Locations of boreholes (BH5, 6, 7 & BH12 & 13) are shown in the Drg A100. Estimated
depths are given in the BQ.
Boring should be terminated after 5 consecutive SPT values exceeding 50, or 5 consecutive
SPT values exceeding 30, if the borehole depth also exceeds 60m. Boring should also be
terminated if rock is encountered. Rock corings shall be carried out as follows:
Min. Core
Rock Type
Length