Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

1.00 Aggrregate Filling on Podium

Providing & Filling with aggregates of 20mm & below down graded aggregates,
whereever as directed by EIC, including watering and consolidating in 50mm
1.01 thick layer, etc., as per specification complete, The rate shall be including all Sqm 8287.65 8703.00
labours,tools & tackels,all leads & lifts,etc.complete as per directions of
Engineer-in-charge.

Geo Fabric : Providing & Laying of 150 GSM geo fabric of approved
manufacturer / Make as per BDPL Approval, whereever as directed etc., as per
1.02 Sqm 8287.65 8703.00
specification complete, The rate shall be including all labours,tools & tackels,all
leads & lifts,etc.complete as per directions of Engineer-in-charge.

2.00 Pathway around Building

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
2.01 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Cum 87.89 93.00
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
2.02 scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as Sqm 166.95 176.00
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Geo Fabric : Providing & Laying of 150 GSM geo fabric of approved
manufacturer / Make as per BDPL Approval, whereever as directed etc., as per
2.03 Sqm 550.95 579.00
specification complete, The rate shall be including all labours,tools & tackels,all
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and filling Quarry dust as per BDPL Approval, whereever as directed
2.04 etc., as per specification complete, The rate shall be including all labours,tools & Cum 23.97 26.00
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
2.05 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 798.96 839.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and Fixing of 40mm thk Flamed Sadarahalli Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
2.06 sealant of approved colour, keeping the completed granite covered with 1 720.97 758.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Page 1 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and Fixing of 40mm thk Pre Polished Steel Grey as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
2.07 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 200mm Band Rmt 174.00 183.00


b 500mm Band Sqm 43.19 46.00

3.00 Pathway near Seating Plaza - South Side Podium

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
3.01 Cum 55.34 59.00
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
3.02 Sqm 85.35 90.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Geo Fabric : Providing & Laying of 150 GSM geo fabric of approved
manufacturer / Make as per BDPL Approval, whereever as directed etc., as per
3.03 Sqm 256.04 269.00
specification complete, The rate shall be including all labours,tools & tackels,all
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and filling Quarry dust as per BDPL Approval, whereever as directed
3.04 etc., as per specification complete, The rate shall be including all labours,tools & Cum 5.03 6.00
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
3.05 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 503.11 529.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and Fixing of 20mm thk Flamed Sadarahalli Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
3.05 sealant of approved colour, keeping the completed granite covered with Sqm 475.01 499.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Page 2 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and Fixing of 20mm thk Pre Polished Steel Grey as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
3.06 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 200mm Band Rmt 138.00 145.00

4.00 Pathway - West Side Podium

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
4.01 Cum 25.63 27.00
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
4.02 Sqm 47.40 50.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Geo Fabric : Providing & Laying of 150 GSM geo fabric of approved
manufacturer / Make as per BDPL Approval, whereever as directed etc., as per
4.03 Sqm 142.20 150.00
specification complete, The rate shall be including all labours,tools & tackels,all
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and filling Quarry dust as per BDPL Approval, whereever as directed
4.04 etc., as per specification complete, The rate shall be including all labours,tools & Cum 2.33 3.00
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
4.05 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 233.04 245.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and Fixing of 20mm thk Flamed Sadarahalli Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
4.06 sealant of approved colour, keeping the completed granite covered with Sqm 212.22 223.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Page 3 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and Fixing of 20mm thk Pre Polished Steel Grey as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
4.07 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 200mm Band Rmt 104.10 110.00

5.00 Rear Lobby

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
5.01 Cum 18.40 20.00
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Geo Fabric : Providing & Laying of 150 GSM geo fabric of approved
manufacturer / Make as per BDPL Approval, whereever as directed etc., as per
5.02 specification complete, The rate shall be including all labours,tools & tackels,all Sqm 167.29 176.00
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing & Filling with Cinder as approved, whereever as directed by EIC,


including consolidating in 100mm thick layer, etc., as per specification
5.03 Cum 51.86 55.00
complete, The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
5.04 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 167.29 176.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and Fixing of 20mm thk Flamed Sadarahalli Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
5.05 sealant of approved colour, keeping the completed granite covered with Sqm 130.87 138.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and Fixing of 20mm thk Pre Polished Steel Grey as per BDPL of
approved colour & sizes with necessary Grooves as indicated on the drawings,
fixing in cement mortar 1:4 with Cebex 112 as detailed above at all the levels
with all edges of the panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant of approved
5.06 colour, keeping the completed granite covered with Bubble sheet for
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

a 500mm Band Sqm 36.42 39.00

Page 4 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

6.00 Driveway under Grasscell

Providing and filling Quarry dust as per BDPL Approval, whereever as directed
6.01 etc., as per specification complete, The rate shall be including all labours,tools & Cum 284.83 300.00
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

