CONTROL SYSTEM OPERATION FROM

SL. CONTROL
NO. SYSTEM / PACKAGE SYSTEM SCOPE
TYPE LOCATION LOCAL REMOTE(CCR)

1 DM COOLING WATER SYSTEM EDN DCS CCR-1 , 2 & 3 N Y

ONLINE CONDENSER TUBE CLEANING


2 SYSTEM EDN DCS CCR-1 , 2 & 3 Y Y

3 SELF CLEANING FILTER EDN DCS CCR-1 , 2 & 3 Y Y

4 CHEMICAL DOSING SYSTEM EDN DCS CCR-1 , 2 & 3 Y Y

EDN DCS CCR-1 Y Y


5 MILL REJECT SYSTEM
EDN DCS CCR-2 Y Y

TANKER
DCS (ROAD) Y Y
(LDO & HFO)

6 FUEL OIL HANDLING SYSTEM EDN

DCS (RIO) 5) Y Y

7 CLUBBED AT SR. NO. 17, AS THIS WAS PART OF CLARIFIED WATER PUMP HOUSE ONLY.
DM TRANSPORTATION SYSTEM (DM CCR-1 N Y
8 TRANSFER, STORAGE, BOILER FILL, EDN DCS
HOTWELL MAKEUP) CCR-2 N Y

CWPH-1
(STAGE-1) Y Y
9 CW/ACW SYSTEM EDN DCS
CWPH-2
(STAGE-2) Y Y

DCS (RTU AT
10 CONDENSATE POLISHING UNIT EDN REGENERATION) LCR Y Y

11 OXYGEN DOSING SYSTEM EDN DCS CCR-1 , 2 & 3 N Y

AHU ROOM-1 Y N
PLC 1 & (STAGE-1)
12 AC / VENTILLATION SYSTEM PEM-VEND PLC 2 AHU ROOM-2
(STAGE-2) Y N
1. PERMANENTLY
INSTALLED SUMP
PUMPS– CONTROL OF
THESE SUMP PUMPS
SHALL BE PART OF
13 SUMP PUMPS PEM-VEND NEARBY WATER SKID MOUNTED
SYSTEM DCS.

2. PORTABLE PUMPS –
THESE SHALL BE SKID
MOUNTED CONTROLS.

SKID MOUNTED
(STAGE-1)
REDUNDANT Y Y
MICROPROCESSOR AND
BASED FOR EACH
PEM-VEND COMPRESSORS CCR1
14 COMPRESSED AIR SYSTEM
AND EDN
AND

DCS SKID MOUNTED


(STAGE-2) Y Y
&
CCR2

15 DEBRIS FILTER EDN DCS CCR-1 , 2 & 3 Y Y

PEM-VEND DCS LCR Y Y


16 RAW WATER PUMPS

PEM-VEND DCS LCR Y Y


1. CW MAKE UP PUMPS
2. SERVICE WATER PUMPS
3. AHP/ESP WATER WASHING PUMPS DCS LCR Y Y
17 4. FGD PUMPS PEM-VEND
5. FILTERED WATER TRANSPORTATION DCS LCR Y Y
SYSTEM (FILTER BACK WASH, SERVICE
WATER, POTABLE WATER SYSTEM)
HYDROGEN
18 HYDROGEN GENERATION PLANT PEM-VEND PLC BUILDING Y N

FIRE WATER PUMPS PLC FWPH Y N

19 HYD-VEND

FIRE DETECTION SYSTEM MICROPRECESSOR TG, ESP,CHP Y N


BASED

COAL HANDLING PLANT PLC CHPCR Y Y

20 ISG-VEND
WAGON TIPPLER PLC WT CR Y N

20 ISG-VEND

STACKER PLC STACKER Y N


MACHINE

RECLAIMER PLC RECLAIMER Y N


MACHINE

PADDLE FEEDER
PADDLE FEEDER PLC MACHINE Y N

ASH HANDLING PLANT PLC AHPCR Y Y

21 ISG-VEND

LCR NEAR HCSD


ASH HANDLING PLANT (HCSD SYSTEM) PLC SILO Y N

PRE-TREATMENT PLANT & SLUDGE


22 DISPOSAL AND TREATMENT SYSTEM PLC-1 & PLC-2 PT PLANT Y Y
INCLUDING CENTRIFUGE AND THICKENER
(INCLUDES RW CHLORINATION ALSO)

DE-MINERALIZATION PLANT & POTABLE


23 WATER TREATMENT PLANT( INCLUDES PLC-1 & PLC-2 DM PLANT Y Y
PW CHLORINATION ALSO)

CW
24 CW CHOLRINATION SYSTEM PLC-1 & PLC-2 CHLORINATION Y N
PLANT
BAP-VEND

25 WASTE WATER TREATMENT SYSTEM (ETP) PLC ETP Y N

26 CW TREATMENT SYSTEM DCS CWPH Y N

27 STP SYSTEM PLC STP Y N

DCS FGD CONTROL Y N


ROOM
28 FGD SYSTEM BAP-VEND
28 FGD SYSTEM BAP-VEND
FGD CONTROL
DCS ROOM Y N

29 SCR SYSTEM TRICHY-VEND DCS CCR __ Y

AUX. BOILER
30 AUXILIARY (AUX) BOILER HPVP-VIZAG DCS CONTROL Y N
ROOM
6) PLC PANEL SHALL HAVE PROVISION FOR DATA EXCHANGE (OPC) WITH PLANT DCS. NECESSARY OPC CLIENT/SERVER SOFTWARE TO BE PROV
NOTES: 7) NECESSARY PATCH CORD/CONVERTERS, LIU AT BOTH PLC AND DCS END SHALL BE IN BIDDER SCOPE FOR OPC LINK TO DDCMIS.
8) PLC SPECIFICATION SHALL BE AS PER KTPS TENDER SPECIFICATION VOLUME-VI, SECTION VI, SUBSECTION B ONLY.
5x800MW YADADRI TPS - CONTROL SYS
TYPE OF INTERFACE WITH
MAIN PLANT DCS COMMUNICATION HMI REQUIREM
TIME SYNC
FORMAT
LINK PURPOSE CABLE TYPE REDUNDANT PROTOCOL CCR
(Y/N)

__ __ __ __ __ __ __

__ __ __ __ __ __ __

__ __ __ __ __ __ __

__ __ __ __ __ __ __

__ __ __ __ __ __ __

__ __ __ __ __ __ __

1 OWS IN CCR1
__ __ __ __ __ __ 1 OWS IN CCR2
1 OWS IN CCR3

__ __ __ __ __ __ __

__ __ __ __ __ __ __
__ __ __ __ __ __ __

__ __ __ __ __ __ 1 OWS IN CCR1

1 OWS IN CCR2
__ __ __ __ __ __ 1 OWS IN CCR3

1 OWS IN CCR1
__ __ __ __ __ __ 1 OWS IN CCR2
1 OWS IN CCR3

__ __ __ __ __ __ __

SOFT MONITORING FO Y OPC IRIG-B 1 OWS IN CCR1

1 OWS IN CCR2
SOFT MONITORING FO Y OPC IRIG-B 1 OWS IN CCR3
__

HARD/ MONITORING
SOFT AND CONTROL __ __ __ __ 1 OWS IN CCR1

HARD/ MONITORING __ __ __ __ 1 OWS IN CCR2


SOFT AND CONTROL 1 OWS IN CCR3

__ __ __ __ __ __ __

__ __ __ __ __ __ 1 OWS IN CCR1

1 OWS IN CCR2
__ __ __ __ __ __ 1 OWS IN CCR3

__ __ __ __ __ __ 1 OWS IN CCR1

__ __ __ __ __ __ 1 OWS IN CCR2
1 OWS IN CCR3

MONITORING 1 OWS IN CCR1


SOFT AND CONTROL FO Y OPC IRIG-B 1 OWS IN CCR2
1 OWS IN CCR3

1 OWS IN CCR1
SOFT MONITORING FO Y OPC IRIG-B 1 OWS IN CCR2
AND CONTROL

1 OWS AND 1 PRINTER (A3/A4) IN CCR-1


1 OWS AND 1 PRINTER (A3/A4) IN CCR-2
HARD MONITORING 1 OWS IN CCR-3
1 OWS AND 1 PRINTER (A3/A4) IN
SWITCHYARD CONTROL ROOM

1 OWS IN CCR1
SOFT MONITORING FO Y OPC IRIG-B 1 OWS IN CCR2
AND CONTROL
1 OWS IN CCR3
HARD/SOF MONITORING
T AND CONTROL FO Y OPC NTP --

HARD/SOF MONITORING RADIO MODEM Y MODBUS NTP --


T AND CONTROL TCP/IP

HARD/SOF MONITORING RADIO MODEM Y MODBUS NTP --


T AND CONTROL TCP/IP

HARD/SOF MONITORING SCREEN


T AND CONTROL INSTRUMENTATIO Y N N --
N CABLE

MONITORING 1 OWS IN CCR1


SOFT AND CONTROL FO Y OPC IRIG-B 1 OWS IN CCR2
1 OWS IN CCR3

MONITORING MDDBUS
SOFT AND CONTROL FO Y TCP/IP NTP --

1 OWS IN CCR1
SOFT MONITORING FO Y OPC IRIG-B 1 OWS IN CCR2
AND CONTROL 1 OWS IN CCR3

MONITORING 1 OWS IN CCR1


SOFT FO Y OPC IRIG-B 1 OWS IN CCR2
AND CONTROL 1 OWS IN CCR3

SOFT MONITORING FO Y OPC IRIG-B

SOFT MONITORING FO Y OPC IRIG-B

SOFT MONITORING FO __ __ __

SOFT MONITORING FO Y OPC IRIG-B

SOFT MONITORING __ __ __ __
SOFT MONITORING __ __ __ __

__ __ __ __ __ __ __

SOFT MONITORING __ __ __ __ __

NT/SERVER SOFTWARE TO BE PROVIDED.


OPC LINK TO DDCMIS.
N B ONLY.
RI TPS - CONTROL SYSTEM FOR MECHANICAL AUXILIARY PACKAGES
HMI REQUIREMENT PANEL LOCATION

LCR DCS

__ CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-


DG-417-145-I401)
BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS, HW CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
ANNUNCIATION DG-417-145-I401)
LCP WITH START/STOP WITH COLOURED MIMIC , PB LAMPS, HW CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
ANNUNCIATION DG-417-145-I401)
LOCAL CONTROL PANEL WITH PB LAMPS, HARDWIRED CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
ANNUNCIATION. DG-417-145-I401)
1) 1 NO. OWS, 2) 1 NO. OEWS, 3) 1 NO. PRINTER
4) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS, CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
ANNUNCIATION DG-417-145-I401)

1) 1 NO. OWS, 2) 1 NO. OEWS, 3) 1 NO. PRINTER CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
4) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS, DG-417-145-I401)
ANNUNCIATION

1) 2 NO. OWS, 2) 2 OEWS, 3) BACK UP PANEL WITH COLOURED


MIMIC , PB LAMPS, ANNUNCIATION, 4) 2 NO. LVS EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417-100-
5) 2 No. PRINTER M003)

1) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS, EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417-100-
ANNUNCIATION M003)

CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-


DG-417-145-I401)
1) 1 NO. OEWS EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417-100-
2) 1 NO. OWS M003)
3) 1 NO. PRINTER(A3/A4)
1) 1 NO. OEWS EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417-100-
2) 1 NO. OWS M003)
3) 1 NO. PRINTER(A3/A4)

FOR REGENRATION (STAGEWISE)


1) 1 NO. OEWS, 2) 1 NO. PRINTER(A3/A4) CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
3) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS, DG-417-145-I401)
ANNUNCIATION

__ CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-


DG-417-145-I401)

1. 1 NO. OEWS, 2. 2 NO. OWS, 3) 1 NO. PRINTER(A3/A4) EQUIPMENT FLOOR PLAN AT 24.0 MTR (PE-DG-417-100-
M006)
1. 1 NO. OEWS, 2. 2 NO. OWS EQUIPMENT FLOOR PLAN AT 24.0 MTR (PE-DG-417-100-
3) 1 NO. PRINTER(A3/A4) M006)
1. PERMANENTLY INSTALLED SUMP PUMPS– CONTROL OF THESE
SUMP PUMPS SHALL BE PART OF NEARBY WATER SYSTEM DCS/PLC,
HOUSED IN NEARBY WATER SYSTEM CONTROL ROOMS.

2. PORTABLE PUMPS –THESE SHALL BE SKID MOUNTED CONTROLS.

1) 1 NO. OEWS
2. 1 NO. OWS CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
3) GUI DG-417-145-I401)
4) 1 NO. PRINTER(A3/A4)

1) 1 NO. OEWS, 2. 1 NO. OWS, 3) GUI CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
4) 1 NO. PRINTER(A3/A4) DG-417-145-I401)

LCP WITH START/STOP WITH COLOURED MIMIC , PB LAMPS, HW CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
ANNUNCIATION DG-417-145-I401)
1) 1 NO. OEWS, 1 NO. OWS
2) 1 NO. PRINTER(A3/A4) PLOT PLAN (PE-DG-417-100-M001)
3) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS,
ANNUNCIATION

1) 1 NO. OEWS, 1 NO. OWS 2) 1 NO. PRINTER(A3/A4)


3) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS, PLOT PLAN (PE-DG-417-100-M001)
ANNUNCIATION

1) 1 NO. OWS 2) 1 NO. OEWS 3) 1 NO. PRINTER PLOT PLAN (PE-DG-417-100-M001)

1) 1 NO. OWS 2) 1 NO. OEWS 3) 1 NO. PRINTER PLOT PLAN (PE-DG-417-100-M001)

1) 2 NO. OWS 2) 1 NO. OEWS 3) 1 NO. PRINTER


4) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS,
ANNUNCIATION

1) 1 NO. OWS
2) 1 NO. OEWS
3) 1 NO. PRINTER(A3/A4)
4) ANNUNCIATION, COLOURED MIMIC, INDICATIONS, PBs ARE PART
OF PLC PANEL FRONT DOOR.

FOR STAGE I:
LVS 4 NOS., OWS 2 NOS., OEWS 1 NO., PRINTER 1 NO.
FOR STAGE II
LVS 4 NOS. , OWS 2 NOS., OEWS 1 NO., PRINTER 1 NO.
BACK-UP CONTROL DESK WITH COLORED MIMIC, HARDWIRED
ANNUNCIATION SYSTEM,PUSHBUTTONS AND INDICATION LAMPS
FOR TOTAL CHP SYSTEM SHALL BE PART OF STAGE-I SYSTEM &
LOCATED AT STAGE I CONTROL ROOM
EACH PLC SHALL HAVE
1 NO. OWS
1 NO. OEWS
1NO. A4 COLOUR LASER PRINTER

EACH PLC SHALL HAVE


1 NO. OWS IN SCR OPERATOR CABIN, 1 NO. EWS/OWS IN SCR E
HOUSE, 1 LAPTOP(EWS) & 1 NO. A4 COLOUR LASER PRINTER

EACH PLC SHALL HAVE


1 NO. OWS IN SCR OPERATOR CABIN
1 NO. EWS/OWS IN SCR E HOUSE
1 LAPTOP(EWS)
1 NO. A4 COLOUR LASER PRINTER

HMI ON MACHINE PLC


1 LAPTOP (EWS/OWS)
1 NO. PRINTER

FOR STAGE I
LVS 2 NOS. , OWS 2 NOS., OEWS 1 NO., PRINTER 1
FOR STAGE II
LVS 2 NOS. , OWS 2 NOS., OEWS 1 NO., PRINTER 1
BACK-UP CONTROL DESK WITH COLORED MIMIC, HARDWIRED
ANNUNCIATION SYSTEM,PUSHBUTTONS AND INDICATION LAMPS
FOR TOTAL AHP SYSTEM STAGE WISE.
COMMON SYSTEMS SHALL BE PART OF STAGE-I MIMIC PANELS

1) OWS 3 NOS.
2) OEWS 1 NO.
3) PRINTER 1 NO.

EACH PLC SHALL HAVE


1) 2 NO. OWS, 2) 1 NO. OEWS
3) 1 NO. PRINTER
4) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS,
ANNUNCIATION

EACH PLC SHALL HAVE


1) 2 NO. OWS, 2) 1 NO. OEWS, 3) 1 NO. PRINTER
4) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS,
ANNUNCIATION

EACH PLC SHALL HAVE


1) 2 NO. OWS, 2) I NO. OEWS, 3) 1 NO. PRINTER

1) 2 NO. OWS
2) I NO. OEWS
3) 1 NO. PRINTER
4) 1 NO. LVS
5) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS,
HARDWIRED ANNUNCIATION

1) 1 NO. OWS PLOT PLAN (PE-DG-417-100-M001)

1) 2 NO. OWS
2) I NO. OEWS
3) 1 NO. PRINTER
4) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS,
HARDWIRED ANNUNCIATION

1) 2 NO. OWS, 2) 1 NO. OEWS, 3) 1 NO. PRINTER PLOT PLAN (PE-DG-417-100-M001)


1) 2 NO. OWS, 2) 1 NO. OEWS, 3) 1 NO. PRINTER PLOT PLAN (PE-DG-417-100-M001)

__ CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-


DG-417-145-I401)

__ PLOT PLAN (PE-DG-417-100-M001)


PACKAGES
PANEL LOCATION
DCS / PLC PANEL INPUT
POWER SUPPLY
PLC / BACKUP

MAIN PLANT UPS

EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417-


100-M003) MAIN PLANT UPS

EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417- MAIN PLANT UPS


100-M003)
EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417- MAIN PLANT UPS
100-M003)

COMPRESSOR HOUSE LAYOUT (PE-DG-417-555- MAIN PLANT UPS


A015)

COMPRESSOR HOUSE LAYOUT (PE-DG-417-555-


A015) MAIN PLANT UPS

EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417- LOCAL UPS IN FUEL OIL PUMP
100-M003) HOUSE CONTROL ROOM

EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417- FUEL OIL UNLOADING UPS,
100-M003) PDB in LCR

MAIN PLANT UPS

EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417-


100-M003) MAIN PLANT UPS, PDB in LCR

EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417-


100-M003) MAIN PLANT UPS, PDB in LCR

LOCAL STAGEWISE UPS IN


PLOT PLAN (PE-DG-417-100-M001) REGENERATION CONTROL
ROOM

MAIN PLANT UPS

EQUIPMENT FLOOR PLAN AT 24.0 MTR (PE-DG-417- PACKAGE UPS


100-M006) AHU ROOM-1
EQUIPMENT FLOOR PLAN AT 24.0 MTR (PE-DG-417- PACKAGE UPS
100-M006) AHU ROOM-2
COMPRESSOR HOUSE LAYOUT (PE-DG-417-555-
A015) MAIN PLANT UPS

COMPRESSOR HOUSE LAYOUT (PE-DG-417-555- MAIN PLANT UPS


A015)

EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417-


100-M003) MAIN PLANT UPS

PLOT PLAN (PE-DG-417-100-M001) UPS IN


RAW WATER PUMP HOUSE

PLOT PLAN (PE-DG-417-100-M001) UPS IN


RAW WATER PUMP HOUSE

PLOT PLAN (PE-DG-417-100-M001) MAIN PLANT UPS, PDB in LCR

PLOT PLAN (PE-DG-417-100-M001) MAIN PLANT UPS, PDB in LCR

PACKAGE UPS
PLOT PLAN (PE-DG-417-100-M001) HYDROGEN BUILDING

FIRE WATER PUMP HOUSE MAIN PLANT UPS, PDB in LCR


(PY-VA-3-M081-8663-01)

CCR-1, CCR-2, SWITCHYARD CR, DM PLANT CR, AHP


CR, CW PH CR, CHP CR MAIN PLANT UPS, PDB in LCR
(PY-FL-1-M081-8663-01)

CHPCR CHPCR
WT CR WT CR

STACKER MACHINE STACKER MACHINE

RECLAIMER MACHINE RECLAIMER MACHINE

PADDLE FEEDER MACHINE PADDLE FEEDER MACHINE

AHPCR AHPCR

HCSD SILO MCC HCSD SILO MCC

CHEMICAL HOUSE CONTROL ROOM(COMMON FOR PACKAGE UPS FOR PT


BOTH STAGE)

DM PLANT BUILDING CONTROL ROOM PACKAGE UPS FOR DM


(COMMON FOR BOTH SATGES)

STAGE-I PLC:CW CHORINATION BUILDING STGE-I


STAGE-II PLC: CHORINATION BUILDING STAGE-I PACKAGE UPS FOR CW
(STAGEWISE) CHLORINATION

ETP CONTROL ROOM PACKAGE UPS FOR ETP

MAIN PLANT UPS, PDB in LCR

STP CONTROL ROOM STP PACKAGE UPS

UPS IN LCR
UPS IN LCR

MAIN PLANT UPS

PACKAGE UPS
REMARKS

UNITIZED

UNITIZED

UNITIZED

UNITIZED

MRS (COMPRESSOR) SHALL BE STAGE WISE AND OWS/OEWS/LCP SHALL BE PLACED IN COMMON LOCAL
CONTROL ROOM.
CONVEYING,PYRITE HOPPER,BUNKER SHALL BE UNITIZED.
MRS (COMPRESSOR) SHALL BE STAGE WISE AND OWS/OEWS/LCP SHALL BE PLACED IN COMMON LOCAL
CONTROL ROOM.
CONVEYING,PYRITE HOPPER,BUNKER SHALL BE UNITIZED.

CONTROL SHALL BE ENVISAGED IN DCS. PANEL PLACED IN FUEL OIL PUMP HOUSE CONTROL ROOM
COMMON FOR 5 UNITS

CONTROL SHALL BE ENVISAGED IN DCS. PANEL PLACED IN FUEL OIL PUMP HOUSE CONTROL ROOM
COMMON FOR 5 UNITS
FOR HFO, RIO MAY BE CONSIDERED DEPENDING UPON THE IO CONCENTRATION.
FUEL OIL UNLOADING SYSTEM (TANKER ROAD AND WAGON RAIL) IS COMMON, HENCE CONTROL
SYSTEM IS ALSO COMMON.
HOWEVER, FUEL OIL PRESSURISING SYSTEM IS STAGEWISE AND DCS PANELS ARE ALSO STAGEWISE
ONLY.

STAGEWISE PUMPS
STAGEWISE PUMPS

COMMON FOR 2 UNITS AND STAGEWISE PUMP HOUSE

COMMON FOR 3 UNITS AND STAGEWISE PUMP HOUSE

REGENERATION : LCR
SERVICE VESSEL : PART OF CCR
SERVICE VESSEL UNITIZED DCS
REGENERATION 2 NO. STAGE WISE, HOWEVER COMMON LCR

UNITIZED

REFER SHEET NO. 5 OF 8 FOR PLC ARCHITECTURE DIAGRAM.


COMMON FOR 2 UNITS
REFER SHEET NO. 5 OF 8 FOR PLC ARCHITECTURE DIAGRAM.
COMMON FOR 3 UNITS
SUBMERSIBLE SUMP PUMP (PERMANENT DUTY TYPE)
CW PIT IN TG BUILDING : 2 NOS. SUMP PUMP PER CW PIT (TOTAL 10 NOS. SUMP PUMPS)
PORTABLE SUBMERSIBLE SUMP PUMP
1. PUMPS TO BE USED FOR DEWATERING CW P/H SUMP, RAW WATER P/H & CLARIFIED WATER P/H
SUMP : TOTAL 4 NOS. SUMP PUMPS.
2. PUMPS TO BE USED FOR DEWATERING OF VARIOUS CABLE TRENCHES AT VARIOUS LOCATIONS. : TOTAL
5 NOS. SUMP PUMPS.
3. PUMPS TO BE USED FOR DEWATERING OF VARIOUS SUMPS OF THE PLANT (OTHER THAN CHP / AHP) :
TOTAL 5 NOS. SUMP PUMPS.

CONTROL,PROTECTION AND INTERLOCKING FOR INDIVIDUAL COMPRESSORS SHALL BE THROUGH SKID


MOUNTED MICROPROCESSOR BASED REDUNDANT CONTROLLERS WITH GUI.
START STOP ,LOADING /UNLOADING SHALL BE IMPLEMENTED IN DCS.
COMMON FOR 2 UNITS

CONTROL,PROTECTION AND INTERLOCKING FOR INDIVIDUAL COMPRESSORS SHALL BE THROUGH SKID


MOUNTED MICROPROCESSOR BASED REDUNDANT CONTROLLERS WITH GUI.
START STOP ,LOADING /UNLOADING SHALL BE IMPLEMENTED IN DCS.
COMMON FOR 3 UNITS

UNITIZED

STAGE WISE RAW WATER PUMPS.


HOWEVER, COMMON RWPH
BHEL CAN CHECK POSSIBILITY OF USING PLC BASED SYSTEM IF DISTANCE OF RWPH IS MORE.

STAGE WISE RAW WATER PUMPS.


HOWEVER, COMMON RWPH

STAGE WISE PUMPS. HOWEVER, COMMON CLARIFIED WPH

STAGE WISE PUMPS. HOWEVER, COMMON CLARIFIED WPH

REFER SHEET NO. 6 OF 8 FOR PLC ARCHITECTURE DIAGRAM. COMMON FOR 5 UNITS

COMMON FOR ALL 5 UNITS

HARD CONTACTS FOR MONITORING/ALARM


(REDUNDANT BASED MICRO CONTROLLER BASED SYSTEM)

STAGEWISE PLC
COMMON LOCAL CONTOL ROOM
FINAL LOCATION OF PLC & UPS PANELS FOR CHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.
EACH WT SHALL HAVE INDIVIDUAL PLC
FINAL LOCATION OF PLC & UPS PANELS FOR CHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.

EACH STACKER SHALL HAVE INDIVIDUAL PLC. WIRE LESS CONNECTION BETWEEN STACKER/RECLAIMER
PLC to CHP PLC(TO&FRO), FOR MAINTAINING S/R PROTECTION SHALL BE ON HARDWIRED INPUTS
THROUGH REEL DRUM.
FINAL LOCATION OF PLC & UPS PANELS FOR CHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.

EACH RECLAIMER SHALL HAVE INDIVIDUAL PLC.WIRE LESS CONNECTION BETWEEN STACKER/RECLAIMER
PLC to CHP PLC(TO&FRO), FOR MAINTAINING S/R PROTECTION SHALL BE ON HARDWIRED INPUTS
THROUGH REEL DRUM.
FINAL LOCATION OF PLC & UPS PANELS FOR CHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.

EACH TRACKHOPPER COMPLEX SHALL HAVE INDIVIDUAL PLC.


FINAL LOCATION OF PLC & UPS PANELS FOR CHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.

STAGEWISE PLC
STAGEWISE LOCAL CONTROL ROOM.
FINAL LOCATION OF PLC & UPS PANELS FOR AHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.

COMMON LOCAL CONTOL ROOM


FINAL LOCATION OF PLC & UPS PANELS FOR AHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.

STAGEWISE PLC
REFER SHEET NO. 9 & 10 OF 16 (4-WT-310-01330) FOR PLC ARCHITECTURE DIAGRAM

STAGEWISE PLC
2 NO. LVS STAGEWISE. HOWEVER, COMMON LCR

REFER SHEET NO. 11 & 12 OF 16 (4-WT-500-01143) FOR PLC ARCHITECTURE DIAGRAM

STAGEWISE PLC.
REFER SHEET NO. 13 & 14 OF 16 (4-WT-040-01143) FOR PLC ARCHITECTURE DIAGRAM

COMMON FOR 5 UNITS, RIO APPLICABLE.

REFER SHEET NO. 15 OF 16 (4-WT-060-01143) FOR PLC ARCHITECTURE DIAGRAM

STAGEWISE. RESPECTIVE CWPH DCS

COMMON FOR 5 UNITS, RIO APPLICABLE.

REFER SHEET NO. 16 OF 16 (4-WT-055-01143) FOR PLC ARCHITECTURE DIAGRAM

STAGEWISE FGD CONTROL SYSTEM AND CONTROL ROOM, RIO APPLICABLE


STAGEWISE FGD CONTROL SYSTEM AND CONTROL ROOM, RIO APPLICABLE

COMMON FOR 5 UNITS


SCR SYSTEM ENGINEERING IS UNDER PRELIMINARY STAGE AND CONTROLS PERTAINING TO THESE
SYSTEMS WILL BE IMPLEMENTED IN EDN SUPPLIED DCS. PROVISION FOR LOCAL OPERATION WILL ALSO BE
ENVISAGED.
SAME WILL BE UPDATED AFTER FINALISATION OF THE CONTROL SYSTEM ALONGWITH LOCAL OPERATION.

AUX BOILER CONTROL ROOM


1 NO. AUX. BOILER IS ENVISAGED