Preventive Maintenece Plan Engineering Department

Month: April 2017 CSH Pharmaceuticals (Pvt.) Ltd.


Section 1st Week 2nd Week 3rd Week 4th Week Other Jobs Remarks Area

Instrumentation
&
Control

750kVA & 350kVA generators Utility


Security lights Plant building
Insect killers Admin
Electrical Tube lights Use Job cards for job details Technical + Utility
Tube lights Production + QA/QC

Suspension Filling & Sealing


Air Blowing & Labeling

Mechanical

HVAC

Civil

Recpected Officers/Supervisors of Enginnering Department,


It is strictly instructed you to complete the PM jobs of April, 2017. The supervisors/officers are bound to submit their documents and job cards before 29 April 2017 at "Engineering Office". Monthly
PM report should also be attached along with these document. If you face any difficulty while completing your jobs please feel free to contact with Engineering Manager.
Regards,
Mr. Zubair Haji
Engineering Manager

Prepare by: _________________________


Engineering Officer Approved by: ______________________
Engineering Manager