Ent Sal Sal Ent - 1 - 1: Despl Hot, Real Hot, Intervalo Hot, graf-CC Cold, Real Cold, Intervalo
Ent Sal Sal Ent - 1 - 1: Despl Hot, Real Hot, Intervalo Hot, graf-CC Cold, Real Cold, Intervalo
Ent Sal Sal Ent - 1 - 1: Despl Hot, Real Hot, Intervalo Hot, graf-CC Cold, Real Cold, Intervalo
Tdesplazada (ºC)
Hcold,graf-CC DHintervalo CQNO CQSÍ 180
160
(MW) (MW) (MW) (MW)
140
15 0 3 =Serv. Calor
120
12 3 -3 0 =Pinch 100
9 -9 6 9 80
8 1 5 8 =Serv. Frío 60
40
20
0
0 2 4 6 8 10 12 14 1
H (MW)
Tdesplazada (ºC)
200
180
160
140
120
100
80
60
40
20
0
0 1 2 3 4 5 6 7 8 9 1
Q (MW)
Servicio de Frío
Q Tdespl Treal
(MW) (ºC) (ºC)
0 25 20
8 25 20
8 10 12 14 16
(MW)
5 6 7 8 9 10
(MW)
H1 C1
Tent (ºC)= 100 Tsal (ºC)= 150
Tsal (ºC)= 40 Tent (ºC)= 10
-1 -1
CP (MW K )= 0.2 CP (MW K )= 0.05
Q (MW)= 12 Q (MW)= 7
DTcontr (ºC)= -10 DTcontr (ºC)= 10
Tent,despl (ºC)= 90 Tsal,despl (ºC)= 160
Tsal,despl (ºC)= 30 Tent,despl (ºC)= 20
Tdesplazada (ºC)
Hcold,graf-CC DHintervalo CQNO CQSÍ 180
160
(MW) (MW) (MW) (MW)
140
15.5 0 3.5 =Serv. Calor
120
12 3.5 -3.5 0 =Pinch 100
9 -9 5.5 9 80
8.5 0.5 5 8.5 =Serv. Frío 60
40
20
0
0 2 4 6 8 10 12 14 1
H (MW)
Tdesplazada (ºC)
200
180
160
140
120
100
80
60
40
20
0
0 1 2 3 4 5 6 7 8
Q (MW)
Servicio de Frío
Q Tdespl Treal
(MW) (ºC) (ºC)
0 25 20
8.5 25 20
6 8 10 12 14 16 18
H (MW)
4 5 6 7 8 9 10
Q (MW)
H1 H2 H3
Tent (ºC)= 160 50 140
Tsal (ºC)= 40 49.9 110
-1
CP (MW K )= 0.03 50 0.05 CP (MW K-1)=
Q (MW)= 3.6 5 1.5
DTcontr (ºC)= -5 -5 -5
Tent,despl (ºC)= 155 45 135
Tsal,despl (ºC)= 35 44.9 105
180
160
140
=Serv. Calor
120
100
=Pinch 80
=Pinch 60
40
20
0
0 2 4 6 8 10 12 14 16
H (MW)
Tdesplazada (ºC)
=Serv. Frío
200
180
160
140
120
100
80
60
40
20
0
0 1 2 3 4 5 6 7 8 9
Q (MW)
H1 H3
Tent (ºC)= 190 Tsal (ºC)=
Tsal (ºC)= 110 Tent (ºC)=
CP (kW K-1)= 2.5 CP (kW K-1)=
Q (kW)= 200 Q (kW)=
DTcontr (ºC)= -10 DTcontr (ºC)=
Tent,despl (ºC)= 180 Tsal,despl (ºC)=
Tsal,despl (ºC)= 100 Tent,despl (ºC)=
Tdesplazada (ºC)
CP CP DHcold,intervalo Hcold,graf-CC DHintervalo CQNO CQSÍ 200
180
