Professional Documents
Culture Documents
Fieldwork Risk Assessment (Low Risk Activities) Fieldwork Project Details
Fieldwork Risk Assessment (Low Risk Activities) Fieldwork Project Details
Nature of visit
Size of Group, lone working, staff, Postgraduate student working alone
postgraduate, undergraduate
Diyoke Chukwukazom
104 Trinity one
East street
Leeds
LS98AE
Mobile: 07535032319
1
HAZARD IDENTICATION
Identify all hazards specific to fieldwork trip and activities, describe existing control measures and identify any further
measures required.
Transport
Mode of transport Adhere to good road safety regulations
Getting hit by a vehicle or bicycle
Violence
potential for violence (previous incidents etc) N/A
N/A
Individual(s)
medical condition(s), young, inexperienced, N/A
disabilities etc
N/A
Work Pattern
time and location e.g. shift work, work at night Will ensure minimal traffic on the route by conducting the survey
on a Sunday.
Work during the day
Other
e.g. temperature, humidity, confined spaces Warm clothing to be worn
Cold temperature
Supervision
Identify level of supervision required e.g. full
2
time, Periodic telephone/radio contact
N/A N/A
Other Controls
e.g. background checks for site visits
N/A
N/A
N/A
Additional Information
relevant to the one working activity including N/A
existing control measures; information
instruction and training received, supervision,
security, increased lighting, emergency
procedures, first aid provision etc.
N/A
Name:
Assessment carried out by Signature:
Date:
Name:
Fieldwork Activity Organiser /
Signature:
Course Leader e.g. PI, etc
Date: