SL. CONTROL
NO. SYSTEM / PACKAGE SYSTEM SCOPE
TYPE LOCATION LOCAL REMOTE(CCR)
TANKER
DCS (ROAD) Y Y
(LDO & HFO)
DCS (RIO) 5) Y Y
7 CLUBBED AT SR. NO. 17, AS THIS WAS PART OF CLARIFIED WATER PUMP HOUSE ONLY.
DM TRANSPORTATION SYSTEM (DM CCR-1 N Y
8 TRANSFER, STORAGE, BOILER FILL, EDN DCS
HOTWELL MAKEUP) CCR-2 N Y
CWPH-1
(STAGE-1) Y Y
9 CW/ACW SYSTEM EDN DCS
CWPH-2
(STAGE-2) Y Y
DCS (RTU AT
10 CONDENSATE POLISHING UNIT EDN REGENERATION) LCR Y Y
AHU ROOM-1 Y N
PLC 1 & (STAGE-1)
12 AC / VENTILLATION SYSTEM PEM-VEND PLC 2 AHU ROOM-2
(STAGE-2) Y N
1. PERMANENTLY
INSTALLED SUMP
PUMPS– CONTROL OF
THESE SUMP PUMPS
SHALL BE PART OF
13 SUMP PUMPS PEM-VEND NEARBY WATER SKID MOUNTED
SYSTEM DCS.
2. PORTABLE PUMPS –
THESE SHALL BE SKID
MOUNTED CONTROLS.
SKID MOUNTED
(STAGE-1)
REDUNDANT Y Y
MICROPROCESSOR AND
BASED FOR EACH
PEM-VEND COMPRESSORS CCR1
14 COMPRESSED AIR SYSTEM
AND EDN
AND
19 HYD-VEND
20 ISG-VEND
WAGON TIPPLER PLC WT CR Y N
20 ISG-VEND
PADDLE FEEDER
PADDLE FEEDER PLC MACHINE Y N
21 ISG-VEND
CW
24 CW CHOLRINATION SYSTEM PLC-1 & PLC-2 CHLORINATION Y N
PLANT
BAP-VEND
AUX. BOILER
30 AUXILIARY (AUX) BOILER HPVP-VIZAG DCS CONTROL Y N
ROOM
6) PLC PANEL SHALL HAVE PROVISION FOR DATA EXCHANGE (OPC) WITH PLANT DCS. NECESSARY OPC CLIENT/SERVER SOFTWARE TO BE PROV
NOTES: 7) NECESSARY PATCH CORD/CONVERTERS, LIU AT BOTH PLC AND DCS END SHALL BE IN BIDDER SCOPE FOR OPC LINK TO DDCMIS.
8) PLC SPECIFICATION SHALL BE AS PER KTPS TENDER SPECIFICATION VOLUME-VI, SECTION VI, SUBSECTION B ONLY.
5x800MW YADADRI TPS - CONTROL SYS
TYPE OF INTERFACE WITH
MAIN PLANT DCS COMMUNICATION HMI REQUIREM
TIME SYNC
FORMAT
LINK PURPOSE CABLE TYPE REDUNDANT PROTOCOL CCR
(Y/N)
__ __ __ __ __ __ __
__ __ __ __ __ __ __
__ __ __ __ __ __ __
__ __ __ __ __ __ __
__ __ __ __ __ __ __
__ __ __ __ __ __ __
1 OWS IN CCR1
__ __ __ __ __ __ 1 OWS IN CCR2
1 OWS IN CCR3
__ __ __ __ __ __ __
__ __ __ __ __ __ __
__ __ __ __ __ __ __
__ __ __ __ __ __ 1 OWS IN CCR1
1 OWS IN CCR2
__ __ __ __ __ __ 1 OWS IN CCR3
1 OWS IN CCR1
__ __ __ __ __ __ 1 OWS IN CCR2
1 OWS IN CCR3
__ __ __ __ __ __ __
1 OWS IN CCR2
SOFT MONITORING FO Y OPC IRIG-B 1 OWS IN CCR3
__
HARD/ MONITORING
SOFT AND CONTROL __ __ __ __ 1 OWS IN CCR1
__ __ __ __ __ __ __
__ __ __ __ __ __ 1 OWS IN CCR1
1 OWS IN CCR2
__ __ __ __ __ __ 1 OWS IN CCR3
__ __ __ __ __ __ 1 OWS IN CCR1
__ __ __ __ __ __ 1 OWS IN CCR2
1 OWS IN CCR3
1 OWS IN CCR1
SOFT MONITORING FO Y OPC IRIG-B 1 OWS IN CCR2
AND CONTROL
1 OWS IN CCR1
SOFT MONITORING FO Y OPC IRIG-B 1 OWS IN CCR2
AND CONTROL
1 OWS IN CCR3
HARD/SOF MONITORING
T AND CONTROL FO Y OPC NTP --
MONITORING MDDBUS
SOFT AND CONTROL FO Y TCP/IP NTP --
1 OWS IN CCR1
SOFT MONITORING FO Y OPC IRIG-B 1 OWS IN CCR2
AND CONTROL 1 OWS IN CCR3
SOFT MONITORING FO __ __ __
SOFT MONITORING __ __ __ __
SOFT MONITORING __ __ __ __
__ __ __ __ __ __ __
SOFT MONITORING __ __ __ __ __
LCR DCS
1) 1 NO. OWS, 2) 1 NO. OEWS, 3) 1 NO. PRINTER CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
4) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS, DG-417-145-I401)
ANNUNCIATION
1) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS, EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417-100-
ANNUNCIATION M003)
1. 1 NO. OEWS, 2. 2 NO. OWS, 3) 1 NO. PRINTER(A3/A4) EQUIPMENT FLOOR PLAN AT 24.0 MTR (PE-DG-417-100-
M006)
1. 1 NO. OEWS, 2. 2 NO. OWS EQUIPMENT FLOOR PLAN AT 24.0 MTR (PE-DG-417-100-
3) 1 NO. PRINTER(A3/A4) M006)
1. PERMANENTLY INSTALLED SUMP PUMPS– CONTROL OF THESE
SUMP PUMPS SHALL BE PART OF NEARBY WATER SYSTEM DCS/PLC,
HOUSED IN NEARBY WATER SYSTEM CONTROL ROOMS.
1) 1 NO. OEWS
2. 1 NO. OWS CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
3) GUI DG-417-145-I401)
4) 1 NO. PRINTER(A3/A4)
1) 1 NO. OEWS, 2. 1 NO. OWS, 3) GUI CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
4) 1 NO. PRINTER(A3/A4) DG-417-145-I401)
LCP WITH START/STOP WITH COLOURED MIMIC , PB LAMPS, HW CCR/CER/COMPUTER/UPS ROOM LAYOUT AT 17.0 M (PE-
ANNUNCIATION DG-417-145-I401)
1) 1 NO. OEWS, 1 NO. OWS
2) 1 NO. PRINTER(A3/A4) PLOT PLAN (PE-DG-417-100-M001)
3) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS,
ANNUNCIATION
1) 1 NO. OWS
2) 1 NO. OEWS
3) 1 NO. PRINTER(A3/A4)
4) ANNUNCIATION, COLOURED MIMIC, INDICATIONS, PBs ARE PART
OF PLC PANEL FRONT DOOR.
FOR STAGE I:
LVS 4 NOS., OWS 2 NOS., OEWS 1 NO., PRINTER 1 NO.
FOR STAGE II
LVS 4 NOS. , OWS 2 NOS., OEWS 1 NO., PRINTER 1 NO.
BACK-UP CONTROL DESK WITH COLORED MIMIC, HARDWIRED
ANNUNCIATION SYSTEM,PUSHBUTTONS AND INDICATION LAMPS
FOR TOTAL CHP SYSTEM SHALL BE PART OF STAGE-I SYSTEM &
LOCATED AT STAGE I CONTROL ROOM
EACH PLC SHALL HAVE
1 NO. OWS
1 NO. OEWS
1NO. A4 COLOUR LASER PRINTER
FOR STAGE I
LVS 2 NOS. , OWS 2 NOS., OEWS 1 NO., PRINTER 1
FOR STAGE II
LVS 2 NOS. , OWS 2 NOS., OEWS 1 NO., PRINTER 1
BACK-UP CONTROL DESK WITH COLORED MIMIC, HARDWIRED
ANNUNCIATION SYSTEM,PUSHBUTTONS AND INDICATION LAMPS
FOR TOTAL AHP SYSTEM STAGE WISE.
COMMON SYSTEMS SHALL BE PART OF STAGE-I MIMIC PANELS
1) OWS 3 NOS.
2) OEWS 1 NO.
3) PRINTER 1 NO.
