Description Unit Qty Rate Amount G+1 Multi Purpose Building: A-Sub Structure
Description Unit Qty Rate Amount G+1 Multi Purpose Building: A-Sub Structure
Item
No Description Unit Qty Rate Amount
A-SUB STRUCTURE
1. 0 EXCAVATION & EARTH WORK
Clear and remove top soil to an average depth
1.01 of 20 cm. m² 368.56 31.25 11,517.41
Bulk excavation in ordinary soil to reduce
9.52
1.02 levels to the designed level up to 500mm . m3 164.71 1,568.04
Pit excavation 25 cm away from the max edge
of footing pad at each side in M3….. (100 CM)
1.03 m3 455.22 347.66 158,260.08
Fill around footing and foundation columns
with imported selected materials from out
side well rolled and compacted in layers not
1.04 exceeding 200 mm thick. m3 290.51 195.73 56,861.28
1.05 fill around massonary wall m3 15.00 195.73 2,935.94
selected material fill at an average depth of
1.06 30 cm m3 35.00 195.73 6,850.52
WINDOWS
a) Type W1 Size :1500x1500mm no 14.00 5,850.00 81,900.00
b) Type W2 Size :1000x400mm no 6.00 1,024.00 6,144.00
c) Type W3 Size :1000x1500mm no 2.00 3,840.00 7,680.00
d) Type W4 Size :2500x2600mm no 4.00 16,640.00 66,560.00
DOORS
external
a) Type D1 size 850x2600 mm no 10.00 5,657.60 56,576.00
b) Type D3 size 1300x2600 mm no 2.00 8,652.80 17,305.60
5.2 c)Type D4size 1250x2600 mm no 2.00 8,320.00 16,640.00