SPECIFICATION RIG EQUIPMENT FOR WORKOVER

COMPANY'S REQUIREMENTS CONTRACTOR’S QUOTE COMPANY


EVALUATION
NO.
QTY DESCRIPTION SPECIFICATION MANUFACTURER
AND MODEL STATUS NOT
COMPLY COMPLY

A RIG CARRIER EQUIPMENT


Rig Name : Any
Rig Type : Truck / Trailer Mounted
Capacity : Min. 250 HP
Manufacturer/Model : Any
Year to Built : Any
The Rig is capable to be used for :
- Workover at min. 1,000 m depth with 2-7/8" DP
- Woking string inside Casing : Casing and DP 3-1/2"
- Using Tubular : Drill Pipe size of 2-7/8"; Drill Collar size of 3-1/2"; Tubing size
of 2-7/8".D32
(see well diagram)
A.1 1 Unit Rig Carrier Yes Mandatory/Milik Sendiri
- Manufacturer/ Model : Any
- Brakes : Air brakes in all wheels
- Steering Hydraulic Powered
- Axles :
* Front : Any (axles),
* Rear : Any (axles)
- Number of Wheels : Any (each)
- Tires Types : Rough / Mud Terrain
- Tires Condition : Steering types shall be new / near new
- Transmission : Min. 3 speed
- Carrier Enginee also powered for Drawwork : Yes / No
- Hydraulic leveling jacks : Required
- Size Length x Width x Height : Any (ft)
- Total Weight (include Drawwork & Mast) : Any (Ton)
A.2 1 Unit Drawworks Yes Mandatory/Milik Sendiri
- Capable of work on string to a min. depth of 1,000 m, with 2-7/8” Tubing (J-55,
6.5 ppf) with weight in air of 32,000 lbs or 2-7/8” DP (Grade G, 10.4 ppf) with
weight on air of 52,000 lbs. The drawworks power must be sufficient to trip drill
pipe in open hole at 60 ft/min with at least 20% spare capacity.

- Drum : Double
- Manufacturer/Model : Any
- Main Drum Barrel : Any (inch) x Any (inch) long
- Main Drum Brakes : Ø Any (inch) x Any (inch)
- Hoisting Speed : Any (speeds)
- Input HP Rating : Min. 250
- Cooling system : Independent tank
- Grooving on Main Drum : 1” – 1-1/8”
- Single Load Line Capacity : Any (lbs)
- With Cathead 2 ea min or hydraulic to make up & break out
- Auxiliary Brake / Hydromatic Brake
- Crown Block Safety Devices
- Independent fresh water cooling system for Drawwork and Aux. Brake.
- Crown-O-Matic automatic disengaged clutch and activate brake
- C/w Prime Movers (engines)
- Emergency Shutdown
- In compliance with API 7K
A.3 1 Unit Drawworks Motor / Prime Mover Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Powered by : Electric Motor or Engine
- Number of engine : Any
- Continuous rating, hp : Any
- Intermittent rating, hp : Any
- Cooling system: Independent tank
- Input horse power : Any
- C/w torque converter and spark arrestor
A.4 1 Reel Sand Line Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Cable size : 9/16"
- Length : Min. 6,000 ft.
A.5 1 Unit Air Compressor Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Ingersol Rand or equivalent
- The air system is powered by a Compressor driven by the Engine, with 15 HP
per unit and 200 gal receiving vessel
- C/w all necessary piping and controls.
B MAST
B.1 1 Unit Rig Mast Yes Mandatory/Milik Sendiri
- Raising method : Telescopic or specify
- Manufacturer/Model : Any
- Clear working height : Min. 60 ft
* enough to accommodate 2 jts pipe of R-2 per stand
- Fingerboard/Racking Platform Capacity : Able to stand 2-7/8” Tubing, 6.5 ppf,
R-2 with min. 1,000 m
- Hook load : Min. 100,000 lbs
- Set back capacity : Min. 100,000 lbs
- Crown Block Rating : 100 ton
- Crown Sheaves : Min. 4 ea
- Groove Line size : Any (inch)
- C/w Crown safety platform and handrails laders to crown, traveling block
carrying cradle
- Hydraulic outriggers : able for min. 50 mph wind velocity and all guide lines

- In compliance with API 4F


B.2 1 Lot Standpipe & Manifold Yes Mandatory/Milik Sendiri
- Standpipe & Manifold : Min. 3" x 3,000 psi
- Rotary Hose : Min. 2-1/2" ID x 3,000 psi x 55 ft
B.3 1 Lot Lighting for Derrick Mast Yes Mandatory/Milik Sendiri
- Sufficient lighting at Derrick to allow Operation at night
- C/w explosion proof system and meet API Standard.
C SUBSTRUCTURE
C.1 1 Unit Substructure Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Steel Fixed or Telescopic Structure
- Clear woking height under rotary beam : Min. 16 ft height (sufficient space to
accommodate BOP stack height Class III, consist of Bell Nipple, Annular,
Double Rams, Spool)
- Capable of handling 150,000 lbs combined load (rotary + setback)
- Setback capacity : Min. 65,000 lbs
- Dimension of Floor Length x Width : Any (ft)
- Consist of: Rotary Table Base, Setback Base, Mast Base, Wind Board,
Handrails, Ladders, Flee Way, DP Sliding Way and Individual Rig Base, etc,.
with Rat Hole and Mouse Hole positions, 2 (two) sets Tong Posts, Trolley and
Rails for installing the BOP’s in the base.
- In compliance with API 4F
C.2 1 Unit Loading Ram Yes Mandatory/Milik Sendiri
- Size Length x Width x Height : Any (ft)
- Loading ram matched to rig carrier, derrick base and substructure, have
secure connection integrity with the substructure to ensure substructure and
mast stability.
C.3 1 Set Working Platform Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Adjustable Steel Platform
- Dimension of Floor Length x Width : Any (ft)
- Static Load : Min. 5,000 lbs
- Clear woking height : Min. 16 ft height (or sufficient space to accommodate
BOP stack height Class III, consist of Bell Nipple, Annular, Double Rams, Spool)

C.4 1 Unit Dog House


- Type : Steel fixed or equivalent
- Dimension Length x Width : Any (ft)
C.5 1 Unit Anti Spark V-Door & Cat Walk Yes Mandatory/Milik Sendiri
- Standard Type
- Dimension : Any (ft)
C.6 1 Lot Lighting for Substrucure and Drill Floor
- Sufficient lighting at Substrucure and Drill Floor area to allow Operation at
night
- C/w explosion proof system and meet API Standard.
D ROTARY / TRAVELLING EQUIPMENT
D.1 1 Lot Rotary Table Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Emsco or equivalent
- Rotary Table Opening : Min. 17-1/2" opening
- Number of electric motor : Any
- Rotating Speed, RPM : Max. 120 rpm
- Static Load cap. : Min. 100 Ton
- Master Bushing Type : Split
- Split Insert Bowl Bushing for size : Drill Collar 3-1/2”; Drill Pipe 2-7/8”, Tubing
3-1/2" and 2-7/8"
- Transmission : Any
- Torques limit & readout : Any
- Rotary table equipped with working rotary torque gauge measuring in ft.lbs
D.2 1 Unit Crown Block Assembly Yes Mandatory/Milik Sendiri
- Number of Sheave : Any
- Drilling Line : Any (inch)
- Drilling line length min. 3,000 ft
- Match with Drawork Drum and Drilling Line
- Drilling line compliance with API Spec 9A
D.3 1 Unit Travelling Block & Hook Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Death strength rating Capacity : Min. 75 ton
- C/w standard and extra long Links for cementing
- All Elevator Links rated for min. 75 ton
- Match to Drum and Mast
D.4 1 Each Swivel Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Capacity : Min. 100 ton
- Pressure rating : Min. 3,000 psi
- Length : Any (ft)
- Able to connect to Kelly
D.5 1 Each Kelly 3-1/2" (with scabboard)
- Model : Square or Hexagonal
- Length : 34 - 40 ft working space
- Drive Bushing matched to Rotary Table
- C/w Upper & Lower Kelly Cock
D.6 2 Each Hoist
- Type : Hydraulic or Pneumatic hoist
- Wire rope size : Any (inch)
- Capacity : Min. 6,000 lbs each
- C/w brand new cable and a guide to ensure the cable is properly wound on the
drum when hoist is operated
- For pneumatic hoist, a separate dedicated compressor & suitable size air tank
must be provided to operate hoist only
E PUMP AUXILARIES
E.1 1 Unit Mud Pump Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Emsco, National Oilwell, Gardner-Denver, Ideco or
equivalent
- Skid Mounted, Triplex Pump
- Input horsepower rate : Min. 400 HP
- Operating pressure : Min. 1,500 psi
- Operating rate : Min. 350 gpm
- Each Triplex Pump complete with the following :
* 1 (one) each Pulsation Dampener c/w Pressure Gauge on input and output,
Specify
* 1 (one) each Flooded Suction provided by independently driven electric
motor or belt driven centrifugal pumps
- Provided with replacement Liners : 6-1/2", 6", 5"
- Transmission : Hydraulic Torque Converter
- Slow pump rate capability : Any spm (for killing rate)
- Pump Stroke Counter
- Vibration Hoses on Discharges rated 3,000 psi c/w Safety Hobble Chain
- Pressure Gauge on discharge line
- Discharge Manifold, from Mud Pumps to Stand Pipe and Kill Line.
- Remote operated system
- Manufacturer API certified
E.2 1 Unit Mud Pump Prime Mover Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Caterpillar, Detroit, Cummin or equivalent
- Capacity : Min. 400 HP
- All engine c/w hydro mechanical & air intake shut off device
E.3 1 Unit Water Pump
- Manufacturer/Model : Any
- Skid Mounted, Portable Water Pump
- Powered by Diesel Engine
- Capacity : Min. 20 GPM
E.4 1 Unit Fuel Tank Yes Mandatory/Milik Sendiri
- Skid mounted with lifting lugs, steel construction
- Capacity : 7,000-10,000 liter/unit or enough capacity to supply fuel for 7 days
of operation
- Equipped with clear Fluid Level Indicator, Flowmeter, electric transfer pump,
Hose Gun and Locking System
E.5 1 Lot Lighting for Mud Pump and Fuel Tank
- Sufficient lighting at Mud Pump and Fuel Tank area to allow Operation at night

- C/w explosion proof system and meet API Standard.