Grass Cell Pavers: Supply and fixing of 38mm thk PVC grass cell pavers on 50mm
thk sand bed for fire driveway as per specification, cost including all materials at
6.02 Sqm 2278.67 2393.00
site, necessary machineries, all labour charges and other necessary charges to
complete.

7.00 Planter Around Building

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
7.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a) Raft Cum 39.22 42.00


b) Wall Cum 45.75 49.00

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
7.02 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 7.65 9.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
7.03 thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a) Raft Sqm 130.73 138.00


b) Wall Sqm 610.06 641.00

Providing and laying of pre-polished 20mm thk. Granite slab of 250mm width
for coping in panel @ LEDGE / Sill and other area as specied by Client /
Architect., sizes as indicated in the drawings and as per BDPL Approval, set in
cement mortar 1:4 with necessary Chamfering and Edge polishing. The rate
quoted shall including making holes for grill fixing, The joints are finished /
7.04 pointing neatly with pigment to match the colour of stone, keeping the Rmt 435.76 458.00
completed granite covered with Plaster of Paris for protection and cleaning of
the same till handing over, including cost of materials, labour, Wastages, HOM,
Tools & Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge. including
working at all heights with lead & lift.etc. complete.

Page 5 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer
Option 1

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
7.05 sealant of approved colour, keeping the completed granite covered with Sqm 263.11 277.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Option 2

Providing and laying of 20mm THK Steel Grey Granite Skirting of 100mm height
in cement mortar 1:4 as detailed above at all the levels with all edges to have
Chamfered & mirror polished as per design with necessary Groove cutting and
detail all complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of approved
7.06 colour, keeping the completed granite covered with Bubble sheet for Rmt 440.16 454.00
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
7.07 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 219.09 226.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


7.08 approved shade and make and as per manufacturer specification, cost including Sqm 219.09 226.00
all materials at site, all labor charges and other necessary charges to complete

8.00 Planter Cum Seaters - 1600mm x 1600mm - 15 No.s

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
8.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a) Bottom Slab Cum 5.76 7.00


b) Wall Cum 7.83 9.00

Page 6 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
8.02 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 1.22 2.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
8.03
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a) Bottom Slab Sqm 14.40 16.00


b) Wall Sqm 104.40 110.00

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
8.04 Sqm 57.60 61.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.

Providing waterproof plaster 15mm thick for Block, RCC Surface etc. at all levels
in waterproof cement mortar 1:6 (using approved waterproofing compound
8.05 Sqm 57.60 61.00
added as per manufacturers instructions), finished to line and level to approved
texture, including all leads, lifts, scaffolding and curing etc., complete.

Providing and laying of pre-polished 20mm thk. Granite slab for coping in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
8.06 pigment to match the colour of stone, keeping the completed granite covered Sqm 20.59 22.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Option 1

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
8.07 sealant of approved colour, keeping the completed granite covered with Sqm 72.00 76.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Page 7 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer
Option 2

Providing and laying of 20mm THK Steel Grey Granite Skirting of 100mm height
in cement mortar 1:4 as detailed above at all the levels with all edges to have
Chamfered & mirror polished as per design with necessary Groove cutting and
detail all complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of approved
8.08 colour, keeping the completed granite covered with Bubble sheet for Rmt 96.00 99.00
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
8.09 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 62.40 65.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


8.1 approved shade and make and as per manufacturer specification, cost including Sqm 62.40 65.00
all materials at site, all labor charges and other necessary charges to complete

9.00 Planter Cum Seaters - 3600mm x 1600mm - 7 No.s

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
9.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a) Bottom Slab Cum 6.05 7.00


b) Wall Cum 6.36 7.00

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
9.02 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Page 8 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 1.12 2.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
9.03 thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a) Bottom Slab Sqm 10.92 12.00


b) Wall Sqm 87.36 92.00

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
9.04 Sqm 30.24 32.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.