1) 2 NO. OWS
2) I NO. OEWS
3) 1 NO. PRINTER
4) 1 NO. LVS
5) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS,
HARDWIRED ANNUNCIATION
1) 2 NO. OWS
2) I NO. OEWS
3) 1 NO. PRINTER
4) BACK UP PANEL WITH COLOURED MIMIC , PB LAMPS,
HARDWIRED ANNUNCIATION
EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417- LOCAL UPS IN FUEL OIL PUMP
100-M003) HOUSE CONTROL ROOM
EQUIPMENT FLOOR PLAN AT 0.0 MTR (PE-DG-417- FUEL OIL UNLOADING UPS,
100-M003) PDB in LCR
PACKAGE UPS
PLOT PLAN (PE-DG-417-100-M001) HYDROGEN BUILDING
CHPCR CHPCR
WT CR WT CR
AHPCR AHPCR
UPS IN LCR
UPS IN LCR
PACKAGE UPS
REMARKS
UNITIZED
UNITIZED
UNITIZED
UNITIZED
MRS (COMPRESSOR) SHALL BE STAGE WISE AND OWS/OEWS/LCP SHALL BE PLACED IN COMMON LOCAL
CONTROL ROOM.
CONVEYING,PYRITE HOPPER,BUNKER SHALL BE UNITIZED.
MRS (COMPRESSOR) SHALL BE STAGE WISE AND OWS/OEWS/LCP SHALL BE PLACED IN COMMON LOCAL
CONTROL ROOM.
CONVEYING,PYRITE HOPPER,BUNKER SHALL BE UNITIZED.
CONTROL SHALL BE ENVISAGED IN DCS. PANEL PLACED IN FUEL OIL PUMP HOUSE CONTROL ROOM
COMMON FOR 5 UNITS
CONTROL SHALL BE ENVISAGED IN DCS. PANEL PLACED IN FUEL OIL PUMP HOUSE CONTROL ROOM
COMMON FOR 5 UNITS
FOR HFO, RIO MAY BE CONSIDERED DEPENDING UPON THE IO CONCENTRATION.
FUEL OIL UNLOADING SYSTEM (TANKER ROAD AND WAGON RAIL) IS COMMON, HENCE CONTROL
SYSTEM IS ALSO COMMON.
HOWEVER, FUEL OIL PRESSURISING SYSTEM IS STAGEWISE AND DCS PANELS ARE ALSO STAGEWISE
ONLY.
STAGEWISE PUMPS
STAGEWISE PUMPS
REGENERATION : LCR
SERVICE VESSEL : PART OF CCR
SERVICE VESSEL UNITIZED DCS
REGENERATION 2 NO. STAGE WISE, HOWEVER COMMON LCR
UNITIZED
UNITIZED
REFER SHEET NO. 6 OF 8 FOR PLC ARCHITECTURE DIAGRAM. COMMON FOR 5 UNITS
STAGEWISE PLC
COMMON LOCAL CONTOL ROOM
FINAL LOCATION OF PLC & UPS PANELS FOR CHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.
EACH WT SHALL HAVE INDIVIDUAL PLC
FINAL LOCATION OF PLC & UPS PANELS FOR CHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.
EACH STACKER SHALL HAVE INDIVIDUAL PLC. WIRE LESS CONNECTION BETWEEN STACKER/RECLAIMER
PLC to CHP PLC(TO&FRO), FOR MAINTAINING S/R PROTECTION SHALL BE ON HARDWIRED INPUTS
THROUGH REEL DRUM.
FINAL LOCATION OF PLC & UPS PANELS FOR CHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.
EACH RECLAIMER SHALL HAVE INDIVIDUAL PLC.WIRE LESS CONNECTION BETWEEN STACKER/RECLAIMER
PLC to CHP PLC(TO&FRO), FOR MAINTAINING S/R PROTECTION SHALL BE ON HARDWIRED INPUTS
THROUGH REEL DRUM.
FINAL LOCATION OF PLC & UPS PANELS FOR CHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.
STAGEWISE PLC
STAGEWISE LOCAL CONTROL ROOM.
FINAL LOCATION OF PLC & UPS PANELS FOR AHP SYSTEMS SHALL BE DECIDED BY BOP VENDOR DURING
DETAILED ENGG. AFTER FINALIZATION OF LOADS.
STAGEWISE PLC
REFER SHEET NO. 9 & 10 OF 16 (4-WT-310-01330) FOR PLC ARCHITECTURE DIAGRAM
STAGEWISE PLC
2 NO. LVS STAGEWISE. HOWEVER, COMMON LCR
STAGEWISE PLC.
REFER SHEET NO. 13 & 14 OF 16 (4-WT-040-01143) FOR PLC ARCHITECTURE DIAGRAM