Note Urci
Note Urci
46-45
1. Agregat lepas 4m – 1 km
2. Rutting di lokasi tanjakan
45-44
43-42
41-40
40-39
1. Pothole
2. Rutting
38-37
1. Loose Aggregate
2. Drainase si tikungan KM 37 sisi muatan.
34-33
33-32
32-31
1. Tikungan di sisi muatan rutting 3 ririk
31-30 Penyempitan
1. Loose aggregate
2. Corrugation sisi muatan
3. Loose Aggregate
30-29
28-27
26-25
1. Loose Aggregate
2. Rutting level Low
24-23
1. Rutting
2. Pothole
3. Tikungan 23 rutting pothole
23-22
1. Loose Aggregat
22-21
20-19
1. Corrugation di tikungan
2. Tikungan 19 corrugation pothole
19-18
18-17
1. Rutting tikungan 17
2. Rutting di tikungan 17
3. Ruttinng simpng km 17 medium severity
16-15
15-14
14-13
13-12
1. Corrugation 75m
2. Pothole low severity
11-10
1. Corrugation
2. Rutting
10-9
9-8
8-7
7-6
1. Nono tengah Rutting level mediau
2. Depan mesjid 1 titik pothole level medium
3. Corrugation level low 6+500 tikungan
6-5
1. Corrigation 50 low m
2. Corrugation tikungan 100 m
3. Rutting medium severity 5 titik
5-4
4-3
2-1------