This document outlines the process for monitoring and evaluating locally-funded projects (LFPs) and performance challenge funds (PCFs) in the Cordillera Administrative Region of the Philippines. It sets an objective of completing monitoring for 80% of LFPs and PCFs within their prescribed timelines. Progress is tracked monthly using indicators for the total number of projects completed on time and the total number of projects. For the current period of April 2020, the target result was not met and a gap analysis is required to determine why. Unmet targets will result in corrective actions being issued.
This document outlines the process for monitoring and evaluating locally-funded projects (LFPs) and performance challenge funds (PCFs) in the Cordillera Administrative Region of the Philippines. It sets an objective of completing monitoring for 80% of LFPs and PCFs within their prescribed timelines. Progress is tracked monthly using indicators for the total number of projects completed on time and the total number of projects. For the current period of April 2020, the target result was not met and a gap analysis is required to determine why. Unmet targets will result in corrective actions being issued.
This document outlines the process for monitoring and evaluating locally-funded projects (LFPs) and performance challenge funds (PCFs) in the Cordillera Administrative Region of the Philippines. It sets an objective of completing monitoring for 80% of LFPs and PCFs within their prescribed timelines. Progress is tracked monthly using indicators for the total number of projects completed on time and the total number of projects. For the current period of April 2020, the target result was not met and a gap analysis is required to determine why. Unmet targets will result in corrective actions being issued.
QME-QP-CAR-08 PROCESS QUALITY MONITORING AND Rev. No. Eff. Date Page 02 03.15.19 1 of 1 EVALUATION (QME) OFFICE MONITORING AND EVALUATION OF LOCALLY-FUNDED PROJECTS (LFPs) AND PERFORMANCE PROCEDURE TITLE CHALLENGE FUND (PCF) OBJECTIVE 80 % of LFPs and PCF projects are completed through monitoring within prescribed timeline STATEMENT CURRENT PERIOD April 2020 INDICATORS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total Objective: 80 % of LFPs and PCF projects are completed through monitoring within prescribed timeline A Total number of LFPs & PCF projects 0 0 4 0 4 completed within prescribed timeline B Total number of LFPs & PCF projects 18 18 18 18 18 C Formula: A x 100 Target Result : 22.22 B 0 0 0 80% % D Gap Analysis: (In case the objective is not met, put your analysis why it is not met) Note: For unmet targets, the QMS Secretariat will issue correction and corrective action using the Corrective Action Report (CAR) duly signed by the QMR.
Prepared By: Noted By:
GYDA H. NAMINGIT REGINA ELIZABETH L. MAMMAG
Deputy Quality Management Process Owner Representative