatory Spare List for Mandatory Spares for 145 KV, 25MVAR, Three
Phase Bus Reactor
a) Buchholz relay complete with float and contacts Set 1
b) Local WTI with sensing device and contacts Set 1
c) Remote WTI with sensing device and contacts Set 1
d) Oil temperature indicator (OTI) with contacts and sensing device Set 1
e) 145kV Bushing with metal parts and gaskets alongwith lifting tools No 1
f) 36kV Bushing with metal parts and gaskets alongwith lifting tools No 1
g) Spare insulating oil to be handed over to NEA after commissioning for O&M KL 5
requirement
SUB TOTAL - C3
SUB TOTAL - C[C1+C2+C3]
Designation: ____________________________
Page 21 of 33
Schedule 4-Part B
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
A POWER TRANSFORMER
A1. POWER TRANSFORMER
a) 160MVA , 220/132 KV, 3-phase Autotransformer (including OLTC but Nos. 2
Excluding insulating oil)
b) Insulating oil for 160MVA , 220/132 KV, 3-phase Autotransformers (* 1Lot = Lot* 2
Oil for 1Autotransformers )
SUB TOTAL - A [A1]
Page 22 of 34
Schedule 4-Part B
Page 23 of 34
Schedule 4-Part B
A2. REACTORS
a) 25MVAR,145kV Bus reactor (Excluding insulating oil) Nos. 1
b) Insulating Oil for 25 MVAR, 145 kV Shunt Reactors (* 1Lot = Oil for 1 Bus Lot* 1
reactor)
SUB TOTAL - A2
C1. Mandatory Spare List for 100 MVA 220/132KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
Page 24 of 34
Schedule 4-Part B
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste of Set 1
each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 10
requirement
SUB TOTAL - C1
C2. Mandatory Spare List for 63 MVA 220/33KV Three Phase Power
Transformer
a) Bushing of each rating with metal parts & gaskets and lifting tools Set 1
b) Oil Cooler pump with motor Set 1
c) Cooler fan with Motor No. 1
d) Buchholz Relay(Main Tank) complete with floats and contacts Set 1
e) Local and Remote WTI with sensing device and contact(each) Set 1
f) Magnetic oil level gauge No. 1
g) Strarters, contactors,switches & Relays for Electrical control panels(One ste of Set 1
each type)
h) Remote Tap postion Indiactor No. 1
i) Oil Flow Indicator with Flow Switch Set 1
j) Spare insulating oil to be handed over to NEA after commisioning for O&M KL 5
requirement
SUB TOTAL - C2
Page 25 of 34
Schedule 4-Part B
C3. Mandatory Spare List for Mandatory Spares for 145 KV, 25MVAR, Three
Phase Bus Reactor
a) Buchholz relay complete with float and contacts Set 1
b) Local WTI with sensing device and contacts Set 1
c) Remote WTI with sensing device and contacts Set 1
d) Oil temperature indicator (OTI) with contacts and sensing device Set 1
e) 145kV Bushing with metal parts and gaskets alongwith lifting tools No 1
f) 36kV Bushing with metal parts and gaskets alongwith lifting tools No 1
g) Spare insulating oil to be handed over to NEA after commissioning for O&M KL 5
requirement
SUB TOTAL - C3
SUB TOTAL - C[C1+C2+C3]
Designation: ____________________________
Page 26 of 34
Schedule 4-Part C(I)
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
Date: Signature:____________________________
Printed Name:____________________________
Place: Designation:____________________________
Common Seal:____________________________
Page 27 of 34
Schedule 4-Part C(I)
# Specify currency in accordance with specifications in Bid Data Sheet under ITB 18.1. Create and use as many columns for Foreign Currency requirement as
Page 28 of 34
Schedule 4-Part C(II)
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
REMARKS:
On Job Training in Nepal: The traveling and living expenses of Employer’s personnel for the training programme conducted in Employer country shall be
borne by the Employer.
Date: Signature:
Place: Printed Name:
Designation:
Common Seal:
Page 29 of 33
Schedule 4-Part D(I)
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
(Schedule of Rates and Prices)
Currency Total
(1) (2) (3) (4) (4)
Maintenanc
1.0
(A) TYPE TEST of 160 MVA 220/132KV Three Phase Power Transformer
1 Temperature rise test
2 Measurement of Acoustic Noise Level
3 Measurement of Harmonic level in no-load current
4 Measurement of Zero seq. reactance
5 Measurement of power taken by fans and oil pumps
(B) TYPE TEST of 100 MVA 220/132KV Three Phase Power Transformer
1 Temperature rise test
2 Measurement of Acoustic Noise Level
3 Measurement of Harmonic level in no-load current
4 Measurement of Zero seq. reactance
5 Measurement of power taken by fans and oil pumps
Date: Signature:
Place: Printed Name:
Designation:
Common Seal:
Page 30 of 33
Schedule 4-Part D(II)
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
(Schedule of Rates and Prices)
(B) TYPE TEST of 100 MVA 220/132KV Three Phase Power Transformer
1 Temperature rise test
2 Measurement of Acoustic Noise Level
3 Measurement of Harmonic level in no-load current
4 Measurement of Zero seq. reactance
5 Measurement of power taken by fans and oil pumps
Date: Signature:
Place: Printed Name:
Designation:
Common Seal:
Page 31 of 33
Schedule 5
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
Date:
Place:
Signature:
Printed Name:
Designation:
Common Seal:
Note:
# Specify currency in accordance with specifications in Bid Data Sheet under ITB 18.1. Create and use as
many columns for Foreign Currency requirement as there are foreign currencies.
Page 32 of 33
Schedule 6
Procurement of Plant Design, Supply and Installation of Power Transformer and Reactor
TOTAL
Date: Signature:
Place: Printed Name:
Designation:
Common Seal:
Note:
# Specify currency in accordance with specifications in Bid Data Sheet under ITB 18.1. Create and use as
many columns for Foreign Currency requirement as there are foreign currencies.
Page 33 of 33