Pre-concreting Inspection
Project Title: CP7B-Lusail plaza infrastructure,LRTstation,publice car par Project No.: CP 07B
Date Inspection Required: Oct 31, 2020 Time Inspection Required: 9:00:00 PM BOQ Ref.:
Contractor
1 Excavation
2 Formation
3 Blinding
4 Membranes
5 Waterbars
6 Joints
7 Reinforcement
8 H.D. Bolt
9 M & E Built In Items
10 Formwork
11 Line and Level
12 Strutting
13 Cleanliness
Necessary Reliable concrete mixer (for quantities <2 m³ only) Testing cubes Thermometer Water tank
Equipment
Reliable concrete vibrators Water pump Polythene sheets Hessian cloths Scaffolding
Hose Other
Consultant 1. The check on above structure does not relieve the contractor of his contractual
obligations under the contract.
Received on 2. This form must be submitted at least four working days prior to concreting.
3. This form shall be submitted on applicable workflow on ACONEX.
Actioned on 4. Failure to fulfill the above instruction will result in delaying the job.
Signature & Stamp 5. Inspection should be executed on the time and date stated.
Blinding For SSD-DB-43Road F3
CP07‐B Lusail Plaza Infrastructure, LRT Station, Public Car Contract No. Location:
Parks and Landscape 5297 Lusail, Qatar
CP07b‐F12‐Rev.1‐May‐16 Page 1 of 1