Providing waterproof plaster 15mm thick for Block, RCC Surface etc. at all levels
in waterproof cement mortar 1:6 (using approved waterproofing compound
9.05 Sqm 30.24 32.00
added as per manufacturers instructions), finished to line and level to approved
texture, including all leads, lifts, scaffolding and curing etc., complete.

Providing and laying of pre-polished 20mm thk. Granite slab for coping in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
9.04 pigment to match the colour of stone, keeping the completed granite covered Sqm 19.43 21.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Option 1

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
9.05 sealant of approved colour, keeping the completed granite covered with Sqm 75.60 80.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Option 2

Page 9 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying of 20mm THK Steel Grey Granite Skirting of 100mm height
in cement mortar 1:4 as detailed above at all the levels with all edges to have
Chamfered & mirror polished as per design with necessary Groove cutting and
detail all complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of approved
9.06 colour, keeping the completed granite covered with Bubble sheet for Rmt 100.80 104.00
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
9.07 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 65.52 68.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


9.08 approved shade and make and as per manufacturer specification, cost including Sqm 65.52 68.00
all materials at site, all labor charges and other necessary charges to complete

10.00 Planter Cum Seaters - 3000mm x 3000mm - 3 No.s

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
10.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a) Bottom Slab Cum 4.05 5.00


b) Wall Cum 3.16 4.00

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
10.02 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Page 10 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 0.65 1.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
10.03 thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a) Bottom Slab Sqm 5.40 6.00


b) Wall Sqm 43.20 46.00

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
10.04 Sqm 43.20 46.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.

Providing waterproof plaster 15mm thick for Block, RCC Surface etc. at all levels
in waterproof cement mortar 1:6 (using approved waterproofing compound
10.05 Sqm 43.20 46.00
added as per manufacturers instructions), finished to line and level to approved
texture, including all leads, lifts, scaffolding and curing etc., complete.

Providing and laying of pre-polished 20mm thk. Granite slab for coping in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
10.04 pigment to match the colour of stone, keeping the completed granite covered Sqm 11.87 13.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Option 1

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
10.05 sealant of approved colour, keeping the completed granite covered with Sqm 27.00 29.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Option 2

Page 11 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying of 20mm THK Steel Grey Granite Skirting of 100mm height
in cement mortar 1:4 as detailed above at all the levels with all edges to have
Chamfered & mirror polished as per design with necessary Groove cutting and
detail all complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of approved
10.06 colour, keeping the completed granite covered with Bubble sheet for Rmt 36.00 38.00
protection and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
10.07 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 23.40 25.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


10.08 approved shade and make and as per manufacturer specification, cost including Sqm 23.40 25.00
all materials at site, all labor charges and other necessary charges to complete

11.00 Amphitheatre

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
11.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a Top Slab Cum 4.60 5.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
11.02
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a Top Slab Sqm 15.39 17.00

Providing and constructing 200mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
11.03 Sqm 38.18 41.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
11.04 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 27.95 30.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Page 12 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
11.05 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 0.41 1.00

Providing & Filling with Cinder as approved, whereever as directed by EIC,


including consolidating in 100mm thick layer, etc., as per specification
11.06 Cum 23.55 25.00
complete, The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.

Providing and laying of pre-polished 20mm thk. Granite slab for coping in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
11.07 pigment to match the colour of stone, keeping the completed granite covered Sqm 27.95 30.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
11.08 sealant of approved colour, keeping the completed granite covered with Sqm 14.97 16.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
11.09 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 2.70 3.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Page 13 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Texture Painting: Painting for plastered surface in texture paint finish of


11.10 approved shade and make and as per manufacturer specification, cost including Sqm 2.70 3.00
all materials at site, all labor charges and other necessary charges to complete

