● Overall Industry Experience : 07 Years of experience in Thermal Power plant (OPERATION).

● Current Employer : Singareni Thermal Power Plant,Steag Energy Services



● Designation : Sr Engineer Operation
● .
● Proficiency in attending emergencies and blackouts.
● Strong communication, interpersonal, analytical & team building skills with proficiency at grasping new concepts quickly and
utilising the same in a productive manner.

ACADEMIC CREDENTIALS
● B.TECH. in Electrical Engineering from Secured 72.8%.

ORGANIZATIONAL DETAILS

Steag Energy Services (I) Pt. Limited, Orissa Engineer (Operations) Since Apr 2012

COMPANY PROFILE :
Previously worked for M/s M/s STEAG Energy Services India Pvt Ltd., (4 X 600
MW) Sterlite Energy Ltd., Jharsuguda, Odisha from 12/04/2012 to 26/02/2015 is having a Installed capacity 4*600 MW =2400 MW
and which is having Pulverized coal fired Boiler Supplied by M/s Harbin China, and Dongfang make Turbine with associated Reheat
turbine system. Boiler 2028 TPH Working pressure 17.5Mpa, TG inlet pressure 16.7Mpa and temperature 540deg (e.g. P.C. fired sub-
critical, Forced circulation, Dry Bottom, Tangentially fired, Balanced Draft, and Radiant Reheat Type Boiler.) generator hydrogen
cooled.
● HARBIN China make PF Boiler, Capacity – 2028 TPH Operating pressure 17.5Mpa & Temperature 541deg C
● DONGFONG China make Primary reheating, Single shaft, Three cylinder and four flow, Condensing type turbine
● Intermediate reheat condensing turbine with HP & LP bypass, DEH governing system
● 706 MVA Hydrogen cooled two pole generator made by SEC china with Static Excitation system.
● Automation – FOXBORO DCS
● 2 X 283 TPH D. M Plant.

ACCOUNTIBILITIES:

● Handling the light up activities of Boiler, rolling of main Turbine and synchronise Generator with GRID.
● Performing smooth operation (main turbine rolling and taking and cutting mills at various loads).
● Performing smooth rolling and operation of TDBFP (Turbine Driven Boiler Feed Pump) at various load.
● Performing Performance Guarantee (PG) test of various equipment.
● Have run the plant at various emergency conditions (Like tripping of single IDF, single FDF, single PAF, single APH, single
CW Pump, and single TDBFP).
● Smooth operation of Auxiliary Boiler (Start up Boiler) for alkali and acid cleaning of main boiler and also alkali flushing of
turbine side Piping.
● Avoid unit tripping in emergency condition (GRID Island) by CILMS (Co-ordination Islanding Master Control System).
● Maintaining the load according ABT (Availability based tariff) for UI.
● Perform the role of maintenance co-ordinator in annual overhauling.
● Handle the situation like black out, house load, DCS failure and all CW pumps trip.

● Include in projects like minimising DM water consumption, auxiliary power consumption (APC), specific oil consumption
(SOC), specific coal consumption (SCC) and DM water consumption, station heat rate (SHR) which are use in term of cost reduction.

● Has got WELL DONE CARD for h2 plant & Electrical operation

● Handle the SAP & SI system for permits, work orders and measures for all other maintenance works.
CURRENT ASSESSMENT:

Working as a CRE( Control Room Engineer) with M/s STEAG Energy Services Botswana Pvt
Ltd., Operation and Maintenance contractor of (4 X 150 MW) Botswana Power Corporation, Botswana.
COMPANY PROFILE :
Working for M/s STEAG Energy Services Botswana Pvt Ltd., (4 X 150 MW) Botswana Power
Corporation from 27/02/2015 is having a Installed capacity 4*150 MW =600 MW and which is having Circulating Fluidised Bed
Combustion Technology fired Boiler Supplied by M/s CNEEC China, and Dongfang make Turbine with associated Reheat turbine
system . Boiler 524 TPH Working pressure 15.0Mpa, TG inlet pressure 13.2Mpa and temperature 540deg (e.g. CFBC fired sub-critical,
Natural circulation, Dry Bottom, Wall fired, Balanced Draft, and Radiant Reheat Type Boiler.) generator Air cooled.
● DONGFANG China make Primary reheating, Single shaft, Three cylinder and four flow, Condensing type turbine
● Intermediate reheat condensing turbine with HP & LP bypass, DEH governing system.
● Presently working for 2*600MW STPP site as a Sr.operation Engineer.

TRAININGS & PROJECT


● Undergone Industrial Training at Durgapur Project Limited (DPL) on Power generation & transmission.
● One year certification course on Operation & Maintenance of Thermal Power Plant Engineering
(Equivalent to PGDC) Approved by Central Electricity Authority, Govt. of India in 2012

IT SKILLS

● Operating Systems : Microsoft Win XP/Vista/Seven.


● Programming Language: C.

PERSONAL PROFILE
Father’s Name : Mr. Bisweswar Chakraborty
Sex : Male.
Marital Status : Married.
Nationality : Indian.
Permanent Address: Jotindramohan Saroni,
Chapadali More, Barasat
Dist. – North 24 Parganas,
West Bengal, PIN-700124.

I hereby declare that information provided by me above is true to best of my knowledge.

(Tuhin Chakraborty)

You might also like