Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Aplication Form

project information document MALVERN PROJECT No:


COMPANY INFORMATION
1 COMPANY NAME

2 PLANT / FACTORY NAME

3 ADDRESS 1

4 ADDRESS 2

5 ADDRESS 3

6 TOWN / CITY

7 STATE / PROVINCE

8 POST / ZIP CODE TEL No (SB)

9 COUNTRY

10 CLIENT’s PROJECT No

11 CLIENT’s PROJECT NAME

PLANT PERSONNEL NAME TEL No E-Mail


12 PROJECT LEADER

13 PROCESS ENGINEER

14 QUALITY MANAGER

15 PRODUCTION MANAGER

16 PURCHASING MANAGER

17 INSTRUMENT ENGINEER

18 ELECTRICAL ENGINEER

19 SAFETY OFFICER

PROCESS SPECIFICATIONS
20 PROCESS NAME

21 PRODUCT NAME

22 No OF PRODUCTS ON THIS
LINE
23 No OF PROCESS LINES

24 PROCESS LINE SHAPE/S ROUND DIAMETER METRES

SQUARE x METRES

25 MATERIAL of
CONSTRUCTION
26 PROCESS LINE WEAR RESISTANCE LINING CERAMIC RUBBER OTHER

27 FLOW STYLE PNEUMATIC GRAVITY

28 CARRIER GAS (Eg: Air OR


Nitrogen)
29 PROCESS LINE PRESSURE UNITS

30 CARRIER GAS FLOW RATE m3/Hr

31 PROCESS GAS VELOCITY m/Sec

32 PROCESS LINE TEMP 0


C

33 HAZARDOUS ENVIRONMENT RATING ATEX / FM ZONE CLASS

34 CABLE LENGTH FROM SAMPLING LOCATION TO CONTROL ROOM METRES

PRODUCT SPECIFICATIONS
35 TYPE OF MATERIAL (Eg; powder/spray/slurry)

36 PRODUCT COMPOSITION

37 MATERIAL CHARACTERISTICS (Eg; Abrasive/Fragile/Sticky)

38 MASS FLOW RATE and VISCOSITY Kgs/Hr

39 PARTICLE SIZE RANGE MIN MAX

40 AVERAGE PARTICLE SIZE (Dv50) um

41 SURFACE MEAN DIAMETER D[3,2] um

42 PSD SIZE RANGE REQUIRED (um) 0.1-200 1.0-400 1.5-600


2.25-1000 50-5000
43 PARTICLE DENSITY (Not bulk Density) gm/cc

PLANT SERVICES
44 SITE VOLTAGE 110v 220v 240v

45 FREQUENCY Hz 50 Hz 60 Hz

46 COMPRESSED GAS SUPPLY AVAILABLE 6 bar other bar

47 3
30m /Hr GAS FLOW AVAILABLE YES NO

48 AIR QUALITY TO ISO 8537-1 CLASS 1.7.2 YES NO

SYSTEM INTEGRATION & AUTOMATION

Page 1 of 3
Aplication Form
49 AUTOMATIC CONTROL OF ANALYSER REQUIRED YES NO

50 MEASUREMENT START-STOP BY PLANT CONTROL SYSTEM YES NO

51 OPERATOR FREE OPERATION YES NO

52 EXPORT OF PARTICLE SIZE DATA REQUIRED YES NO

53 PSD PARAMETERS TO BE EXPORTED


54 CONTROL VALVES BALL VALVES PINCH VALVES OTHER

55 AUTOMATIC SYSTEM ERROR REPORTING YES NO

56 PARTICLE SIZE WARNING & ERROR REPORTING YES NO

57 CONNECTION TO PLANT DCS / PLC SYSTEM YES NO

58 DCS TYPE SUPPLIER MODEL No

59 PLC TYPE SUPPLIER MODEL No

60 DATA EXPORT PROTOCOLS 4-20mA 0-10v MODBUS OTHER

ENVIRONMENT
61 AMBIENT TEMP RANGE MIN MAX

62 HUMIDITY RANGE MIN MAX

63 THUNDERSTORM FREQUENCY (DAYS/Yr)

64 INDOOR / OUTDOOR LOCATION

PLANT OPERATION
65 PLANT OPERATION Hrs / Day

66 PLANT OPERATION Days / Week

67 PLANT OPERATION Days / Year

68 OFF-LINE SAMPLE MEASUREMENT FREQUENCY Measurements every x Hrs

69 Kgs WASTE / OFF-SPEC PRODUCED PER DAY Kgs

70 No OF START-UPS PER DAY


71 No OF PRODUCT CHANGE-OVERS PER DAY
72 IN-SPEC PRODUCT SELLING PRICE $ / Kg

73 OFF-SPEC PRODUCT SELLING PRICE $ / Kg

CUSTOMER AMBITIONS
74 IMPROVE PROCESS UNDERSTANDING
75 PROCESS AUTOMATION
76 IMPROVE PRODUCT QAULITY
77 REDUCE OFF-SPEC PRODUCTION
78 REDUCE RE-PROCESSING TIME
79 GRIT DETECTION
80 MONITORING OF FINES
81 OPERATING COST REDUCTION
82 OTHER (PLEASE SPECIFY)

DESCRIPTION OF THE PROCESS


83 UPSTREAM PROCESSES OR HARDWARE
84 DOWNSTREAM PROCESSES OR HARDWARE
85 SKETCH OF THE PROCESS SHOWING THE SAMPLING LOCATION FOR THE ON-LINE ANALYSER

Page 2 of 3
Aplication Form
86

87 DIGITAL PICTUIRES OF THE SAMPLE POINT


88 ENGINEERING DRAWINGS OF THE SAMPLING LOCATION

COMMERCIAL
89 No OF PLANTS IN THIS COMPANY
90 No OF PROCESS LINES FOR THIS PRODUCT
91 IS THIS PROJECT FOR A NEW PLANT ? YES NO
92 IS THIS PROJECT FOR A PLANT UPGRADE ? YES NO
93 IS THERE BUDGET AVAILABLE ? YES NO
94 HOW MUCH BUDGET IS AVAILABLE ?
95 WHEN IS BUDGET AVAILABLE ? NOW 3 MONTHS 6 MONTHS 12 MONTHS

Page 3 of 3

You might also like