Table - 1 : Total Qty of Raw materials required to achieve the balance qty of 3614 m3 (Including RCC &
TABLE - A (Co-efficient for different proportions as per Mix Design)
PCC)
Co- Co-
Co-efficient of Co-efficient of
Total Qty efficient of efficient of
Desc. Of material M-25 M-30 M-35 M-15 Des. Of Material M-25/Cum M-30/Cum
(MT) M-35/Cum M-15/Cum
(MT) (MT)
(MT) (MT)
10 mm 105.105 839.322 389.172 355.6 1689.199 10 mm 0.637 0.628 0.574 0.508
20 mm 112.2 896.7915 412.224 533.4 1954.6155 20 mm 0.680 0.671 0.608 0.762
Sand 99.165 792.5445 440.022 546 1877.7315 Sand 0.601 0.593 0.649 0.78
Cement 61.875 534.6 440.022 173.6 1210.097 Cement 0.375 0.400 0.44 0.248
Admixture 0.495 4.0095 2.034 0.81705 7.35555 Admixture 0.003 0.003 0.003 0.0013
Batching
Batching Qummulative
Plant - 02 Required qty
Desc. Of material Plant - 01 Total qty Desc. Of material
(MT)
(MT) (MT)
(MT)
10 mm 280 250 530 10 mm 1159.199 975.8
20 mm 360 300 660 20 mm 1294.6155 1033.6
Sand 72 144 216 Sand 1661.7315 1103.3
Cement 95 82.25 177.25 3545.00 in Bags Cement 1032.847 748
Admixture 3.6 7.2 10.8 48 In Barrels Admixture - Available in sufficient qty 5.1
RCC Production Summary
Batching Plant -1 Batching Plant - 2 Cumillative
Sl. No. Date Total Remarks
Qty
PCC RCC PCC RCC
1 10/1/2020 0.00 75.00 0.00 90.00 165.00 165.00
2 10/2/2020 0.00 0.00 0.00 0.00 0.00 165.00
3 10/3/2020 0.00 73.00 0.00 86.50 159.50 324.50
4 10/4/2020 38.00 0.00 0.00 0.00 38.00 362.50
5 10/5/2020 5.00 0.00 0.00 0.00 5.00 367.50
6 10/6/2020 6.00 0.00 0.00 0.00 6.00 373.50
7 10/7/2020 6.00 0.00 16.00 0.00 22.00 395.50
8 10/8/2020 0.00 0.00 0.00 0.00 0.00 395.50
9 10/9/2020 2.50 0.00 0.00 0.00 2.50 398.00
10 10/10/2020 51.50 0.00 20.00 0.00 71.50 469.50
11 10/11/2020 23.00 0.00 4.00 0.00 27.00 496.50
12 10/12/2020 29.50 0.00 2.00 13.00 44.50 541.00
13 10/13/2020 3.00 67.00 0.00 25.00 95.00 636.00
14 10/14/2020 22.00 135.00 0.00 138.00 295.00 931.00 1 m3
15 10/15/2020 3.00 6.00 0.00 93.00 102.00 1033.00
16 10/16/2020 0.00 86.00 0.00 89.00 175.00 1208.00
17 10/17/2020 0.00 0.00 0.00 0.00 0.00 1208.00
18 10/18/2020 0.00 0.00 0.00 0.00 0.00 1208.00
19 10/19/2020 0.00 40.50 0.00 72.00 112.50 1320.50
20 10/20/2020 42.50 54.00 0.00 37.00 133.50 1454.00
21 10/21/2020 35.00 74.00 88.00 0.00 197.00 1651.00
22 10/22/2020 6.00 0.00 46.00 0.00 52.00 1703.00
23 10/23/2020 6.00 218.00 7.00 172.00 403.00 2106.00
24 10/24/2020 0.00 198.00 0.00 131.00 329.00 2435.00
25 10/25/2020 0.00 87.50 0.00 18.00 105.50 2540.50
26 10/26/2020 0.00 78.00 0.00 102.00 180.00 2720.50
27 10/27/2020 0.00 137.00 61.00 97.50 295.50 3016.00
28 10/28/2020 12.00 6.00 33.00 61.00 112.00 3128.00
29 10/29/2020 0.00 257.50 6.00 198.00 461.50 3589.50
30 10/30/2020 0.00 0.00 0.00 80.00 80.00 3669.50
31 10/31/2020 6.00 114.00 18.00 87.00 225.00 3894.50
June 551
July 720
August 439
Sep 402
1270.5 RCC
Oct 2800 Including Pcc & Rcc
6182.5