F MUD TANK AND SOLID CONSTROL SYSTEM
F.1 2 Unit Mud Tank Yes Mandatory/Milik Sendiri
- Tank Capacity : Min. 180 bbls each
- Total Capacity : Min. 360 bbls
- Type : Trailer or Skid Mounted
- Number of Compartement : Min. 2 each
- Separate compartement for :
* 1 (one) each Trip Tank (c/w level indicator).
* 1 (one) each Mixing Tank, Cap. 100 bbls, c/w Hopper, Agitator, Centrifuge
Pump 50 HP.
* Other compartement, c/w Agitator
- Mud tank and mixing area equipped with adequate lighting for full visibility
during night operations (light fixtures on tank and shaker area capable of being
rotated and aimed)
- Mud tank/mixing area must be equipped with eyewash station and chemical
safety shower
- Specify dimension each Mud Tanks (length x width x height)
F.2 1 Unit Mud Hoppers & Mixing Pump Yes Mandatory/Milik Sendiri
- For active and pre-mix tanks with separate suction lines and flexible / separate
discharge lines
- C/w fluid and chemical shearing devices using impingement plates, piping,
valves, sack support.
- Dedicated centrifugal pump and 60 HP electric motor
F.3 1 Set Mud Agitator Yes Mandatory/Milik Sendiri
- One each per compartment, except sand trap
- Able to provide 65-85 second turnover rate, with explosion proof electric motor.

- Motor control boxes must be housed in explosion proof boxes.


F.4 1 Set Mud Manifolds
- Unitized 3", 3000 PSI for standpipe, kill line and fill line complete with sufficient
valves to direct mud flow as needed
- All hammer union connection
F.5 1 Unit Shale Shaker
- Manufacturer/Model : Any
- Linear Motion
- Each shaker capable of handling min. 400 gpm (total 400 gpm) of 8.4 – 9.2
ppg water base mud with 120 mesh screen
- Equiped with adjustable deck angle up and down
- C/w explosion proof vibrating electric motor and has jet sprayer system for
screen cleaning
- Preferable manufacturer : Derrick / Brandt / Swaco / Fluid System Inc.
F.6 1 Lot Screen Mesh
- Contractor must provide shaker screen in size and quantity for each well as
below :
* Screen 120 Mesh, Flat Type
* Screen 180 Mesh, Flat Type
- In compliance with API 13C
F.7 1 Set Cellar Jet System
- Standard type for oil field to drain cellar or pit
- Connected to vaccuum or centrifuge pump
F.8 1 Unit Water Storage Tank Yes Mandatory/Milik Sendiri
- Skid Mounted Water Tank
- Capacity : Min. 180 bbls capacity each
- C/w Centrifugal Transfer Pump (specify pump), hoses, standpipe/manifold,
visual sight level monitor
- 1 (one) separate portable water tank internally plastic coated for camp facility

F.9 1 Lot Lighting for Mud Mixing


- Sufficient lighting at Mud Mixing area and Tanks to allow Operation at night
- C/w explosion proof system and meet API Standard.
G BLOW OUT PREVENTER EQUIPMENT AND OPERATING UNIT
All BOP Equipment or Accessories should be suitable with Company's Wellhead
equipment (see Company's Wellhead equipment drawing) and c/w valid BOPE
certification and API certified manufacturer.
G.1 1 Unit Annular BOP 11" - 3K or 5K psi WP Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Type and Pressure Rating : Any
- Connection Top and Bottom : Any
- Rubbers elements : 1 ea used and 1 ea spare
- Dimensions Height : Any (ft)
G.2 1 Unit Single Ram BOP 11" - 3K or 5K psi WP Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Type and Pressure Rating : Any
- Connection Top and Bottom : Any
- Dimensions Height : Any (ft)
G.3 1 Lot Pipe and Blind Ram Stock for BOP 11” - 3K or 5K psi WP
- Blind rams : 2 set
- Type and Pressure Rating : Any
- Pipe rams 2-7/8" : 2 set
- Pipe rams 3-1/2" : 2 set
- C/w spare set of front packer, top seal and ring gasket as required
G.4 1 Unit Annular BOP 7-1/16" - 3K or 5K psi WP Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Type and Pressure Rating : Any
- Connection Top and Bottom : Any
- Rubbers elements : 1 ea used and 1 ea spare
- Dimensions Height : Any (ft)
G.5 1 Unit Double Ram BOP 7-1/16" - 3K or 5K psi WP Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Type and Pressure Rating : Any
- Connection Top and Bottom : Any
- Dimensions Height : Any (ft)
G.6 1 Lot Pipe and Blind Ram Stock for BOP 7-1/16” – 3K or 5K psi WP
- Blind rams : 2 set
- Pipe rams 2-7/8" : 2 set
- Pipe rams 3-1/2" : 2 set
- C/w spare set of front packer, top seal and ring gasket as required
G.7 1 Unit Accumulator Unit Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Skid Mounted and covered in area
- Working pressure 3,000 psi with capacity min 80 gallon
- Capable to close-open-close BOPE, without electric system, as per API
- Min. 4 station, Compressor automatically start, with remote control in rig floor

- Pneumatic pump : 2 sets


- Driven charge pumps : Triplex pump 15 HP
- Electric driven pumps : 1 unit, 15 HP
G.8 1 Unit Choke Manifold and Killing Line (Back Pressure Manifold) Yes Mandatory/Milik Sendiri
- 2" x 3" - 3K psi WP all arrangement as per API Spec
- 2 set manual choke with console 3-1/8” - 3K psi WP
- 1 set manual adjustable choke and positive choke
- C/w Hammer Type Union / Flexi Hose / Hard Pipe 3" - 3K to Mud Cross
G.9 1 Each Check Valve 2"-3K
- Check Valve to be installed in Kill Line
G.10 1 Lot Adaptor Spool & Double Studded Adapter Flange (DSAF)
- Contractor is responsible to provide all necessary adapters to match with its
Contractor's BOP equipment to Company's Wellheads, include with:
* 11" 5K x 11” 3K : as required
* 11” 3K x 7-1/16” 3K : as required
* 11” 3K x 7-1/16” 5K : as required
* 7-1/16” 5K x 7-1/16” 3K : as required
* 7-1/16” 3K x 7-1/16” 3K : as required
- All connection must be match with BOP Stack
G.11 1 Unit Hydrotest / BOPE Test Pump Yes Mandatory/Milik Sendiri
- BOP test pump c/w 3000 psi piston pump, capable 4 gpm at 3000 psi, relieve
valve, low pressure suction hose, 3000 psi piping to connect to BP, chart
recorder with max. 3000 psi, time clock setting, pressure gauge 0-500 psi and 0-
5000 psi.
- C/w spare or inventory paper chart and using accumulator pump is not
acceptable.
G.12 1 Lot Bell Nipple & Flow Line Yes Mandatory/Milik Sendiri
- Bell Nipple & Flow Line as required
G.13 1 Lot BOP Sucker Rod Yes Mandatory/Milik Sendiri
- As required
G.14 1 Lot Tester Cup
- For Casing 9-5/8", 6-5/8", 5-1/2", 4-1/2"
- Type F or as required
G.15 1 Lot Lighting for BOP
- Sufficient lighting at BOP area to allow Operation at night
- C/w explosion proof system and meet API Standard.
H GENERATOR SET & ELECTRICAL EQUIPMENT
All electrical instrument/equipment and lights must in compliance with API
RP54, API RP500.
H.1 1 Set Genset for Workover/Well Service Activities Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Skid mounted Genset with generator house
- Capable to supply power requirements of Workover/Well Service activities
(including Rig Camp Facility)
- Continuous rating Capacity: min. 300 KVA at 60 Hz or equivalent
- Spark Arrestor, covers with Thermo Cover and Silencer.
- C/w Panel Box, Junction Box, lifting lugs, safety and protection shutdowns, fuel
tank, explosion proof lighting.
- Genset will also supply power for: rig equipment, instrument, solid control
motor, portacamp, etc.
- If generator fail to provide sufficient power, Contractor responsible to provide
additional power supply at its own cost.
H.2 1 Set Genset for Moving Activity Yes Mandatory/Milik Sendiri
- Manufacturer/Model : Any
- Portable Genset
- Capacity : min. 10 KVA or equivalent
- Capable to supply power during rig moves.
H.3 2 Set Lighting for Moving Activity
- Mobile tower Lighting and Genset min. 4 KW
- Tower lighting c/w 4 each of light with min. 400 W for each light and capable to
rotate 360 degrees
- C/w explosion proof system
H.4 1 Lot Rig Lighting
- Contractor must provide all adequate lighting, including but not limited to:
Derrick & Substructure, Mud Pump, Mud Mixing, Mud Tanks & Pits, Genset,
Fuel Tank, Pipe Rack, BOP, Drill Floor, Rig Office and Camps.
- All lighting provided c/w explosion proof system
- If the lighting provided is insufficient, Contractor responsible to provide
additional lighting at its own cost.
I INSTRUMENT
I. Driller's Console Instrumentation
I.1 1 Each Weight Indicator (with Calibration Certificate) Yes Mandatory/Milik Sendiri
- With cap. 0 - 200,000 lbs
- C/w Hook Load and WOB
I.2 2 Each Mud Pump Pressure Gauge
- With 0 - 5000 psi
- Placed at console and standpipe manifold
I.3 1 Each Pump Stroke and Rate Counter
- For indicating Pump SPM & Rate GPM
- With 0 - 200, for each pump
I.4 1 Each Rotary Torque Gauge
- With 0 - 20,000 ft.lbs
- c/w sensatory
I.5 1 Each Rotary Tong Torque Gauge
- Range, ft.lb : Any
I.6 1 Each RPM Gauge
- With 0 – 300
J DRILLING STRING
All equipment should be matched to support required Drilling String connection