(kW K-1) (kW K-1) (kW) (kW) (kW) (kW) (kW)
160
0 1400 =Serv. Calor 140
0 0 0 1600 0 0 1400 120
20 0 1600 0 1400 -1400 0 =Pinch 100
80
20 0 0 0 -1400 0 =Serv. Frío
60
40
20
0
0 2
Tdesplazada (ºC)
200
180
160
140
120
100
80
60
40
20
0
0 2
Servicio de Calor Servicio de Frío
Q Tdespl Treal Q Tdespl Treal
(kW) (ºC) (ºC) (kW) (ºC) (ºC)
0 185 190 0 25 20
1400 185 190 0 25 20
Tdesplazada (ºC)
200
180
160
140
120
100
80
60
40
20
0
0 200 400 600 800 10001200 140016001800
H (MW)
Tdesplazada (ºC)
200
180
160
140
120
100
80
60
40
20
0
0 200 400 600 800 1000 1200 1400 1600
Q (MW)
H1 H3
Tent (ºC)= 140 Tsal (ºC)=
Tsal (ºC)= 50 Tent (ºC)=
CP (kW K-1)= 20 CP (kW K-1)=
Q (kW)= 1800 Q (kW)=
DTcontr (ºC)= -10 DTcontr (ºC)=
Tent,despl (ºC)= 130 Tsal,despl (ºC)=
Tsal,despl (ºC)= 40 Tent,despl (ºC)=
Tdesplazada (ºC)
140
CP CP DHcold,intervalo Hcold,graf-CC DHintervalo CQNO CQSÍ
120
(kW K-1) (kW K-1) (kW) (kW) (kW) (kW) (kW)
100
0 0 =Serv. Calor
80
0 0 0 1800 0 0 0 =Pinch
60
5 0 450 1350 -1350 1350 1350
40
5 0 0 0 1350 1350 =Serv. Frío
20
0
Tdesplazada (ºC)
200
180
160
140
120
100
80
60
40
20
0
0 2
Servicio de Calor Servicio de Frío
Q Tdespl Treal Q Tdespl Treal
(kW) (ºC) (ºC) (kW) (ºC) (ºC)
0 185 190 0 25 20
0 185 190 1350 25 20
Tdesplazada (ºC)
140
120
100
80
60
40
20
0
H (MW)
Tdesplazada (ºC)
200
180
160
140
120
100
80
60
40
20
0
0 200 400 600 800 1000 1200 1400 1600
Q (MW)
H1 H3
Tent (ºC)= 190 140 Tsal (ºC)=
Tsal (ºC)= 110 50 Tent (ºC)=
CP (kW K-1)= 2.5 20 CP (kW K-1)=
Q (kW)= 200 1800 Q (kW)=
DTcontr (ºC)= -10 -10 DTcontr (ºC)=
Tent,despl (ºC)= 180 130 Tsal,despl (ºC)=
Tsal,despl (ºC)= 100 40 Tent,despl (ºC)=
Tdesplazada (ºC)
CP CP DHcold,intervalo Hcold,graf-CC DHintervalo CQNO CQSÍ 200
180
(kW K-1) (kW K-1) (kW) (kW) (kW) (kW) (kW)
160
0 950 =Serv. Calor 140
0 0 0 2950 0 0 950 120
20 0 1000 1950 875 -875 75 100
80
20 0 0 1950 0 -875 75
60
20 5 750 1200 75 -950 0 40
20 5 0 1200 0 -950 0 =Pinch 20
0 5 300 900 -900 -50 900 0
0
0 5 0 0 -50 900 =Serv. Frío
Tdesplazada (ºC)
200
180
160
140
120
100
80
60
40
20
0