12.00 MUGA

Providing and laying M30 Reinforced cement concrete with 53 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
12.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a Raft Cum 6.86 8.00


b Wall Cum 6.86 8.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
12.02
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a Raft Sqm 22.88 25.00


b Wall Sqm 68.64 73.00

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
12.03 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 1.24 2.00

Providing & Filling with Quarry Dust as approved, whereever as directed by EIC,
including watering and consolidating in 100mm thick layer, etc., as per
12.04 specification complete, The rate shall be including all labours,tools & tackels,all Cum 26.78 29.00
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
12.05 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 178.56 188.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Page 14 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying Screed Concrete thick M10 using 20mm down size
aggregates 150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring,
SSM , retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
12.06 Cum 35.71 38.00
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Extra for carrying out Power floater treatment in concrete floors, well
compacted, mechanically vibrated, finished to required levels, floated with neat
cement and power trowelled with broom finish, over a leveling course,
12.07 including MS shuttering, curing etc complete. The rate shall include all labour, Sqm 178.56 188.00
material, tools, equipments, other incidental necessary to complete the work as
per the directions of Engineer in charge

Providing and appying the non metallic surface hardener @ 2.5 to 3 Kg/Sqm as
per manufacture specification of approved make (FOSROC or equivalent).
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
12.08 Sqm 178.56 188.00
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Groove Cutting - Providing and making groove cutting of 8mm on Concrete floor
with minimum 1/3 of the Thickness of concrete - including cost of materials,
12.09 labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc., Rmt 168.60 178.00
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.
Fabrication : Providing, fabricating, handling and erecting Structural steel
members in position as specified in the drawings made out of standard MS
sections conforming to IS 226/2062/800 for Inserts, Trusses, Stairs, Trench
covers etc. Cost to include fabricating necessary Gusset Plates, Stiffener plates,
Brackets, Bolts, Cleats, seating angle, Chequered plates etc., to the required
size, shape, alignment etc., complete as per the drawings. Cost to include
12.10 welding of members using structural steel welding electrodes as per IS MT 6.70 8.00
814/816/817, a coat of anti corrosive primer (non flammable ) to the exposed
surfaces & two coats of approved enamel paint, testing as per IS 7307 (PART1),
necessary equipment, tools and tackles, shuttering, staging, scaffolding required
etc., complete all as per design, details, drawings, specifications etc. with all
lead & lift for all materials & labour and as directed, at all heights & locations.

Providing, Fabrication and fixing of GI Chain Link - Mesh fencing, using 50 x 50 x


3mm chainlink weld mesh fixed on 40 x 40 x 6mm MS Angle, erected between
existing Vertical MS Poles , all as per Drawing - including cost of materials,
wastages, labour, hiring of machinery, tools and tackles, curing, cleaning &
12.11 Sqm 228.80 241.00
house keeping etc. complete, including working at all heights with lead &
lift.etc, including one coat of Zinc rich chromite Primer & two coats of enamel
paint of approved make & colour (as per BDPL Standards), all as per direction
and instructions of Engineer-in-charge.

Providing and laying of pre-polished 20mm thk. Granite slab for coping in
panel @ LEDGE / Sill and other area as specied by Client / Architect., sizes as
indicated in the drawings and as per BDPL Approval, set in cement mortar 1:4
with necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
12.12 pigment to match the colour of stone, keeping the completed granite covered Sqm 17.16 19.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Page 15 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
12.13 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 54.34 58.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


12.14 approved shade and make and as per manufacturer specification, cost including Sqm 54.34 58.00
all materials at site, all labor charges and other necessary charges to complete

13.00 Saucer Drain

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
13.01 Cum 13.05 14.00
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
13.02 Sqm 217.55 229.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Haunching :-Finishing of internal walls with haunching on both the sides using
cement mortar 1:3 with cebex 112, including cost of materials, labour, hiring of
machinery, tools and tackles, joint less finish, including necessary scaffolding,
13.03 Rmt 870.19 914.00
curing, cleaning & house keeping etc. complete, all as per drawing, direction
and instructions of Engineer-in-charge,including working at all heights with lead
& lift.etc, complete.

