Team Name: Team 4

SITE AND PROGRAMMATIC APPRAISAL pro-forma (1/3)


We aim on utilising the Existing Grade I Listed built fabric as a historic division between reception spaces and private performance spaces, thus striking a public/private frontage (Identify risks/considerations
and successfully integrating the building into the surrounding physical context. to viability of the project; e.g.
operational, consents, etc. relating
The scheme will look to provide ease of access for both members of the LLandaff Cathedral School and private guests and professional for performances during the evenings, to realities such as the presence of
trees, historic fabric, routes through,
while ensuring . Improved direct access to the scheme will enable all round efficiency of the building from construction through to functional usage as below:
etc.)
-Phase construction management strategy
-Waste management Historic Fabric: Ancient monument.
-Access strategy Originally had 3 towers, with
-Fire Strategy wooden structures in the centre,
-Delivery and Equipment Installment Access potential to consider reinstating a
timber structure in respect to the
-The orinetation and positioning of the scheme within the context of the site allows maximum benefit from South Westerly prevailing wind, and therefore allowing natural purge site’s heritage. Bares similarity to
ventilation and potential for an Air-Source Heat Pump and/or turbine to contribute to a self-sufficient, sustainable building. Caerphilly castle, concentric defenses
design with large gatehouse.
Public/ Event Parking
Speculative footprint Consents: Requires Listed Building
Historic Site Consent from Cardiff Council,
Visitor Access who takes advice from heritage
School Access agency cadw. With this we
Public Access would need to provide a heritage
Loading Bay/ impact statement. Change of use
Coach Access
Operational: Potential issues with
construction management in
terms of placement of materials,
contractors lodgings within curtilage
walls. May require additional
space on school grounds, or to
stagger development over time.

Covid-19: The pandemic posts multiple


challenges for the construction
and inhabitation of the proposal.
Within the construction industry,
labor and supply chain shortages
along with financial pressures
claim further time extensions. Post-
External Performance Space pandemic strategies will also have
to be considered for the planning
1 of interior, and exterior spaces.

2 Routes: We intend to divert the


existing path that passes through
3
the site to enable for more
space within the existing walls.
to viability of the project; e.g.
operational, consents, etc. relating to
realities such as the presence of trees,
Elevated View Points Prevailing Wind Phased Construction Management historic fabric, routes through, etc.)
SITE AND PROGRAMMATIC APPRAISAL pro-forma (2/3) Please update this document by inputting relevant information into the spaces provided.

Additional promotors/stakeholders/users: Outline Accommodation Schedule:


-Lobby
10 sqm -1-2 Classrooms/multifunction rooms 55sqm for 30 stu-
dents (taller ceilings with spring floor for dance lessons)
-Reception
15 sqm -Storage space
Possible Promoters/ Stakeholder’s:
-Refreshments space -Shop units for local businesses (dependant on business)
-Royal Welsh College of Music & Drama, Higher Education Funding Council for Wales HEFCW, Open door 1.5sqm/pp
-Administration 10-12 sqm standard office, 4-6 sqm front
Wales, National Assembly for Wales. -Toilets desk
1.04 sqm/per unit,
-Eisteddfod, creating open-air performance spaces would benefit as they might use the development as 3.3 sqm/per unit-wheelchair accessible -Auditorium: 100-150
a potential performance/competition venue
-Dressing rooms 1.1 sqm/pp. -0.7 sqm/per seating
-Local Businesses to occupy shop units, benefitting local economy -Practice rooms 1.4sqm/pp, instruments >10cbm pp. -Outdoor space: 50-70

Users: Visual Link


Physical Link
-Primary and Secondary Schools

-The general public *[Draft Programme concept


to be further refined and
should not be used as a
-The Royal Welsh College of Music and Drama will be able to host plays and theatre lessons to schools basis for design. Floor space
within the local community. Students from primary and secondary education will be able to learn from and occupant levels to be
graduate students. According to Cardiff LDP 2015, Llandaff society complained about lack of communi- confirmed in accordance with
ty facilities and and local employment opportunities.By collaborating with The Royal Welsh College of Approved document B Table
D1 [Floor Space Factors].
Music and Drama, the development would open up job opportunities for fresh graduates, and creates a
Sanitary provision also to
positive cycle within the realm of performing arts education in Cardiff. be confirmed at 70% of
occupancy level.] *
-On weekends (and potentially evenings), ‘open-mic’ type plays can take place in the internal courtyard
where money generated from the general public can be pumped into non-profit (or for-profit) causes.
SITE AND PROGRAMMATIC APPRAISAL pro-forma (3/3) Please update this document by inputting relevant information into the spaces provided.

(Costed precedent #1 - informing strategic, programmatic or architectural response) (Costed precedent #2 - informing strategic, programmatic or architectural response)

Bristol Old Vic The Parchment Works

Architects: Haworth Tompkins Architects: WillGamble/Architects


Grade one listed building Location: Northamptonshire
Type: Residential (Grade II Listed Building)
Cost analysis
Average cost/m2: £4,439.18 Cost analysis:
Total cost: £4,563,500 Average cost/m2: £1361,11
GFA: 2,096.6m2 Total cost: £245,000
GEA: 2,910m2 GFA: 180m2

The Bristol Old Vic was chosen as precedent for it’s similar program, it’s relation to the historical building Funding: Private
on site and reflectance to our architectural vision. We choose The Parchment Works as a second precedent mainly because it represents our design
intention and built form.
The project has completed a new foyer and studio theatre for the Grade I listed Bristol Old Vic. The
extension connects the street to the historical building. In terms of cost, this project lies on the high end This project involves a contemporary extension within the ruin walls of a scheduled monument.
site with it’s £4,439.18 per m2. But we can say that the value for money is justified. The project adopts The design concept behind this was to design a ‘building within a building’ the extension is sub-
a number of low impact design features like shutters reducing the solar gain, or prefabricated elements merged in the ruins respecting the historical site.
allowing for rapid assembly and it achieves BREEAM rating 56.2%.
The extension was predominantly build with up-cycled materials found on site wich add to a sus-
The quality of the building and the sustainable approach undertaken during construction and completion tainable approach.
will make the expected life span of the building longer and the running cost lower.
The project is also a great example of a good value for money. High quality building is achieved
In terms of revenue the program added by the construction of the foyer includes a cafe, bar and a with a smaller budget. The average cost per m2 is £1362 which in comparison to the first prece-
meeting place that will bring additional revenue. dent is almost three times less.

(Identify the cost estimate on opening and significant running and life cycle costs for your project)

(Identify targetted sources of funding and potential sources of revenue for your project)

Once a more informed elemental cost estimate is gained at RIBA WS 2, a cost-plan update would be - The National Lottery Heritage Fund | £500,000
required. For an estimated construction period of 8-10 months, we would compare the BCIS RICS - Llandaff Cathedral School reserves | £1m
Q4 2020 Tender Price Index (TPI) with the Q3 2021 TPI by means of division in order to find the price - Potential over sourcing | Royal Welsh College of Music & Drama, Higher Education Funding
inflation index (adjustment factor). From this we gain a final inflated value by means of multiplication.
Council for Wales HEFCW, Open door Wales, National Assembly for Wales.