0 1
Servicio de Calor Servicio de Frío
Q Tdespl Treal Q Tdespl Treal
(kW) (ºC) (ºC) (kW) (ºC) (ºC)
0 185 190 0 25 20
950 185 190 900 25 20
Tdesplazada (ºC)
200
A
180
Serv Calor (kW)= 1400
160
140 Serv Frío (kW)= 0
120
100
80
60
40
20
0
0 500 1000 1500 2000 2500 3000 3500
H (MW)
Tdesplazada (ºC)
200
180
160
140
120
100
80
60
40
20
0
0 100 200 300 400 500 600 700 800 900 1000
Q (MW)
B A y B indep. A+B Pagas de másAhorro
0 1400 950 47% 32%
1350 1350 900 50% 33%
GCC Gases del Horno
Q Tdespl Q
(MW) (ºC) (MW)
9 360 9
7.6 310 0
8 230 -0.37380192
4.8 210 -1.20766773
5.8 190
0 190
1 170
7.6 150
3 60
Tdesplazada (ºC)
Qproceso (MW)= 9
400 QCh (MW)= 1.20766773
350
QFuel (MW)= 10.2076677
300
h= 88.17%
250
200
150
100 P.V.P Coste
50 (€ (kWh)-1) (€ año-1)
0
0.04 3470607.03
-50
-2 0 2 4 6 8 10 Cuanto nos cuesta realmente el gas natura
tabla real. El caudal de gas natural que no
Q (MW) falta es el de 0,01321 de metano por
segundo.Lo hemos pasado a esas unidade
Lo señalado en azul son los diferentes cos
que nos sale con el problema y lo que
verdaderamente nos deberia salir con los
de gas natural. Se han equivocado en un 2
calcular el dinero, la empresa se ha equivo
en ese porcentaje.
ases del Horno
Tdespl Treal
(ºC) (ºC)
1755 1800 Metano Metano
190 235 T (ºC) =
125 170 Fase =
-20 25 TRef (ºC) =
Fase Ref. =
M Cp xi ni
(g mol-1) (J mol-1 K-1) (mol mol-1) (kmol)
CH4 = 16 CH4 = 1 0.01321655
O2 = 32 34.95 O2 = 0 0
N2 = 28 33.03 N2 = 0 0
CO2 = 44 54.15 CO2 = 0 0
H2O = 18 42.75 H2O = 0 0
Suma = 1
Calculos = 0.01321655
Poder calorifico superior Masa (kg) = 0.21146475
P.V.P P.C.S Caudal Ch4 coste Entalía (kJ) =
(€m-3(n) (kwhm-3(n) (m3(n)h-1) €año-1
0.468 11.7 1065.78233 4239682.11
esta realmente el gas natural, Diferencia 1.22159671 ∑8_𝑖𝑛▒∑8_𝑖▒ 〖𝑛 _(𝑖,𝑖𝑛) 𝐶_(
audal de gas natural que nos hace
0,01321 de metano por
emos pasado a esas unidades.
n azul son los diferentes costes
on el problema y lo que
nte nos deberia salir con los datos
. Se han equivocado en un 22% al
ero, la empresa se ha equivocado
taje.
DHR
Metano Aire Aire Aire (J mol-1) G.Comb G.Comb G.Comb
25 T (ºC) = 25 -772340 T (ºC) = 1800
GAS Fase = GAS XL Fase = GAS
25 TRef (ºC) = 25 (mol mol-1) TRef (ºC) = 25
GAS Fase Ref. = GAS 100% Fase Ref. = GAS
Hi xi ni Hi ni xi ni Hi
(kJ) (mol mol-1) (kmol) (kJ) coef. esteq. (mol mol-1) (kmol) (kJ)
0 0 0 0 -1 0 0
0 0.21 0.03033148 0 -2 0.00389838 241.841139
0 0.79 0.11410413 0 0 0.11410413 6689.7255
0 0 0 0 1 0.01321655 1270.32491
0 0 0 0 2 0.02643309 2005.77618
1 0.15765216
0.14443561
4.16552295 4.3769877
0 0 10207.6677
Exceso de aire calculado= 14.75%
8_𝑖𝑛▒∑8_𝑖▒ 〖𝑛 _(𝑖,𝑖𝑛) 𝐶_(𝑝,𝑖) (𝑇_𝑖𝑛−𝑇_𝑟𝑒𝑓) 〗 +(𝑋_𝐿 ∑8_𝑖𝑛▒𝑛_(𝐿,𝑖𝑛) )/|𝜈_𝐿 | (−Δ𝐻_𝑅 )− ∑_𝑜𝑢𝑡▒ 〖∑ _𝑖▒ 〖𝑛 _(𝑖,𝑜𝑢𝑡) 𝐶_(𝑝,𝑖)
G.Ch G.Ch G.Ch
T (ºC) = 235
Fase = GAS
TRef (ºC) = 25
Fase Ref. = GAS Para 1 s
Balances xi ni Hi Qproceso (kJ) Balances
(mol mol )-1
(kmol) (kJ) Base de cálculo = 1 s
0 0
0.00389838 28.6121911
0.11410413 791.460482
0.01321655 150.291962
0.02643309 237.303097
0 4.3769877
-2.5921E-09 1207.66773 9000 6.5842E-07
𝐻_(𝐺.𝐶𝑜𝑚𝑏)=𝐻_(𝐺.𝐶ℎ)+9000 𝑘𝑊×1𝑠
Base de cálculo = 1 s
Ch (235 ºC)
9000 kJ
G (1800 ºC)
A (25 ºC)
M (25ºC)
GCC Gases del Horno
Q Tdespl Q
(MW) (ºC) (MW)
9 360 9
7.6 310 0
8 230 -0.37380192
4.8 210 -1.20766773
5.8 190
0 190
1 170
7.6 150
3 60
Tdesplazada (ºC)
Qproceso (MW)= 9
400 QCh (MW)= 1.20766773
350
QFuel (MW)= 10.2076677
300
h= 88.17%
250
200
150
100 P.V.P Coste
50 (€ (kWh)-1) (€ año-1)
0
0.04 3470607.03
-50
-2 0 2 4 6 8 10 Cuanto nos cuesta realmente el gas natura
tabla real. El caudal de gas natural que no
Q (MW) falta es el de 0,01321 de metano por
segundo.Lo hemos pasado a esas unidade
Lo señalado en azul son los diferentes cos
que nos sale con el problema y lo que
verdaderamente nos deberia salir con los
de gas natural. Se han equivocado en un 2
calcular el dinero, la empresa se ha equivo
en ese porcentaje.
ases del Horno
Tdespl Treal
(ºC) (ºC)
1755 1800
190 235
125 170
-20 25
M Cp
(g mol-1) (J mol-1 K-1)
CH4 = 16
O2 = 32 34.95
N2 = 28 33.03
CO2 = 44 54.15
H2O = 18 42.75
Suma = 1
Calculos = 0.01321655
Masa (kg) = 0.21146475
Entalía (kJ) =
Ahora en lugar de hacerlo como antes lo que haremos sera suponeer un exceso de aire.Ahora nuestro 16% será lo
que tenemos que ajustar.Tenemos que cambiar la corriente de aire lo azul, metiendo un exceso de aire de un 16%
de ahí (1+16%). Lo que tenemos que hacer ahora es analisis de hipotesis del rojo cambiando el exceso de aire,