Providing waterproof plaster 15mm thick for Block, RCC Surface etc. at all levels
in waterproof cement mortar 1:6 (using approved waterproofing compound
13.04 Sqm 174.04 183.00
added as per manufacturers instructions), finished to line and level to approved
texture, including all leads, lifts, scaffolding and curing etc., complete.

Providing and laying of pre-polished 20mm thk. Granite slab of 250mm width
for coping in panel @ LEDGE / Sill and other area as specied by Client /
Architect., sizes as indicated in the drawings and as per BDPL Approval, set in
cement mortar 1:4 with necessary Chamfering and Edge polishing. The rate
quoted shall including making holes for grill fixing, The joints are finished /
13.05 pointing neatly with pigment to match the colour of stone, keeping the Rmt 870.19 914.00
completed granite covered with Plaster of Paris for protection and cleaning of
the same till handing over, including cost of materials, labour, Wastages, HOM,
Tools & Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge. including
working at all heights with lead & lift.etc. complete.

14.00 Steps Connecting to Building

Page 16 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and constructing 300mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
14.01 Cum 10.48 12.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Providing & Filling with Cinder as approved, whereever as directed by EIC,


including consolidating in 100mm thick layer, etc., as per specification
14.02 complete, The rate shall be including all labours,tools & tackels,all leads & Cum 9.95 11.00
lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply, loading and unloading, storing, tranportation, laying, sealing of
14.03 junctions and overlaps etc., complete, including cost of materials, labour, Sqm 33.15 35.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and laying Screed Concrete M10 Grade using 20mm down size
aggregates 150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring,
SSM , retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
14.04 Cum 4.97 6.00
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and laying Pre -Polished 20mm thk Granite stone of BDPL Approved,
for Flooring and Steps (at all levels) fixed over a bed of 20mm thick CM 1:4
inclusive of joints are finished / pointing neatly with pigment to match the
colour of stone, making holes for grill fixing, curing etc., complete at all levels, as
14.05
per drawings. including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.

a Threads with 3no.s Anti skid Grooves, Chamfering & Chamfering and Edge polishi Sqm 27.54 29.00
b Risers - 150mm High Rmt 128.27 135.00
c Landing & Flooring Sqm 64.95 69.00

15.00 Ramp Connecting to Basement


Earth excavation in all types of soil for levelling & lowering the ground including
for foundations upto the required level as per detail, including soft disintegrated
rocks but excluding hard rock, stacking the excavated earth & disposable
material where ever indicated in site, Excluding back filling, But including filling
depressions wherever necessary, watering, consolidating, Transporting surplus
Excavated earth away from the site after backfilling, verticle/slope cut earth
during the excavation process to prevent the sliding by providing suitable
15.01
shoring in slope using wooden planks / MS sheets and poles etc to the soil
surface as per site condition and soil consultant recommendations, bailing out
water, Slush removal etc. complete. Contractor shall get aquented with site
conditions and soil report and submit method statement for dewatering and
getting the surface reasonably dry .( rate shall also include Dewatering & Slush
removal) - The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.
In all types of materials where excavation can be done using Mechanical means

- Excavator, backhoe or JCB / poclain or manual means.


From 0 to 1.5M Cum 300.00 315.00 Tentative

Page 17 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer
Earth filling below Raft, flooring, sides of foundation retaining wall, trenches,
liftpits, External area beyond retaining wall , else where as directed including
15.02 watering and consolidating in 250mm thick layers, etc., as per specification Cum 300.00 315.00 Tentative
complete, The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.
Preparing and formation of road as per drawing to the required slope / gradient
using 8-10 tonne Capacity Vibratory road Roller - spreading in uniform layers
with manually on prepared surface watering, rolling and compacting with
15.03 vibratory power roller at OMC to achieve the desired density. including cost of Sqm 1029.98 1082.00
Labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

