Site and Programmatic Appraisal Pro-Forma: Team Name
Site and Programmatic Appraisal Pro-Forma: Team Name
(Costed precedent #1 - informing strategic, programmatic or architectural response) (Costed precedent #2 - informing strategic, programmatic or architectural response)
The Bristol Old Vic was chosen as precedent for it’s similar program, it’s relation to the historical building Funding: Private
on site and reflectance to our architectural vision. We choose The Parchment Works as a second precedent mainly because it represents our design
intention and built form.
The project has completed a new foyer and studio theatre for the Grade I listed Bristol Old Vic. The
extension connects the street to the historical building. In terms of cost, this project lies on the high end This project involves a contemporary extension within the ruin walls of a scheduled monument.
site with it’s £4,439.18 per m2. But we can say that the value for money is justified. The project adopts The design concept behind this was to design a ‘building within a building’ the extension is sub-
a number of low impact design features like shutters reducing the solar gain, or prefabricated elements merged in the ruins respecting the historical site.
allowing for rapid assembly and it achieves BREEAM rating 56.2%.
The extension was predominantly build with up-cycled materials found on site wich add to a sus-
The quality of the building and the sustainable approach undertaken during construction and completion tainable approach.
will make the expected life span of the building longer and the running cost lower.
The project is also a great example of a good value for money. High quality building is achieved
In terms of revenue the program added by the construction of the foyer includes a cafe, bar and a with a smaller budget. The average cost per m2 is £1362 which in comparison to the first prece-
meeting place that will bring additional revenue. dent is almost three times less.
(Identify the cost estimate on opening and significant running and life cycle costs for your project)
(Identify targetted sources of funding and potential sources of revenue for your project)
Once a more informed elemental cost estimate is gained at RIBA WS 2, a cost-plan update would be - The National Lottery Heritage Fund | £500,000
required. For an estimated construction period of 8-10 months, we would compare the BCIS RICS - Llandaff Cathedral School reserves | £1m
Q4 2020 Tender Price Index (TPI) with the Q3 2021 TPI by means of division in order to find the price - Potential over sourcing | Royal Welsh College of Music & Drama, Higher Education Funding
inflation index (adjustment factor). From this we gain a final inflated value by means of multiplication.
Council for Wales HEFCW, Open door Wales, National Assembly for Wales.