J.1 1 Lot 2-7/8" Drill Pipe Yes Mandatory/Milik Sendiri


- Requirement length : Min. 3600 ft
- Number of joints : Min. 120 Jts
- API Specification : Size 2-7/8", Grade G105, IF Connection, 10.4 ppf,
Premium Class, Pipe R-2
- Hard Banding : Smooth, flush, fine particle, non abrasive
- C/w of Internal Coating, Thread Protectors & current inspection report
J.2 2 Each 2-7/8" Pup Joint Drill Pipe Yes Mandatory/Milik Sendiri
- Number of joints : 2 jts for each size length
- API Specification : Size 2-7/8", Grade G105, IF Connection, 10.4 ppf,
Premium Class, Pipe R-2
- Length of : 10 ft and 15 ft for each sizes
- C/w Thread protector & current inspection report
J.3 1 Lot Drill Collars 3-1/2" Yes Mandatory/Milik Sendiri
- Number of joints : min. 10 joint (including for spare)
- API Specification : Size 2-7/8" OD x 1-1/4" ID, Spiral Type, IF Connection, 18
ppf, Premium Class, Pipe R-2
- C/w Thread protector & current inspection report
J.4 1 Lot Crossover Sub Yes Mandatory/Milik Sendiri
- Related to required drilling string
J.5 1 Lot Lifting Sub Yes Mandatory/Milik Sendiri
- As required
J.6 1 Lot Circulating Head for Drill Pipe Yes Mandatory/Milik Sendiri
- Requirement : 1 (one) each for required size.
- For Drill Pipe size of : 2-7/8"
J.7 1 Lot Circulating Head for Tubing Yes Mandatory/Milik Sendiri
- Requirement : 1 (one) each for required size.
- For Tubing size of : 2-7/8", 3-1/2”
J.8 1 Lot Inside BOP 3K psi for Drill Pipe Yes Mandatory/Milik Sendiri
- Requirement : 1 (one) each for required size.
- For Drill Pipe size of : 2-7/8"
- To be ready at the rig floor with same connection of Drill Pipe usage
J.9 1 Lot Inside BOP 3K psi for Tubing Yes Mandatory/Milik Sendiri
- Requirement : 1 (one) each for required size.
- For Tubing size of : 2-7/8" or 3-1/2"
- To be ready at the rig floor with same connection of Tubing usage
J.10 1 Lot Full Opening Safety Valve 3K psi Yes Mandatory/Milik Sendiri
- 1 (one) ea to be ready at the rig floor with same connection for Drill Pipe (2-
7/8") and Tubing (2-7/8", 3-1/2”) usage.
J.11 3 Set Pipe Rack
- Adequate for Drill string, Tubing, Sucker Rod
- Pipe racks must be designed and built as per engineering calculation to handle
the loads required and shall have clear identification of the capacity
J.12 1 Lot Pipe Box
- Enough quantity to support all drill string
- Adequate for drill string, casing and tubing
J.13 1 Each Derrick Tape
- Steel type with 100 ft length
J.14 1 Lot DP Float
- Requirement: 1 (one) each for required size.
- Match for Bit Sub
J.15 1 Lot DP Pipe Wiper
- Requirement : 1 (one) each for required size.
- Rubber type
- Match for Tubing and DP
J.16 1 Lot Mud Bucket
- Standard type
- Mud bucket or mud saver c/w seals for DP 2-7/8"
- Suitable for all pipe sizes and can be handled by one person
J.17 1 Lot Drift
- Requirement : 1 (one) each for required size:
* DC : 3-1/2"
* DP : 2-7/8"
* Tubing : 2-7/8", 3-1/2”
K HANDLING TOOLS
All equipment should be matched to support required Drilling String and Casing
String
K.1 1 Set Rotary or Manual Tong (2 ea) Yes Mandatory/Milik Sendiri
- Manufacturer : BJ type C or equivalent
- C/w jaws for :
* DC : 3-1/2"
* DP : 2-7/8"
* Tubing : 2-7/8", 3-1/2”
K.2 1 Set Hydraulic Power Tong Yes Mandatory/Milik Sendiri
- Manufacturer : Universal or equivalent
- For Tubing : 2-7/8", 3-1/2”
- For Pipe: 2-7/8" DP, and 3-1/2" DC
K.3 2 Set Rotary Slip Yes Mandatory/Milik Sendiri
- Fit to Rotary Table Bushing
- Manual type, for:
* DC : 3-1/2"
* DP : 2-7/8"
* Tubing : 2-7/8", 3-1/2”
- C/w spare element, dice
K.4 1 Lot Elevator Link Yes Mandatory/Milik Sendiri
- Requirement : 1 (one) set for required size
- 1 (one) set of Size : min. 1-3/4" x 72", cap. 100 ton
- Weldless (non welding), Matched to Block
K.5 1 Lot Elevator Yes Mandatory/Milik Sendiri
- Capacity : min. 100 Ton
- Requirement : 2 (two) set for required size:
* DC : 3-1/2”
* DP : 2-7/8"
* Tubing : 2-7/8" and 3-1/2”
K.6 1 Lot Spider Slip Yes Mandatory/Milik Sendiri
- For Tubing : 1 (one) set
* Tubing size : 2-7/8"and 3-1/2", with 85-100 ton capacity
K.7 1 Lot Safety Clamp Yes Mandatory/Milik Sendiri
- Capacity : min. 100 Ton
- Requirement : 1 (one) each for required size:
* DC : 3-1/2”
* DP : 2-7/8"
K.8 1 Lot Bit Breakers and Ring Gauges
- Requirement : 1 (one) each for required size:
- For TCB size : 8-1/2", 4-3/4", 3-1/2"
K.9 1 Lot Bit Sub
- Requirement : 1 (one) each for required size:
* 2 (two) ea Bit Sub for use with 3-1/2" Drill Collars bore for float, c/w float
valve
- Contractor should provide a complete list of all subs to be provided, with full
dimensions.
K.10 1 Set Sucker Rod Hook Yes Mandatory/Milik Sendiri
- Capacity: Min. 25 tons.
K.11 2 Set Sucker Rod Elevator Yes Mandatory/Milik Sendiri
- Capacity: Min. 25 tons.
- To handle Sucker Rod size: 5/8”, 3/4”, 1”
K.12 2 Set Sucker Rod Wrench Yes Mandatory/Milik Sendiri
- To handle Sucker Rod size: 5/8”, 3/4”, 1”
K.13 1 Set Power Sucker Rod Tong Yes Mandatory/Milik Sendiri
- C/w Jaw for Sucker Rod size: 5/8”, 3/4”, 1”
K.14 1 Lot Miscelaneous Wrench, Tools, Keys
- All necessary miscellaneous wrench, tools, keys to support rig and operation
activities.
L SAFETY & FIRE EQUIPMENT
L.1 2 Set Derrick Safety Belt Yes Mandatory/Milik Sendiri
- Derrick belt and offshore tower type full body hardness with anti blood stop
strap, c/w shock absorber type lanyard with appropriate length
L.2 2 Set Safety Chair / Escape Device Yes Mandatory/Milik Sendiri
- Retractable type escape device with automatic brake system is prefered
- Installation shal minimum comply API RP 54
- User must be secured with full body harness when descending
- C/w 1/2" line matched to escape device and derrick height and escape pole as
necessary
L.3 2 Set Climbing Harnesses Yes Mandatory/Milik Sendiri
- Climbing harnesses with leg and shoulder straps manufactured to international
standard with anti suspension trauma strap
- C/w sock absorber lanyard and big hook
L.4 2 Set Fall Prevention Device Yes Mandatory/Milik Sendiri
- Fall prevention device manufacture to international standard, matched t derrick
height and intalled on the derrick
- Counterweights are not acceptable, inertia reel type is preferred.
L.5 1 Each Stretcher
- Light weight, durable, folded type, can be used to bring patient from high
elevation,
- Fit in the space at dog house & rig medical room.
- C/w full body straps, bride slings, blankets
L.6 2 Each Windsock
- Standard type
L.7 1 Set Multi-Gas Detector
- With all standard accessories for detecting methane, H2S and CO2, digital
sound alarm
- C/w charger and approved by authorized agent, and Contractor responsible to
perform calibration as per manufacturer recommendation
L.8 2 Unit Portable Rig/Bug Blower
- Size 48”
- C/w explosive proof system, housing and electric cable sufficient to place
anywhere in immediate rig area
L.9 2 Set 30 Minutes Self Containt Breathing Apparatus (SCBA)
- C/w Accessories and 1 (one) each spare bottle each set
L.10 1 Set 10 Minutes Self Containt Breathing Apparatus (SCBA)
- C/w accessories and will be placed on Monkey Board
L.11 2 Each Portable Eyewash
- Portable Eyewash
L.12 1 Each Safety Shower
- Standard type with water supply
- Located in mud tank area
L.13 1 Lot Security Portable Shack
- Small portable shack for security entrance gate and access control post
- Include electric lamp, explosive proof, c/w bulletin board uniform, flash light,
plastic chain, yellow line, grounding system, hand glove, safety head, safety
glasses, ear plug and visitor badge
L.14 1 Set Muster Point Shelter
- Standard type
L.15 1 Set Emergency Alarm
- Standard type
L.16 1 Each Personnel On Board
- Standard type
L.17 1 Lot Safety Warning Sign
- Contractor should provide any safety information or sign whenever a hazard or
danger can't be avoided adequately or reduced in another way at site or rig
location.
- Sign should be in English and Bahasa Indonesia, including: safety/health,
signboard, prohibition, warning, mandatory, plastic police line, lock out tag out
and other information.
L.18 1 Lot Personnel Protection Equipment
Contractor must provide replacement or spare material when original issue is
not acceptable to Company.
A). PPE Per Crew Member, include:
* 1 (one) set Safety Hat. Meet standard ANSI Z.89.1, top guard type protect
hazards of impact and penetration from falling & flaying object, limited electric
sock & burn chain strap is required for Derrick Man. Different color for: Site
Personnel, New Worker, HSE team and Visitor.
* 1 (one) pair Safety Glasses for eye protection, with general purpose plastic
lenses. Meet SNI or ANSI standard.
* 1 (one) pair Ear Plug or Ear Protection.
* 2 (three) pair/person/year Coverall FRC (Flammable Retardant Coverall).
Material standard: EN 531, EN 533, NFPA 2112. Material weight: 7.5 oz/yard.
Color: based on Contractor color. Coverall style: Long sleeve with half
elasticated at waist, two front chest pocket, two front leg pocket, two rear leg
pocket, one pen sleeve pocket. Reflective tape: Scocthlite-Silver Flame
Resistance 2 inch width at around arms, legs and shoulders/back coverall.
Embroidery: Contractor logo at front left chest and back coverall, Employee
name on front right chest, Indonesian flag at upper right sleeve.

* 1 (one) pair Standar Hand Gloves. Cotton polka dot. Purpose for light general
maintenance. Including replacement supplies if material is damaged, dirty or
non feasible to use
* 1 (one) pair Safety Shoes. Good condition, use safety toe and oil resistant.
Meet SNI or ANSI standard.
B). PPE for Specific Work
* 1 (one) pair General Purpose Safety Goggles, for personnel who handle
chemicals. Non-ventilated type, polycarbonate spectacle, clear lenses,
elastis/rubber head band, lenses cleaner. Meet SNI or ANSI standard.

* 1 (one) pair Earmuff, for personnel who works on high noise area. Earmuff can
be attached to safety helmet.
* 1 (one) each Industrial Dust Mask, for personnel who handle chemicals.
Organic vapor respirator dust for respirator. Surgical face masks are prohibited.

* 1 (one) each Full Face Shield and Apron, for personnel who handle grinding
activity or certain hazard from material transmitting. Shield can be attached to
safety helmet.
* 1 (one) pair Chemical Rubber Hand Gloves, for personnel who handling
chemical and goods at oil industry activities.
* 1 (one) pair Rain Coat, for personnel who works on rainy weather. Include shirt
and pants.
* 1 (one) lot Welding Protective Equipment, for welding activity. Including full
face helmet and goggles, respirators, jacket or leather apron, gloves.

* 2 (two) pair High Voltage Resistant Safety Gloves, for personnel who works on
high voltage electricity/equipment. Provide for electrician and assistant.

L.19 2 Box Standard First Aid (P3K)


- In compliance with SNI-19-3994-1995, include with standard of medical
equipment Box III and drugs Box III.
- C/w snake bite kit
L.20 1 Lot Burn Pack
- Standard type
L.21 1 Each Water Gel Burn Dressing
- Model 30-100
- Consist of : 1 set of 8" x 18" Water Jel and 1 set of 2" x 6" Water Jel
L.22 2 Each 30 Minutes Oxygen Bottles / Respiratory Aid
- Oxygen bottles c/w accessories for breathing assistance during emergency
and medical operations.
- In compliance with Kepmen Kesehatan RI No. 1439/MENKES/SK/XI/2002
L.23 10 Each 9 Kg Dry Chemical Fire Extinguisher for outdoor

- Dry Chemical Type, ABC Fire Class


- Will placed at area of : Dog House, Rig Floor, Shale Shaker, Mud Pump,
Drawwork, Genset, Warehouse, Fuel Tank, Welding Shop
- C/w working presssure gauge and cover/stand for each unit.
L.24 2 Each 9 Kg Dry Chemical Fire Extinguisher for indoor
- Dry Chemical Type, ABC Fire Class
- Will placed at area of : Rig office and Portacamp (1 each for every 2 separate
rooms)
- C/w working presssure gauge and cover/stand for each unit.
L.25 4 Each 5 Kg CO2 Fire Extinguisher
- CO2 Type, BE Fire Class
- Will placed at area of : Genset (2 each for genset room or electrical apparatus
room)
- C/w working presssure gauge and cover/stand for each unit.
L.26 2 Unit 75 Kg Fire Extinguisher
- Dry Chemical ,Type ABC
- Wheeled carriage c/w hose min. 5 m, nozzle, trolley, housing.
- c/w Working Pressure Gauges and other accessories
L.27 1 Each Fire Axe
- Standard type
L.28 1 Each 5 Lbs Brass / Copper Hammer
- C/w wooden handle
L.29 4 Set Fire Suits
- Standard type
L.30 1 Set Fire Pump (as Regulation Pertamina Drilling Way)
- Standard type, complete set
M TRANSPORTATION AND HEAVY EQUIPMENT
I. Daily Operation
M.1 1 Unit Oil Field Truck 30 ton
- 1 (one) unit
- Tandem or Tronton, c/w Winch
M.2 1 Unit Boom/Foco Truck 20 ton
- 1 (one) unit
- Boom capacity min. 6 ton
M.3 1 Unit Crane Min. 25 Ton
- Capacity : Min. 25 Ton
- Structure : Telescopic or Fixed
- Mobility type : Truck/Wheel
M.4 1 Unit Car or Double Cabin Light Vehicle 4x4
- 1 (one) unit for CoMan, DE and Wellsite Geologist (Operation)
- Built min. Year 2017
- C/w spare tire, standard car auxiliaries, safety equipment, light fire
extinguisher, etc.
M.5 1 Unit Crew Bus
- Capacity : min. 15 seats
- C/w seat safety belts, spare tire, standard car auxiliaries, safety equipment,
light fire extinguisher, local license plate, etc.
M.6 1 Unit Vacuum Truck
- Capacity min 10,000 ltr
- Drive: 4 x 6 WD
- C/w offroad tyre and spare, light, pumps, safety equipment, light fire
extinguisher, etc.
M.7 1 Unit Ambulance
- 1 (one) unit Ambulance Vehicle 4x4
N MISCELLANEOUS AND FISHING EQUIPMENT
Contractor must provide Fishing equipment required and all equipment should
be able to catch BHA fishing neck components and to use at inside:
Open Hole : 8-1/2", 6-1/8", 6";
Casing: 9-5/8", 6-5/8", 5-1/2", 4-1/2"
Tubular: DP 2-7/8”, DP 3-1/2", DC 3-1/2”, Tubing 2-7/8” or 3-1/2”
N.1 1 Set Overshot
- Requirement : 1 (one) each for required size
- External catch fishing tools, match with tubular dimension.
- Type : Bowen Series 150 or equivalent
- C/w spiral and basket grapple to fish from 2-7/8" to 4-3/4" OD pipe
N.2 1 Set Taper Tap
- Requirement : 1 (one) each for required size
- Internal catch fishing tools, match with tubular dimension.
- Type : Bowen Rotary Tapper Taps or equivalent
- Application for inside diameter of tubular 2-7/8" to 4-3/4" OD pipe
N.3 1 Seet Junk Sub
- Requirement : 1 (one) each for required size
- Catching object that to heavy to be circulated
- Type : Bowen or equivalent
N.4 1 Set Fishing Magnet
- Requirement : 1 (one) each for required size
- Catching object by magnetic attraction.
N.5 1 Set Impression Block
- Requirement : 1 (one) each for required size
- Obtain impressions and identify the objects.
N.6 1 Set Fishing Jar
- Requirement : 1 (one) each for required size
- Deliver an upward blow and optimize jarring force.
- Size : 4-3/4"
N.7 1 Set Bumper Sub
- Requirement : 1 (one) each for required size
- Allows full torque and unrestricted fluid circulation
N.8 1 Set Sucker Rod Overshot
- Requirement : 1 (one) each for required size
- Engaging and retrieving sucker rods, couplings, and similar items from inside
tubing strings 2-7/8".
- Type : Bowen Series 10 or equivalent
- C/w spiral and basket grapple to fish for SR 3/4" & 5/8"
N.9 1 Lot Swabbing Tool / Equipment Complete : Yes Mandatory/Milik Sendiri
- For swabbing job in Tubing: 2-7/8", J-55, 6.5 ppf & DP 3-1/2"
- Consist of : Ratting rod 3” BOP, BOP RAM 1/2” to 9/16”, Oil saver, Weight
Bars and Knuckle Joint, 5M Gate Valve, 15 Lubricator Barrel, Swage 3-1/2”
8RD EUE to 2 7/8” EUE 8RD, Swabbing Mandrel for 2-7/8”
N.10 1 Each Depthometer
- 1 (one) each
N.11 1 Each 9-5/8" Casing Scraper
- Casing Scraper for 9-5/8", 36.0-40.0 ppf
N.12 1 Each 6-5/8" Casing Scraper
- Casing Scraper for 6-5/8", 17.0-24.0 ppf
N.12 1 Each 5-1/2" Casing Scraper
- Casing Scraper for 5-1/2", 13.0-17.0 ppf
N.12 1 Each 4-1/2" Casing Scraper
- Casing Scraper for 4-1/2", 9.5-12.6 ppf
N.13 1 Each Tubing Bailer
- 1 (one) each
- For inside Casing 9-5/8", 6-5/8", 5-1/2", 4-1/2" and Tubing Size 2-7/8"
- C/w box bailer
N.14 1 Set Tubular Caliper
- Requirement : 1 (one) each for required size
- To measure Outside Diameter (OD) and Inside Diameter (ID)
O WELDING UNIT
O.1 1 Unit Welding Unit AC/DC and Cutting Torch Yes Mandatory/Milik Sendiri
- Capacity : min. 300 A
- Cutting Torch : Oxigen, Accetyline
- C/w Mechanical portable workshop, steel construction wth lifting lugs,
workbench, Head Type and Safety Equipment, hand tools
P ACCOMODATION / PORTACAMP AND MISCELLANEOUS
Contractor is to supply :
Fully Air Conditioned camp complete with personnel required to operate such
camp in order to work, feed, and sleep for Company, Contractor and Third Party
on a 24 hours basis.
P.1 1 Lot Company Man/Staff Room
- Separate Room for :
* Company Man : 1 bed room
* Drilling Engineer & Wellsite Geologist : 1 bed room
- Air Conditioner (AC min. 1 PK)
- Work room with Table Desk & Chairs, Electric Stabilizer
- Air Refrigerator, c/w adequate Soft Drink & Daily Food
- C/w Water Supply, Bath Room, Shower, Washtapel, Water Heater for hot
water, Wash Basin (Hand Wash Table), Television set, Cable TV Channel,
Lamp, Electricity, Internet.
- The facility will include meals and lodging, shower and laundry.
- Dimension : Min. 8 ft x 20 ft each room
P.2 1 Lot Rig Contractor's Portacamps / Messroom
- For Rig Contractor's Crews / Personnels
- Contractor at his own cost, must be able to provide shelter/room (i.e rent
house) for the entire contractor's crew or personnel. Contractor shall ensure that
the room is adequate and meets every aspect of Company's HSE. Contractor is
responsible for the safety, security, hygiene and other things on the use of
dwellings place.
- The facility will include meals and lodging, shower and laundry.
P.3 1 Lot Medic Portacamps
- Medic Portacamps 20 ft
- Suitable room for work in 24 hours.
- Complete medical equipment & Medicines and vaccines
P.4 1 Lot PortableToilet
- Min. 2 (twor) room
- For Company's Guest, Crew and Third Party Personel
- Suitablle for Shower and Toilet
- C/w Water Supply, Water Hose/Line, Lavatory Container Bucket, Lamp,
Exhaust Blower
P.5 1 Lot Rig Office Yes Mandatory/Milik Sendiri
- Suitable room for work in 24 hours.
- C/w Meeting Room, Table/Deck, Chair, Sofa Guest and AC.
- Computer, Printer, Papers, Stationary, Odners, Bookcase, White Board for
work
- Radio Compartment & Table
P.6 4 Unit Portable Communication or Handy Talky
- Requirement : Min. 4 unit Handy talky
- Will be used by: Rig Supt/Tool Pusher, Co-Man, Driller, and Rig Office.
- Handy talky for comunication onsite, include registration to authority
P.7 1 Set Internal Radio Communication Equipment
- For communicating between drilling unit and base camp
- Include: intercom, megaphone (Toa or equivalent)
P.8 1 Lot Lighting for Wellsite and Camp
- Sufficient lighting at Wellsite and Camp area to allow Operation at night
- C/w explosion proof system and meet API Standard.
2
BIAYA/ HARI
NO. URAIAN JUMLAH UNIT
(Rp)
1. MOBILISASI 1 LS
2. TARIF HARIAN OPERASI (THO) 9 HARI
3. TARIF HARIAN SIAGA DENGAN CREW (THS) 0 HARI
4. TARIF HARIAN RIG UP/RIG DOWN, MOVING (THRU) 6 HARI
5. DEMOBILISASI 1 LS
TOTAL:
(Rupiah : ……)
TOTAL BIAYA
(Rp)

-
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
A RIG CARRIER EQUIPMENT
Rig Name : Any
Rig Type : Truck / Trailer Mounted
Capacity : Min. 250 HP
Manufacturer/Model : Any
Year to Built : Any
The Rig is capable to be used for :
- Workover at min. 1,000 m depth with 2-7/8" DP
- Woking string inside Casing : C306 and DP 3-1/2"
- Using Tubular : Drill Pipe size of 2-7/8"; Drill Collar size of 3-1/2"; Tubing size
of 2-7/8".D32
(see well diagram)
A.1 1 Unit Rig Carrier Yes

- Manufacturer/Model : Any
- Brakes : Air brakes in all wheels
- Steering Hydraulic Powered
- Axles :
* Front : Any (axles),
* Rear : Any (axles)
- Number of Wheels : Any (each)
- Tires Types : Rough / Mud Terrain
- Tires Condition : Steering types shall be new / near new
- Transmission : Min. 3 speed
- Carrier Enginee also powered for Drawwork : Yes / No
- Hydraulic leveling jacks : Required
- Size Length x Width x Height : Any (ft)
- Total Weight (include Drawwork & Mast) : Any (Ton)
A.2 1 Unit Drawworks Yes

- Capable of work on string to a min. depth of 1,000 m, with 2-7/8” Tubing (J-55,
6.5 ppf) with weight in air of 32,000 lbs or 2-7/8” DP (Grade G, 10.4 ppf) with
weight on air of 52,000 lbs. The drawworks power must be sufficient to trip drill
pipe in open hole at 60 ft/min with at least 20% spare capacity.

- Drum : Double
- Manufacturer/Model : Any
- Main Drum Barrel : Any (inch) x Any (inch) long
- Main Drum Brakes : Ø Any (inch) x Any (inch)
- Hoisting Speed : Any (speeds)
- Input HP Rating : Min. 250
- Cooling system : Independent tank
- Grooving on Main Drum : 1” – 1-1/8”
- Single Load Line Capacity : Any (lbs)
- With Cathead 2 ea min or hydraulic to make up & break out
- Auxiliary Brake / Hydromatic Brake
- Crown Block Safety Devices
- Independent fresh water cooling system for Drawwork and Aux. Brake.
- Crown-O-Matic automatic disengaged clutch and activate brake
- C/w Prime Movers (engines)
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
- Emergency Shutdown
- In compliance with API 7K
A.3 1 Unit Drawworks Motor / Prime Mover Yes

- Manufacturer/Model : Any
- Powered by : Electric Motor or Engine
- Number of engine : Any
- Continuous rating, hp : Any
- Intermittent rating, hp : Any
- Cooling system: Independent tank
- Input horse power : Any
- C/w torque converter and spark arrestor
A.4 1 Reel Sand Line Yes

- Manufacturer/Model : Any
- Cable size : 9/16"
- Length : Min. 6,000 ft.
A.5 1 Unit Air Compressor Yes

- Manufacturer/Model : Ingersol Rand or equivalent


- The air system is powered by a Compressor driven by the Engine, with 15 HP
per unit and 200 gal receiving vessel
- C/w all necessary piping and controls.
B MAST
B.1 1 Unit Rig Mast Yes

- Raising method : Telescopic or specify


- Manufacturer/Model : Any
- Clear working height : Min. 60 ft
* enough to accommodate 2 jts pipe of R-2 per stand
- Fingerboard/Racking Platform Capacity : Able to stand 2-7/8” Tubing, 6.5 ppf,
R-2 with min. 1,000 m
- Hook load : Min. 100,000 lbs
- Set back capacity : Min. 100,000 lbs
- Crown Block Rating : 100 ton
- Crown Sheaves : Min. 4 ea
- Groove Line size : Any (inch)
- C/w Crown safety platform and handrails laders to crown, traveling block
carrying cradle
- Hydraulic outriggers : able for min. 50 mph wind velocity and all guide lines

- In compliance with API 4F


B.2 1 Lot Standpipe & Manifold Yes

- Standpipe & Manifold : Min. 3" x 3,000 psi


- Rotary Hose : Min. 2-1/2" ID x 3,000 psi x 55 ft
B.3 1 Lot Lighting for Derrick Mast Yes

- Sufficient lighting at Derrick to allow Operation at night


- C/w explosion proof system and meet API Standard.
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
C SUBSTRUCTURE
C.1 1 Unit Substructure Yes

- Manufacturer/Model : Any
- Steel Fixed or Telescopic Structure
- Clear woking height under rotary beam : Min. 16 ft height (sufficient space to
accommodate BOP stack height Class III, consist of Bell Nipple, Annular,
Double Rams, Spool)

- Capable of handling 150,000 lbs combined load (rotary + setback)


- Setback capacity : Min. 65,000 lbs
- Dimension of Floor Length x Width : Any (ft)
- Consist of: Rotary Table Base, Setback Base, Mast Base, Wind Board,
Handrails, Ladders, Flee Way, DP Sliding Way and Individual Rig Base, etc,.
with Rat Hole and Mouse Hole positions, 2 (two) sets Tong Posts, Trolley and
Rails for installing the BOP’s in the base.
- In compliance with API 4F
C.2 1 Unit Loading Ram Yes

- Size Length x Width x Height : Any (ft)


- Loading ram matched to rig carrier, derrick base and substructure, have
secure connection integrity with the substructure to ensure substructure and
mast stability.

C.3 1 Set Working Platform Yes

- Manufacturer/Model : Any
- Adjustable Steel Platform
- Dimension of Floor Length x Width : Any (ft)
- Static Load : Min. 5,000 lbs
- Clear woking height : Min. 16 ft height (or sufficient space to accommodate
BOP stack height Class III, consist of Bell Nipple, Annular, Double Rams, Spool)

C.4 1 Unit Dog House


- Type : Steel fixed or equivalent
- Dimension Length x Width : Any (ft)
C.5 1 Unit Anti Spark V-Door & Cat Walk Yes

- Standard Type
- Dimension : Any (ft)
C.6 1 Lot Lighting for Substrucure and Drill Floor
- Sufficient lighting at Substrucure and Drill Floor area to allow Operation at night

- C/w explosion proof system and meet API Standard.


D ROTARY / TRAVELLING EQUIPMENT
D.1 1 Lot Rotary Table Yes

- Manufacturer/Model : Emsco or equivalent


- Rotary Table Opening : Min. 17-1/2" opening
- Number of electric motor : Any
- Rotating Speed, RPM : Max. 120 rpm
- Static Load cap. : Min. 100 Ton
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
- Master Bushing Type : Split
- Split Insert Bowl Bushing for size : Drill Collar 3-1/2”; Drill Pipe 2-7/8”, Tubing
3-1/2" and 2-7/8"
- Transmission : Any
- Torques limit & readout : Any
- Rotary table equipped with working rotary torque gauge measuring in ft.lbs

D.2 1 Unit Crown Block Assembly Yes

- Number of Sheave : Any


- Drilling Line : Any (inch)
- Drilling line length min. 3,000 ft
- Match with Drawork Drum and Drilling Line
- Drilling line compliance with API Spec 9A
D.3 1 Unit Travelling Block & Hook Yes

- Manufacturer/Model : Any
- Death strength rating Capacity : Min. 75 ton
- C/w standard and extra long Links for cementing
- All Elevator Links rated for min. 75 ton
- Match to Drum and Mast
D.4 1 Each Swivel Yes

- Manufacturer/Model : Any
- Capacity : Min. 100 ton
- Pressure rating : Min. 3,000 psi
- Length : Any (ft)
- Able to connect to Kelly
D.5 1 Each Kelly 3-1/2" (with scabboard)
- Model : Square or Hexagonal
- Length : 34 - 40 ft working space
- Drive Bushing matched to Rotary Table
- C/w Upper & Lower Kelly Cock
D.6 2 Each Hoist
- Type : Hydraulic or Pneumatic hoist
- Wire rope size : Any (inch)
- Capacity : Min. 6,000 lbs each
- C/w brand new cable and a guide to ensure the cable is properly wound on the
drum when hoist is operated
- For pneumatic hoist, a separate dedicated compressor & suitable size air tank
must be provided to operate hoist only
E PUMP AUXILARIES
E.1 1 Unit Mud Pump Yes

- Manufacturer/Model : Emsco, National Oilwell, Gardner-Denver, Ideco or


equivalent
- Skid Mounted, Triplex Pump
- Input horsepower rate : Min. 400 HP
- Operating pressure : Min. 1,500 psi
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
- Operating rate : Min. 350 gpm
- Each Triplex Pump complete with the following :
* 1 (one) each Pulsation Dampener c/w Pressure Gauge on input and output,
Specify
* 1 (one) each Flooded Suction provided by independently driven electric
motor or belt driven centrifugal pumps
- Provided with replacement Liners : 6-1/2", 6", 5"
- Transmission : Hydraulic Torque Converter
- Slow pump rate capability : Any spm (for killing rate)
- Pump Stroke Counter
- Vibration Hoses on Discharges rated 3,000 psi c/w Safety Hobble Chain
- Pressure Gauge on discharge line
- Discharge Manifold, from Mud Pumps to Stand Pipe and Kill Line.
- Remote operated system
- Manufacturer API certified
E.2 1 Unit Mud Pump Prime Mover Yes

- Manufacturer/Model : Caterpillar, Detroit, Cummin or equivalent


- Capacity : Min. 400 HP
- All engine c/w hydro mechanical & air intake shut off device
E.3 1 Unit Water Pump
- Manufacturer/Model : Any
- Skid Mounted, Portable Water Pump
- Powered by Diesel Engine
- Capacity : Min. 20 GPM
E.4 1 Unit Fuel Tank Yes

- Skid mounted with lifting lugs, steel construction


- Capacity : 7,000-10,000 liter/unit or enough capacity to supply fuel for 7 days
of operation
- Equipped with clear Fluid Level Indicator, Flowmeter, electric transfer pump,
Hose Gun and Locking System
E.5 1 Lot Lighting for Mud Pump and Fuel Tank
- Sufficient lighting at Mud Pump and Fuel Tank area to allow Operation at night

- C/w explosion proof system and meet API Standard.