despues hacerlo con el azul cambiando los moles de metano
DHR
Metano Aire Aire Aire (J mol-1) G.Comb G.Comb G.Comb
25 T (ºC) = 25 -772340 T (ºC) = 1800
GAS Fase = GAS XL Fase = GAS
25 TRef (ºC) = 25 (mol mol-1) TRef (ºC) = 25
GAS Fase Ref. = GAS 100% Fase Ref. = GAS
Hi xi ni Hi ni xi ni Hi
(kJ) (mol mol-1) (kmol) (kJ) coef. esteq. (mol mol-1) (kmol) (kJ)
0 0 0 0 -1 0 0
0 0.21 0.03033148 0 -2 0.00389838 241.841139
0 0.79 0.11410413 0 0 0.11410413 6689.7255
0 0 0 0 1 0.01321655 1270.32491
0 0 0 0 2 0.02643309 2005.77618
1 0.15765216
0.14443561 Exceso de aire
4.16552295 4.3769877
0 0 10207.6677
Exceso de aire calculado= 14.75% Deben salir iguales
Exceso de aire 15%
𝑖𝑛▒∑_𝑖▒ 〖𝑛 _(𝑖,𝑖𝑛) 𝐶_(𝑝,𝑖) (𝑇_𝑖𝑛−𝑇_𝑟𝑒𝑓) 〗 +(𝑋_𝐿 ∑_𝑖𝑛▒𝑛_(𝐿,𝑖𝑛) )/|𝜈_𝐿 | (−Δ𝐻_𝑅 )− ∑_𝑜𝑢𝑡▒ 〖∑ _𝑖▒ 〖𝑛 _(𝑖,𝑜𝑢𝑡) 𝐶_(𝑝,𝑖)
0 4.3769877
2.91038E-11 1207.66773 9000 -3.4452E-09
𝐻_(𝐺.𝐶𝑜𝑚𝑏)=𝐻_(𝐺.𝐶ℎ)+9000 𝑘𝑊×1𝑠
Base de cálculo = 1 s
Ch (235 ºC)
9000 kJ
G (1800 ºC)
A (25 ºC)
M (25ºC)
GCC Gases del Horno
Q Tdespl Q
(MW) (ºC) (MW)
9 360 9
7.6 310 Pinch 0
8 230 -0.37380192
4.8 210 -1.20766773
5.8 190
0 190
1 170
7.6 150
3 60
Tdesplazada (ºC)
Qproc (MW)= 9
400
Qprec(MW)= 0.37380192
350
QCh (MW)= 0.83386581
300
QFuel (MW)= 9.83386581
250
200 h horno = 91.52%
150
100 P.V.P Coste
50 (€ (kWh)-1) (€ año-1)
0
0.04 3343514.38
-50
-2 0 2 4 6 8 10 Cuanto nos cuesta realmente el gas natura
tabla real. El caudal de gas natural que no
Q (MW) falta es el de 0,01321 de metano por
segundo.Lo hemos pasado a esas unidade
Lo señalado en azul son los diferentes cos
que nos sale con el problema y lo que
verdaderamente nos deberia salir con los
de gas natural. Se han equivocado en un 2
calcular el dinero, la empresa se ha equivo
en ese porcentaje.
ases del Horno
Tdespl Treal
(ºC) (ºC)
1755 1800
190 235
125 170
-20 25
M Cp
(g mol-1) (J mol-1 K-1)
CH4 = 16
O2 = 32 34.95
N2 = 28 33.03
CO2 = 44 54.15
zona naranja H2O = 18 42.75
Ahorro Para calcular el ahorro dividimos los 10,2 de fuel
anteriores entre los que tendriamos ahora
1.0380117
Suma = 1
Calculos = 0.01321655
Masa (kg) = 0.21146475
Entalía (kJ) =
Ahora en lugar de hacerlo como antes lo que haremos sera suponeer un exceso de aire.Ahora nuestro 16% será lo
que tenemos que ajustar.Tenemos que cambiar la corriente de aire lo azul, metiendo un exceso de aire de un 16%
