CONSTRUCTION OF 564 MLD (124 MGD) WWTP WITH EFFLUENT STANDARDS OF BOD – 10 MG/L, TSS – 10 MG/L OR BETTER
AND POWER GENERATION ON DBO BASIS AT OKHLA UNDER YAP‐III (PACKAGE‐O)
CONTRACT NO‐ B‐001586
CONTRACTOR ‐ SUEZ
Date Date of Casting
Structure Drawing No.
Activity
Conc. Grade M Cement ‐
C S M1
Mix Proportion ( Kg):
M2 M3 W
Water/Cement Ratio Admixture
Checked By
Sr.No Description Remarks
SUEZ NJS DJB
1 Stage Passing
2 Center Line & Level
3 Reinforcement and Cover
4 Formwork,Staging,Supports
5 Material & Equipments
6 Water Stoper
7 Embedded Parts Civil / Mechanical / Electrical
Pour released for concreting:
Concrete time
Slump at site:
Concrete Qty Concrete Consumed
Steel Qty
SUEZ ISGEC
CONSTRUCTION OF 564 MLD (124 MGD) WWTP WITH EFFLUENT STANDARDS OF BOD – 10 MG/L, TSS – 10 MG/L OR BETTER AND POWER
GENERATION ON DBO BASIS AT OKHLA UNDER YAP‐III (PACKAGE‐O)
CONTRACT NO :B‐001586
CONTRACTOR : SUEZ
Pour Card No‐ Date:
Name of Structure : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Activity Details :_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Conc.Grade :
Concrete/ Formwork
Sr. No. Description No L B D QTY
Concrete / Formwork
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Sr. No. Water ‐ Stops
Description No Length QTY
1
2
3
4 Total
SUEZ ISGEC
CONSTRUCTION OF 564 MLD (124 MGD) WWTP WITH EFFLUENT STANDARDS OF BOD – 10 MG/L, TSS – 10 MG/L OR BETTER
AND POWER GENERATION ON DBO BASIS AT OKHLA UNDER YAP‐III (PACKAGE‐O)
CONTRACT NO‐ B‐001586
CONTRACTOR ‐ SUEZ
Pour Card No‐ Date‐
Name of Structure ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Activity Details‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
STEEL
Description Shape of
Sr.No Dia Nos Spacing C.L. WL/M Total Weight Remark
( Bar Location) Bar
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
SUEZ ISGEC