To overcome these problems tipper truck was invented. This For this ,we have to taken in consideration, specifications of
truck having hydraulic member in it which lifts the trolley tipper truck, Input parametres and theorotical calculations
upward to unload the material on rear side. The arrangment for this.
was just backside of cabin head, the hydraulic cylinder is
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1841
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
• Now,
• P=F/A
A=F/P
A=98100/230
A=426.52cm^2
• NOW
Vehicle load specification A=426.52cm^2
d=23.30cm
Max vehicle weight(fully loaded) : 16.2 ton d=233mm
Typical load capacity : 8.5 ton
Total load to be delivered : 10 ton Considering standard diameter
• Therefore d=240mm
• Now,
Let us consider that,
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1842
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
• Ts = starting time for lifting up the trolley • EN-8 (C-40) SAE 1040 used for hinges, hooks ,axles
• Tf = end/finish time while lifting up the trolley ,etc.)
• Tf-Ts = total time to lift the trolley
• Properties of EN8
• From literature review, survey and discussion with
ashok leyland, volvo, etc. manufacturer, average Bending stress=260MPa
time to lift the trolley to its maximum height i.e. Shear stress =210 MPa
time for evacuation can be taken as 3.5 minute.
• Load acting on hinge =10000kg
• Tf-Ts = 3.5 min • Load acting for 1 hinge =5000kg
• Length of pin =300mm
• Now power calculation of hydraulic motor;
• Moment acting on hinge =5000*300*9.81
• Flow quantity Q=Area*speed =14715KN
• Now, • Ʈ=W/(ᴫ/16)*(Do-Di)^3
Speed (V) = (max. stroke of back side tilting • Ʈ=5000*9.81/[(3.14/16)*(120-100)^3]
hydraulic )/(cylinder max. • Ʈ=31.23 MPa
evacuation time)
• As induced shear stress is 31.23 MPa is less than the
Speed=3500/3.5 permissible stress 210 MPa of EN8.
=100 cm/min
• Hence design is safe.
Flow quantity Q = area* speed
Q =426.52*100/1000
Q =42.65 litres per min 4.5 Design for pin
• From design data for machine elements by B.D. • Now checking pin for shear failure and crushing
SHIWALKAR failure
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1843
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
7. Acknowledgement
• checking for Shear failure
I would like to thanks to my college for
• Ʈ=(W*d/2)/(ᴫ/16) *d^3 providing valuable facilities which helps me in my
• Ʈ=(49050*90/2)/(ᴫ/16)*(90)^3 research work. I also express thanks to my parents,
• Ʈ=15.42Mpa friends and colleagues.
6. Future scope