de ahí (1+16%). Lo que tenemos que hacer ahora es analisis de hipotesis del rojo cambiando el exceso de aire,
despues hacerlo con el azul cambiando los moles de metano
DHR
Metano Aire Aire Aire (J mol-1) G.Comb G.Comb G.Comb
25 T (ºC) = 25 -772340 T (ºC) = 1800
GAS Fase = GAS XL Fase = GAS
25 TRef (ºC) = 25 (mol mol-1) TRef (ºC) = 25
GAS Fase Ref. = GAS 100% Fase Ref. = GAS
Hi xi ni Hi ni xi ni Hi
(kJ) (mol mol-1) (kmol) (kJ) coef. esteq. (mol mol-1) (kmol) (kJ)
0 0 0 0 -1 0 0
0 0.21 0.03033148 0 -2 0.00389838 241.841139
0 0.79 0.11410413 0 0 0.11410413 6689.7255
0 0 0 0 1 0.01321655 1270.32491
0 0 0 0 2 0.02643309 2005.77618
1 0.15765216
0.14443561 Exceso de aire
4.16552295 4.3769877
0 0 10207.6677
Exceso de aire calculado= 14.75% Deben salir iguales
Exceso de aire 15%
𝑖𝑛▒∑_𝑖▒ 〖𝑛 _(𝑖,𝑖𝑛) 𝐶_(𝑝,𝑖) (𝑇_𝑖𝑛−𝑇_𝑟𝑒𝑓) 〗 +(𝑋_𝐿 ∑_𝑖𝑛▒𝑛_(𝐿,𝑖𝑛) )/|𝜈_𝐿 | (−Δ𝐻_𝑅 )− ∑_𝑜𝑢𝑡▒ 〖∑ _𝑖▒ 〖𝑛 _(𝑖,𝑜𝑢𝑡) 𝐶_(𝑝,𝑖)
0.15765216
0 4.3769877
2.91038E-11 1207.66773 9000 -3.4452E-09
Base de cálculo = 1 s
R (1
∑ _𝑖▒ 〖𝑛 _(𝑖,𝑜𝑢𝑡) 𝐶_(𝑝,𝑖) (𝑇_𝑜𝑢𝑡−𝑇_𝑟𝑒𝑓) 〗 =0 〗
Ch (
𝐻_(𝐺.𝐶𝑜𝑚𝑏)=𝐻_(𝐺.𝐶ℎ)+9000 𝑘𝑊×1𝑠
G (1
A (T>25ºC)
M (2
R R R
T (ºC) = 170
Fase =
TRef (ºC) = 25 para hacer el balance se hace con el
nuevo recinto rojo( el grande) La
Fase Ref. = GAS difetencia es la chimenea de 235 y la de
xi ni Hi R170, eso es lo que tenemos que
incorporarle y volvemos a cambiar la
(mol mol-1) (kmol) (kJ) relacion de exceso de aire otra vez y
0 0 aplocando analisis ysi, como hemos
calentado nos hace falta mas cantidad
de aire para calentar. Tenemos que
cerrar los dos balances primero el de la
cantidad de oxigeno y despues con la
cantidad de combustible
se de cálculo = 1 s
R (170 ºC) Base de cálculo = 1 s
Ch (235 ºC)
A (25 ºC) 9000 kJ
9000 kJ
G (1800 ºC)
A (25 ºC)
M (25ºC)
A (T>25ºC)
M (25ºC)
GCC Gases del Horno
Q Tdespl Q
(MW) (ºC) (MW)
9 360 9
7.6 310 7.6
8 230 7.42076125
4.8 210 7.28027682
5.8 190
0 190
1 170
7.6 150
3 60
Tdesplazada (ºC)
Tdesplazada (ºC)
CP CP DHcold,intervalo Hcold,graf-CC DHintervalo CQNO CQSÍ 350
(kW K-1) (kW K-1) (kW) (kW) (kW) (kW) (kW) 300
0
0
Tdesplazada (ºC)
350
300
250
200
150
100
50
0
0
Servicio de Calor Servicio de Frío
Q Tdespl Treal Q Tdespl Treal
(kW) (ºC) (ºC) (kW) (ºC) (ºC)
0 185 190 0 25 20
0 185 190 6.08 25 20
Tdesplazada (ºC)
350
300
250
200
150
100
50
0
0 1 2 3 4 5 6 7 8
H (MW)
Tdesplazada (ºC)
350
300
250
200
150
100
50
0
0 1 2 3 4 5 6 7 8
Q (MW)