Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Transition

Concrete pavement -.,-------'-'~SI~Ob=-~~ Flexible pavement


20nm Oio.600mm long D 300mm clc ot mid·depth---~

GlASGRID or 8(JJivolent
Contraction joint (see Drg. No. H1106Al--~\
40 Thick weoring cOU"se

750 750 65 Thick base course


I I
';~::~lllllllllllllllllllllllllllllill.mI.
_ <1_ I ..a~,
, A
,. •b Conc. slob <':::6 \ III III
~-;~~-~ ~~; 1\ :;'_~
_ d I -
- -d /
<\ - 6 j.-------conc.-Slab '-<...
J -_/D

Subbase ~,~\
<\ I~'~~ \

\ 1500 rn 19>t lilling PVC anti ·corrosive sleeve


2000 min.
6000 max 2000

B Ceogrid • nole 2 odded Nov 96


Notes:
A Description 01 sleeve revised Sepl96
1. All dinensions ore in mmimelres. Former o..g. No. H1005A
2. The geogrid to be used shall be a self altlesive Stress Adsorbing Membrance I1terlayer with a minirrun lensile streng(h .llne 94
with general revision
across width of 200 KN/m and alang length 100 KN/m, and the modulus of elasticity 01 the material is not less than 69,000 11'0.
REF. REVISION SICNATUR DATE

HIGHWA YS DEPARTMENT
TYPICAL TRANSITION BETWEEN REFERENCE DRAWING No. I CAD
CONCRETE AND FLEXIBLE PAVEMENTS SCALE H 111DB
Oiogronvno(ic

You might also like