F MUD TANK AND SOLID CONSTROL SYSTEM
F.1 2 Unit Mud Tank Yes

- Tank Capacity : Min. 180 bbls each


- Total Capacity : Min. 360 bbls
- Type : Trailer or Skid Mounted
- Number of Compartement : Min. 2 each
- Separate compartement for :
* 1 (one) each Trip Tank (c/w level indicator).
* 1 (one) each Mixing Tank, Cap. 100 bbls, c/w Hopper, Agitator, Centrifuge
Pump 50 HP.
* Other compartement, c/w Agitator
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
- Mud tank and mixing area equipped with adequate lighting for full visibility
during night operations (light fixtures on tank and shaker area capable of being
rotated and aimed)

- Mud tank/mixing area must be equipped with eyewash station and chemical
safety shower
- Specify dimension each Mud Tanks (length x width x height)
F.2 1 Unit Mud Hoppers & Mixing Pump Yes

- For active and pre-mix tanks with separate suction lines and flexible / separate
discharge lines
- C/w fluid and chemical shearing devices using impingement plates, piping,
valves, sack support.
- Dedicated centrifugal pump and 60 HP electric motor
F.3 1 Set Mud Agitator Yes

- One each per compartment, except sand trap


- Able to provide 65-85 second turnover rate, with explosion proof electric motor.

- Motor control boxes must be housed in explosion proof boxes.


F.4 1 Set Mud Manifolds
- Unitized 3", 3000 PSI for standpipe, kill line and fill line complete with sufficient
valves to direct mud flow as needed
- All hammer union connection
F.5 1 Unit Shale Shaker
- Manufacturer/Model : Any
- Linear Motion
- Each shaker capable of handling min. 400 gpm (total 400 gpm) of 8.4 – 9.2
ppg water base mud with 120 mesh screen
- Equiped with adjustable deck angle up and down
- C/w explosion proof vibrating electric motor and has jet sprayer system for
screen cleaning
- Preferable manufacturer : Derrick / Brandt / Swaco / Fluid System Inc.
F.6 1 Lot Screen Mesh
- Contractor must provide shaker screen in size and quantity for each well as
below :
* Screen 120 Mesh, Flat Type
* Screen 180 Mesh, Flat Type
- In compliance with API 13C
F.7 1 Set Cellar Jet System
- Standard type for oil field to drain cellar or pit
- Connected to vaccuum or centrifuge pump
F.8 1 Unit Water Storage Tank Yes
- Skid Mounted Water Tank
- Capacity : Min. 180 bbls capacity each
- C/w Centrifugal Transfer Pump (specify pump), hoses, standpipe/manifold,
visual sight level monitor
- 1 (one) separate portable water tank internally plastic coated for camp facility

F.9 1 Lot Lighting for Mud Mixing


DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
- Sufficient lighting at Mud Mixing area and Tanks to allow Operation at night
- C/w explosion proof system and meet API Standard.
G BLOW OUT PREVENTER EQUIPMENT AND OPERATING UNIT
All BOP Equipment or Accessories should be suitable with Company's Wellhead
equipment (see Company's Wellhead equipment drawing) and c/w valid BOPE
certification and API certified manufacturer.

G.1 1 Unit Annular BOP 11" - 3K or 5K psi WP Yes

- Manufacturer/Model : Any
- Type and Pressure Rating : Any
- Connection Top and Bottom : Any
- Rubbers elements : 1 ea used and 1 ea spare
- Dimensions Height : Any (ft)
G.2 1 Unit Single Ram BOP 11" - 3K or 5K psi WP Yes

- Manufacturer/Model : Any
- Type and Pressure Rating : Any
- Connection Top and Bottom : Any
- Dimensions Height : Any (ft)
G.3 1 Lot Pipe and Blind Ram Stock for BOP 11” - 3K or 5K psi WP
- Blind rams : 2 set
- Type and Pressure Rating : Any
- Pipe rams 2-7/8" : 2 set
- Pipe rams 3-1/2" : 2 set
- C/w spare set of front packer, top seal and ring gasket as required
G.4 1 Unit Annular BOP 7" - 3K or 5K psi WP Yes
- Manufacturer/Model : Any
- Type and Pressure Rating : Any
- Connection Top and Bottom : Any
- Rubbers elements : 1 ea used and 1 ea spare
- Dimensions Height : Any (ft)
G.5 1 Unit Double Ram BOP 7" - 3K or 5K psi WP Yes
- Manufacturer/Model : Any
- Type and Pressure Rating : Any
- Connection Top and Bottom : Any
- Dimensions Height : Any (ft)
G.6 1 Lot Pipe and Blind Ram Stock for BOP 7” – 3K or 5K psi WP
- Blind rams : 2 set
- Pipe rams 2-7/8" : 2 set
- Pipe rams 3-1/2" : 2 set
- C/w spare set of front packer, top seal and ring gasket as required
G.7 1 Unit Accumulator Unit Yes
- Manufacturer/Model : Any
- Skid Mounted and covered in area
- Working pressure 3,000 psi with capacity min 80 gallon
- Capable to close-open-close BOPE, without electric system, as per API
- Min. 4 station, Compressor automatically start, with remote control in rig floor

- Pneumatic pump : 2 sets


DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
- Driven charge pumps : Triplex pump 15 HP
- Electric driven pumps : 1 unit, 15 HP
G.8 1 Unit Choke Manifold and Killing Line (Back Pressure Manifold) Yes
- 2" x 3" - 3K psi WP all arrangement as per API Spec
- 2 set manual choke with console 3-1/8” - 3K psi WP
- 1 set manual adjustable choke and positive choke
- C/w Hammer Type Union / Flexi Hose / Hard Pipe 3" - 3K to Mud Cross
G.9 1 Each Check Valve 2"-3K
- Check Valve to be installed in Kill Line
G.10 1 Lot Adaptor Spool & Double Studded Adapter Flange (DSAF)
- Contractor is responsible to provide all necessary adapters to match with its
Contractor's BOP equipment to Company's Wellheads, include with:
* 11" 5K x 11” 3K : as required
* 11” 3K x 7-1/16” 3K : as required
* 11” 3K x 7-1/16” 5K : as required
* 7-1/16” 5K x 7-1/16” 3K : as required
* 7-1/16” 3K x 7-1/16” 3K : as required
- All connection must be match with BOP Stack
G.11 1 Unit Hydrotest / BOPE Test Pump Yes
- BOP test pump c/w 3000 psi piston pump, capable 4 gpm at 3000 psi, relieve
valve, low pressure suction hose, 3000 psi piping to connect to BP, chart
recorder with max. 3000 psi, time clock setting, pressure gauge 0-500 psi and 0-
5000 psi.
- C/w spare or inventory paper chart and using accumulator pump is not
acceptable.
G.12 1 Lot Bell Nipple & Flow Line Yes
- Bell Nipple & Flow Line as required
G.13 1 Lot BOP Sucker Rod Yes
- As required
G.14 1 Lot Tester Cup
- For Casing 9-5/8", 6-5/8", 5-1/2", 4-1/2"
- Type F or as required
G.15 1 Lot Lighting for BOP
- Sufficient lighting at BOP area to allow Operation at night
- C/w explosion proof system and meet API Standard.
H GENERATOR SET & ELECTRICAL EQUIPMENT
All electrical instrument/equipment and lights must in compliance with API
RP54, API RP500.
H.1 1 Set Genset for Workover/Well Service Activities Yes
- Manufacturer/Model : Any
- Skid mounted Genset with generator house
- Capable to supply power requirements of Workover/Well Service activities
(including Rig Camp Facility)
- Continuous rating Capacity: min. 300 KVA at 60 Hz or equivalent
- Spark Arrestor, covers with Thermo Cover and Silencer.
- C/w Panel Box, Junction Box, lifting lugs, safety and protection shutdowns, fuel
tank, explosion proof lighting.
- Genset will also supply power for: rig equipment, instrument, solid control
motor, portacamp, etc.
- If generator fail to provide sufficient power, Contractor responsible to provide
additional power supply at its own cost.
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
H.2 1 Set Genset for Moving Activity Yes
- Manufacturer/Model : Any
- Portable Genset
- Capacity : min. 10 KVA or equivalent
- Capable to supply power during rig moves.
H.3 2 Set Lighting for Moving Activity
- Mobile tower Lighting and Genset min. 4 KW
- Tower lighting c/w 4 each of light with min. 400 W for each light and capable to
rotate 360 degrees
- C/w explosion proof system
H.4 1 Lot Rig Lighting
- Contractor must provide all adequate lighting, including but not limited to:
Derrick & Substructure, Mud Pump, Mud Mixing, Mud Tanks & Pits, Genset,
Fuel Tank, Pipe Rack, BOP, Drill Floor, Rig Office and Camps.
- All lighting provided c/w explosion proof system
- If the lighting provided is insufficient, Contractor responsible to provide
additional lighting at its own cost.
I INSTRUMENT
I. Driller's Console Instrumentation
I.1 1 Each Weight Indicator (with Calibration Certificate) Yes
- With cap. 0 - 200,000 lbs
- C/w Hook Load and WOB
I.2 2 Each Mud Pump Pressure Gauge
- With 0 - 5000 psi
- Placed at console and standpipe manifold
I.3 1 Each Pump Stroke and Rate Counter
- For indicating Pump SPM & Rate GPM
- With 0 - 200, for each pump
I.4 1 Each Rotary Torque Gauge
- With 0 - 20,000 ft.lbs
- c/w sensatory
I.5 1 Each Rotary Tong Torque Gauge
- Range, ft.lb : Any
I.6 1 Each RPM Gauge
- With 0 – 300
J DRILLING STRING
All equipment should be matched to support required Drilling String connection

