Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PETROFAC INTERNATIONAL (UAE) LLC.

SUB CONTRACTOR DOCUMENT TRANSMITTAL

TO: DATE:04/11/2020 JOB: JI-2045


SARPI

PROJECT : AIN TSILA DEVELOPMENT

Attn:
TRANSMITTAL NO. TR-PIUL-SARPI-0051

TRANSMITTING OF : STANDARD PIPE SUPPORT SPECIFICATION-ETC..

SL DOCUMENT NO. REV. DOCUMENT TITLE CODE


NO.

1 A-PIP-SPE-000-30006 1 STANDARD PIPE SUPPORT SPECIFICATION

2 C-PIP-LAY-000-30001 1H CENTRAL PROCESSING FACILITY OVERALL PLOT PLAN

LEGEND FOR CODE


1 - Accepted without comments
2 - Accepted with comments.
3 - Not Accepted. Revise and resubmit.
4 - For Information.
5 - Void-Cancelled / Superseded.

REMARKS:

ISSUE REASON: IFC-Issued for construction (Hold Free)

TRANSMITTED BY:

Ved Prakash Gupta


Project Director

Received by:
(Signature)

Please acknowledge receipt by signing and returning


Name:
a copy of this transmittal to
Petrofac, PO Box. 23467, Sharjah, UAE. Date:
Tel.: +971-6-5740999, Fax: +971-6-5740099
Attention : Document Controller ( JI-2045)

You might also like