J.1 1 Lot 2-7/8" Drill Pipe Yes


- Requirement length : Min. 3600 ft
- Number of joints : Min. 120 Jts
- API Specification : Size 2-7/8", Grade G105, IF Connection, 10.4 ppf,
Premium Class, Pipe R-2
- Hard Banding : Smooth, flush, fine particle, non abrasive
- C/w of Internal Coating, Thread Protectors & current inspection report
J.2 2 Each 2-7/8" Pup Joint Drill Pipe Yes
- Number of joints : 2 jts for each size length
- API Specification : Size 2-7/8", Grade G105, IF Connection, 10.4 ppf,
Premium Class, Pipe R-2
- Length of : 10 ft and 15 ft for each sizes
- C/w Thread protector & current inspection report
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
J.3 1 Lot Drill Collars 3-1/2" Yes
- Number of joints : min. 10 joint (including for spare)
- API Specification : Size 2-7/8" OD x 1-1/4" ID, Spiral Type, IF Connection, 18
ppf, Premium Class, Pipe R-2
- C/w Thread protector & current inspection report
J.4 1 Lot Crossover Sub Yes
- Related to required drilling string
J.5 1 Lot Lifting Sub Yes
- As required
J.6 1 Lot Circulating Head for Drill Pipe Yes
- Requirement : 1 (one) each for required size.
- For Drill Pipe size of : 2-7/8"
J.7 1 Lot Circulating Head for Tubing Yes
- Requirement : 1 (one) each for required size.
- For Tubing size of : 2-7/8", 3-1/2”
J.8 1 Lot Inside BOP 3K psi for Drill Pipe Yes
- Requirement : 1 (one) each for required size.
- For Drill Pipe size of : 2-7/8"
- To be ready at the rig floor with same connection of Drill Pipe usage
J.9 1 Lot Inside BOP 3K psi for Tubing Yes
- Requirement : 1 (one) each for required size.
- For Tubing size of : 2-7/8" or 3-1/2"
- To be ready at the rig floor with same connection of Tubing usage
J.10 1 Lot Full Opening Safety Valve 3K psi Yes
- 1 (one) ea to be ready at the rig floor with same connection for Drill Pipe (2-
7/8") and Tubing (2-7/8", 3-1/2”) usage.
J.11 3 Set Pipe Rack
- Adequate for Drill string, Tubing, Sucker Rod
- Pipe racks must be designed and built as per engineering calculation to handle
the loads required and shall have clear identification of the capacity
J.12 1 Lot Pipe Box
- Enough quantity to support all drill string
- Adequate for drill string, casing and tubing
J.13 1 Each Derrick Tape
- Steel type with 100 ft length
J.14 1 Lot DP Float
- Requirement: 1 (one) each for required size.
- Match for Bit Sub
J.15 1 Lot DP Pipe Wiper
- Requirement : 1 (one) each for required size.
- Rubber type
- Match for Tubing and DP
J.16 1 Lot Mud Bucket
- Standard type
- Mud bucket or mud saver c/w seals for DP 2-7/8"
- Suitable for all pipe sizes and can be handled by one person
J.17 1 Lot Drift
- Requirement : 1 (one) each for required size:
* DC : 3-1/2"
* DP : 2-7/8"
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
* Tubing : 2-7/8", 3-1/2”
K HANDLING TOOLS
All equipment should be matched to support required Drilling String and Casing
String
K.1 1 Set Rotary or Manual Tong (2 ea) Yes
- Manufacturer : BJ type C or equivalent
- C/w jaws for :
* DC : 3-1/2"
* DP : 2-7/8"
* Tubing : 2-7/8", 3-1/2”
K.2 1 Set Hydraulic Power Tong Yes
- Manufacturer : Universal or equivalent
- For Tubing : 2-7/8", 3-1/2”
- For Pipe: 2-7/8" DP, and 3-1/2" DC
K.3 2 Set Rotary Slip Yes
- Fit to Rotary Table Bushing
- Manual type, for:
* DC : 3-1/2"
* DP : 2-7/8"
* Tubing : 2-7/8", 3-1/2”
- C/w spare element, dice
K.4 1 Lot Elevator Link Yes
- Requirement : 1 (one) set for required size
- 1 (one) set of Size : min. 1-3/4" x 72", cap. 100 ton
- Weldless (non welding), Matched to Block
K.5 1 Lot Elevator Yes
- Capacity : min. 100 Ton
- Requirement : 2 (two) set for required size:
* DC : 3-1/2”
* DP : 2-7/8"
* Tubing : 2-7/8" and 3-1/2”
K.6 1 Lot Spider Slip Yes
- For Tubing : 1 (one) set
* Tubing size : 2-7/8"and 3-1/2", with 85-100 ton capacity
K.7 1 Lot Safety Clamp Yes
- Capacity : min. 100 Ton
- Requirement : 1 (one) each for required size:
* DC : 3-1/2”
* DP : 2-7/8"
K.8 1 Lot Bit Breakers and Ring Gauges
- Requirement : 1 (one) each for required size:
- For TCB size : 6-1/8", 6"
K.9 1 Lot Bit Sub
- Requirement : 1 (one) each for required size:
* 2 (two) ea Bit Sub for use with 3-1/2" Drill Collars bore for float, c/w float valve

- Contractor should provide a complete list of all subs to be provided, with full
dimensions.
K.10 1 Set Sucker Rod Hook Yes
- Capacity: Min. 25 tons.
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
K.11 2 Set Sucker Rod Elevator Yes
- Capacity: Min. 25 tons.
- To handle Sucker Rod size: 5/8”, 3/4”, 1”
K.12 2 Set Sucker Rod Wrench Yes
- To handle Sucker Rod size: 5/8”, 3/4”, 1”
K.13 1 Set Power Sucker Rod Tong Yes
- C/w Jaw for Sucker Rod size: 5/8”, 3/4”, 1”
K.14 1 Lot Miscelaneous Wrench, Tools, Keys
- All necessary miscellaneous wrench, tools, keys to support rig and operation
activities.
L SAFETY & FIRE EQUIPMENT
L.1 2 Set Derrick Safety Belt Yes
- Derrick belt and offshore tower type full body hardness with anti blood stop
strap, c/w shock absorber type lanyard with appropriate length
L.2 2 Set Safety Chair / Escape Device Yes
- Retractable type escape device with automatic brake system is prefered
- Installation shal minimum comply API RP 54
- User must be secured with full body harness when descending
- C/w 1/2" line matched to escape device and derrick height and escape pole as
necessary
L.3 2 Set Climbing Harnesses Yes
- Climbing harnesses with leg and shoulder straps manufactured to international
standard with anti suspension trauma strap
- C/w sock absorber lanyard and big hook
L.4 2 Set Fall Prevention Device Yes
- Fall prevention device manufacture to international standard, matched t derrick
height and intalled on the derrick
- Counterweights are not acceptable, inertia reel type is preferred.
L.5 1 Each Stretcher
- Light weight, durable, folded type, can be used to bring patient from high
elevation,
- Fit in the space at dog house & rig medical room.
- C/w full body straps, bride slings, blankets
L.6 2 Each Windsock
- Standard type
L.7 1 Set Multi-Gas Detector
- With all standard accessories for detecting methane, H2S and CO2, digital
sound alarm
- C/w charger and approved by authorized agent, and Contractor responsible to
perform calibration as per manufacturer recommendation
L.8 2 Unit Portable Rig/Bug Blower
- Size 48”
- C/w explosive proof system, housing and electric cable sufficient to place
anywhere in immediate rig area
L.9 2 Set 30 Minutes Self Containt Breathing Apparatus (SCBA)
- C/w Accessories and 1 (one) each spare bottle each set
L.10 1 Set 10 Minutes Self Containt Breathing Apparatus (SCBA)
- C/w accessories and will be placed on Monkey Board
L.11 2 Each Portable Eyewash
- Portable Eyewash
L.12 1 Each Safety Shower
- Standard type with water supply
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
- Located in mud tank area
L.13 1 Lot Security Portable Shack
- Small portable shack for security entrance gate and access control post
- Include electric lamp, explosive proof, c/w bulletin board uniform, flash light,
plastic chain, yellow line, grounding system, hand glove, safety head, safety
glasses, ear plug and visitor badge
L.14 1 Set Muster Point Shelter
- Standard type
L.15 1 Set Emergency Alarm
- Standard type
L.16 1 Each Personnel On Board
- Standard type
L.17 1 Lot Safety Warning Sign
- Contractor should provide any safety information or sign whenever a hazard or
danger can't be avoided adequately or reduced in another way at site or rig
location.
- Sign should be in English and Bahasa Indonesia, including: safety/health,
signboard, prohibition, warning, mandatory, plastic police line, lock out tag out
and other information.
L.18 1 Lot Personnel Protection Equipment
Contractor must provide replacement or spare material when original issue is
not acceptable to Company.
A). PPE Per Crew Member, include:
* 1 (one) set Safety Hat. Meet standard ANSI Z.89.1, top guard type protect
hazards of impact and penetration from falling & flaying object, limited electric
sock & burn chain strap is required for Derrick Man. Different color for: Site
Personnel, New Worker, HSE team and Visitor.
* 1 (one) pair Safety Glasses for eye protection, with general purpose plastic
lenses. Meet SNI or ANSI standard.
* 1 (one) pair Ear Plug or Ear Protection.
* 2 (three) pair/person/year Coverall FRC (Flammable Retardant Coverall).
Material standard: EN 531, EN 533, NFPA 2112. Material weight: 7.5 oz/yard.
Color: based on Contractor color. Coverall style: Long sleeve with half
elasticated at waist, two front chest pocket, two front leg pocket, two rear leg
pocket, one pen sleeve pocket. Reflective tape: Scocthlite-Silver Flame
Resistance 2 inch width at around arms, legs and shoulders/back coverall.
Embroidery: Contractor logo at front left chest and back coverall, Employee
name on front right chest, Indonesian flag at upper right sleeve.

* 1 (one) pair Standar Hand Gloves. Cotton polka dot. Purpose for light general
maintenance. Including replacement supplies if material is damaged, dirty or
non feasible to use
* 1 (one) pair Safety Shoes. Good condition, use safety toe and oil resistant.
Meet SNI or ANSI standard.
B). PPE for Specific Work
* 1 (one) pair General Purpose Safety Goggles, for personnel who handle
chemicals. Non-ventilated type, polycarbonate spectacle, clear lenses,
elastis/rubber head band, lenses cleaner. Meet SNI or ANSI standard.

* 1 (one) pair Earmuff, for personnel who works on high noise area. Earmuff can
be attached to safety helmet.
* 1 (one) each Industrial Dust Mask, for personnel who handle chemicals.
Organic vapor respirator dust for respirator. Surgical face masks are prohibited.
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
* 1 (one) each Full Face Shield and Apron, for personnel who handle grinding
activity or certain hazard from material transmitting. Shield can be attached to
safety helmet.
* 1 (one) pair Chemical Rubber Hand Gloves, for personnel who handling
chemical and goods at oil industry activities.
* 1 (one) pair Rain Coat, for personnel who works on rainy weather. Include shirt
and pants.
* 1 (one) lot Welding Protective Equipment, for welding activity. Including full
face helmet and goggles, respirators, jacket or leather apron, gloves.

* 2 (two) pair High Voltage Resistant Safety Gloves, for personnel who works on
high voltage electricity/equipment. Provide for electrician and assistant.

L.19 2 Box Standard First Aid (P3K)


- In compliance with SNI-19-3994-1995, include with standard of medical
equipment Box III and drugs Box III.
- C/w snake bite kit
L.20 1 Lot Burn Pack
- Standard type
L.21 1 Each Water Gel Burn Dressing
- Model 30-100
- Consist of : 1 set of 8" x 18" Water Jel and 1 set of 2" x 6" Water Jel
L.22 2 Each 30 Minutes Oxygen Bottles / Respiratory Aid
- Oxygen bottles c/w accessories for breathing assistance during emergency
and medical operations.
- In compliance with Kepmen Kesehatan RI No. 1439/MENKES/SK/XI/2002
L.23 10 Each 9 Kg Dry Chemical Fire Extinguisher for outdoor

- Dry Chemical Type, ABC Fire Class


- Will placed at area of : Dog House, Rig Floor, Shale Shaker, Mud Pump,
Drawwork, Genset, Warehouse, Fuel Tank, Welding Shop

- C/w working presssure gauge and cover/stand for each unit.


L.24 2 Each 9 Kg Dry Chemical Fire Extinguisher for indoor
- Dry Chemical Type, ABC Fire Class
- Will placed at area of : Rig office and Portacamp (1 each for every 2 separate
rooms)
- C/w working presssure gauge and cover/stand for each unit.
L.25 4 Each 5 Kg CO2 Fire Extinguisher
- CO2 Type, BE Fire Class
- Will placed at area of : Genset (2 each for genset room or electrical apparatus
room)
- C/w working presssure gauge and cover/stand for each unit.
L.26 2 Unit 75 Kg Fire Extinguisher
- Dry Chemical ,Type ABC
- Wheeled carriage c/w hose min. 5 m, nozzle, trolley, housing.
- c/w Working Pressure Gauges and other accessories
L.27 1 Each Fire Axe
- Standard type
L.28 1 Each 5 Lbs Brass / Copper Hammer
- C/w wooden handle
L.29 4 Set Fire Suits
- Standard type
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
M TRANSPORTATION AND HEAVY EQUIPMENT
I. Daily Operation
M.1 1 Unit Oil Field Truck 30 ton
- 1 (one) unit
- Tandem or Tronton, c/w Winch
M.2 1 Unit Boom/Foco Truck 20 ton
- 1 (one) unit
- Boom capacity min. 6 ton
M.3 1 Unit Crane 30 Ton
- Capacity : 30 Ton
- Structure : Telescopic or Fixed
- Mobility type : Truck/Wheel
M.4 1 Unit Car or Light Vehicle 4x4
- 1 (one) unit for Company Man and Rig Superintendent (Operation)
- Built min. Year 2017
- C/w spare tire, standard car auxiliaries, safety equipment, light fire
extinguisher, etc.
M.5 1 Unit Crew Bus
- Capacity : min. 15 seats
- C/w seat safety belts, spare tire, standard car auxiliaries, safety equipment,
light fire extinguisher, local license plate, etc.
M.6 1 Unit Vacuum Truck
- Capacity min 10,000 ltr
- Drive: 4 x 6 WD
- C/w offroad tyre and spare, light, pumps, safety equipment, light fire
extinguisher, etc.
N MISCELLANEOUS AND FISHING EQUIPMENT
Contractor must provide Fishing equipment required and all equipment should
be able to catch BHA fishing neck components and to use at inside:
Open Hole : 8-1/2", 6-1/8", 6";
Casing: 9-5/8", 6-5/8", 5-1/2", 4-1/2"
Tubular: DP 2-7/8”, DP 3-1/2", DC 3-1/2”, Tubing 2-7/8” or 3-1/2”
N.1 1 Set Overshot
- Requirement : 1 (one) each for required size
- External catch fishing tools, match with tubular dimension.
- Type : Bowen Series 150 or equivalent
- C/w spiral and basket grapple to fish from 2-7/8" to 4-3/4" OD pipe
N.2 1 Set Taper Tap
- Requirement : 1 (one) each for required size
- Internal catch fishing tools, match with tubular dimension.
- Type : Bowen Rotary Tapper Taps or equivalent
- Application for inside diameter of tubular 2-7/8" to 4-3/4" OD pipe
N.3 1 Seet Junk Sub
- Requirement : 1 (one) each for required size
- Catching object that to heavy to be circulated
- Type : Bowen or equivalent
N.4 1 Set Fishing Magnet
- Requirement : 1 (one) each for required size
- Catching object by magnetic attraction.
N.5 1 Set Impression Block
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
- Requirement : 1 (one) each for required size
- Obtain impressions and identify the objects.
N.6 1 Set Fishing Jar
- Requirement : 1 (one) each for required size
- Deliver an upward blow and optimize jarring force.
- Size : 4-3/4"
N.7 1 Set Bumper Sub
- Requirement : 1 (one) each for required size
- Allows full torque and unrestricted fluid circulation
N.8 1 Set Sucker Rod Overshot
- Requirement : 1 (one) each for required size
- Engaging and retrieving sucker rods, couplings, and similar items from inside
tubing strings 2-7/8".
- Type : Bowen Series 10 or equivalent
- C/w spiral and basket grapple to fish for SR 3/4" & 5/8"
N.9 1 Lot Swabbing Tool / Equipment Complete : Yes
- For swabbing job in Tubing: 2-7/8", J-55, 6.5 ppf.
- Consist of : Ratting rod 3” BOP, BOP RAM 1/2” to 9/16”, Oil saver, Weight
Bars and Knuckle Joint, 5M Gate Valve, 15 Lubricator Barrel, Swage 3-1/2”
8RD EUE to 2 7/8” EUE 8RD, Swabbing Mandrel for 2-7/8”
N.10 1 Each Depthometer
- 1 (one) each
N.11 1 Each 9-5/8" Casing Scraper
- Casing Scraper for 9-5/8", 36.0-40.0 ppf
N.12 1 Each 6-5/8" Casing Scraper
- Casing Scraper for 6-5/8", 17.0-24.0 ppf
N.12 1 Each 5-1/2" Casing Scraper
- Casing Scraper for 5-1/2", 13.0-17.0 ppf
N.12 1 Each 4-1/2" Casing Scraper
- Casing Scraper for 4-1/2", 9.5-12.6 ppf
N.13 1 Each Tubing Bailer
- 1 (one) each
- For inside Casing 9-5/8", 6-5/8", 5-1/2", 4-1/2" and Tubing Size 2-7/8"
- C/w box bailer
N.14 1 Set Tubular Caliper
- Requirement : 1 (one) each for required size
- To measure Outside Diameter (OD) and Inside Diameter (ID)
O WELDING UNIT
O.1 1 Unit Welding Unit AC/DC and Cutting Torch Yes
- Capacity : min. 300 A
- Cutting Torch : Oxigen, Accetyline
- C/w Mechanical portable workshop, steel construction wth lifting lugs,
workbench, Head Type and Safety Equipment, hand tools
P ACCOMODATION / PORTACAMP AND MISCELLANEOUS
Contractor is to supply :
Fully Air Conditioned camp complete with personnel required to operate such
camp in order to work, feed, and sleep for Company, Contractor and Third Party
on a 24 hours basis.
P.1 1 Lot Company Man/Staff Room
- Separate Room for :
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

RENCANA KERJA DAN SYARAT


Section - 1
Daftar Spesifikasi Peralatan Rig
COMPANY'S REQUIREMENTS STATUS KEPEMILIKAN
NO. BUKAN MILIK
QTY DESCRIPTION MILIK SENDIRI SENDIRI
* Company Man : 1 bed room
* Drilling Engineer : 1 bed room
- Air Conditioner (AC min. 1 PK)
- Work room with Table Desk & Chairs, Electric Stabilizer
- Air Refrigerator, c/w adequate Soft Drink & Daily Food
- C/w Water Supply, Bath Room, Shower, Washtapel, Water Heater for hot
water, Wash Basin (Hand Wash Table), Television set, Cable TV Channel,
Lamp, Electricity, Internet.
- The facility will include meals and lodging, shower and laundry.
- Dimension : Min. 8 ft x 20 ft each room
P.2 1 Lot Rig Contractor's Portacamps / Messroom
- For Rig Contractor's Crews / Personnels
- Contractor at his own cost, must be able to provide shelter/room (i.e rent
house) for the entire contractor's crew or personnel. Contractor shall ensure that
the room is adequate and meets every aspect of Company's HSE. Contractor is
responsible for the safety, security, hygiene and other things on the use of
dwellings place.
- The facility will include meals and lodging, shower and laundry.
P.3 1 Lot PortableToilet
- Min. 2 (twor) room
- For Company's Guest, Crew and Third Party Personel
- Suitablle for Shower and Toilet
- C/w Water Supply, Water Hose/Line, Lavatory Container Bucket, Lamp,
Exhaust Blower
P.4 1 Lot Rig Office Yes
- Suitable room for work in 24 hours.
- C/w Meeting Room, Table/Deck, Chair, Sofa Guest and AC.
- Computer, Printer, Papers, Stationary, Odners, Bookcase, White Board for work

- Radio Compartment & Table


P.5 4 Unit Portable Communication or Handy Talky
- Requirement : Min. 4 unit Handy talky
- Will be used by: Rig Supt/Tool Pusher, Co-Man, Driller, and Rig Office.
- Handy talky for comunication onsite, include registration to authority
P.6 1 Set Internal Radio Communication Equipment
- For communicating between drilling unit and base camp
- Include: intercom, megaphone (Toa or equivalent)
P.7 1 Lot Lighting for Wellsite and Camp
- Sufficient lighting at Wellsite and Camp area to allow Operation at night
- C/w explosion proof system and meet API Standard.

Catatan:
1) Peralatan Mandatory merupakan peralatan yang wajib dimiliki oleh Kontraktor / Peserta Tender dengan status kepemilikan adalah Milik Sendiri.

2) Peralatan yang bukan dalam syarat Mandatory, wajib dicantumkan status kepemilikan dan dilengkapi supporting letter yang berlaku.
3) Panitia akan melakukan inspeksi visual dan mencatat keberadaan ada atau tidaknya peralatan yang ditawarkan oleh Peserta Tender.
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

Mandatory/Milik Sendiri
DOKUMEN TENDER NO. GKM...
LAMPIRAN I-B
RENCANA KERJA DAN SYARAT

ANA KERJA DAN SYARAT

EMILIKAN

KETERANGAN

Mandatory/Milik Sendiri

milikan adalah Milik Sendiri.

ter yang berlaku.


h Peserta Tender.