MURRAM Sub-Base:
Construction of Granular Sub Base - using approved Quality of Murrum / Gravel
15.04 as per drawing to the required slope by providing close graded Material, Cum 328.88 346.00
carriage of mixed Material to work site, spreading in uniform layers with
manually on prepared surface watering, rolling and compacting with vibratory
power roller at OMC to achieve the desired density. including cost of materials,
labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete. [ 300mm
consolidated thick]
Granular Sub - Base
Providing and laying of Granular Sub Base in two layers, using approved Quality
of GSB as per drawing to the required slope, by providing close graded
Material, carriage of mixed Material to work site, spreading in uniform layers
15.05 with manually on prepared surface watering, rolling and compacting with Cum 328.88 346.00
vibratory power roller at OMC to achieve the desired density.The rate shall be
including all labours,tools & tackels,all leads & lifts,etc.complete as per
directions of incharge. [ 300mm consolidated thick]
Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
15.06 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 1029.98 1082.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.
15.07 REINFORCEMENT STEEL :
Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge
Note : Unless noted otherwise the measurements in accordance with IS 1200.
However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.
Fe 500 MT 6.18 7.00

Page 18 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer
Cement concrete.
Providing and laying M30 Reinforced cement concrete pavement over a
prepared sub base with 53 grade cement, coarse and fine aggregate conforming
to IS 383, maximum size of coarse aggregate not exceeding 25 mm, , mixed in a
batching and mixing plant as per approved mix design, transported to site ,
15.08 including necessary shuttering, curing, finishing to lines and grades as per Cum 206.00 217.00
drawing. including cost of materials, labour, Wastages, HOM, Tools & Tackles,
cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.
Extra for carrying out Power floater treatment in concrete floors, well
compacted, mechanically vibrated, finished to required levels, floated with neat
cement and power trowelled with broom finish, over a leveling course,
15.09 Sqm 1029.98 1082.00
including MS shuttering, curing etc complete. The rate shall include all labour,
material, tools, equipments, other incidental necessary to complete the work as
per the directions of Engineer in charge
Providing and appying the non metallic surface hardener @ 2.5 to 3 Kg/Sqm as
per manufacture specification of approved make (FOSROC or equivalent).
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
15.10 Sqm 1029.98 1082.00
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.
Groove Cutting - Providing and making groove cutting of 8mm on Concrete floor
with minimum 1/3 of the Thickness of concrete - including cost of materials,
15.11 labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc., Rmt 321.38 338.00
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.
Providing and Fixing of 60mm thk Flag Stone shot blasted as per BDPL
Approved for Walkway Infill of approved colour & sizes as indicated on the
drawings, fixing in cement mortar 1:4 with Cebex 112 as detailed above at all
the levels with all edges of the panels as per design and detail all complete.
including cutting, sealing the joints with weather sealant of approved colour,
15.12 Sqm 116.40 123.00
keeping the completed granite covered with Bubble sheet for protection and
cleaning of the same till handing over, including cost of materials, labour,
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.
Providing and Fixing precast Kerbs stones of 600 x 125 x 350 mm including
225 mm wide , 100 mm thick PCC ( 1:3:6) bed.However concrete for behind
kerbstone will be payable under PCC item.i.e., Triangle portion 150 mm width,
100 mm height. etc. the rate includes CM pointing with cebex 112 etc.
complete as detailed in drawing (Note: the kerb is to be exposed in its natural
15.13 color use cement only at the joints (Recessed joints) no cement on kerb surface Rmt 250.96 264.00
- including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., rate qouted to be inclusive of carting away material
generated during the entire process , inclusive of all transportation cost,all
complete all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

16.00 Sky light Finishing Works

Page 19 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying of pre-polished 20mm thk. Granite slab for coping in panel
@ LEDGE / Sill and other area as specied by Client / Architect., sizes as indicated
in the drawings and as per BDPL Approval, set in cement mortar 1:4 with
necessary Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly with
16.01 pigment to match the colour of stone, keeping the completed granite covered Sqm 177.90 187.00
with Plaster of Paris for protection and cleaning of the same till handing over,
including cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Providing and laying of 20mm THK GRANITE Cladding in panel sizes as indicated
on the drawings in cement mortar 1:4 as detailed above at all the levels with all
edges of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins, anchor fasteners,
drilling , cutting, necessary scaffolding etc, sealing the joints with weather
16.02 sealant of approved colour, keeping the completed granite covered with Sqm 186.80 197.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

17.00 Pathway To Security Cabin


Earth excavation in all types of soil for levelling & lowering the ground including
for foundations upto the required level as per detail, including soft disintegrated
rocks but excluding hard rock, stacking the excavated earth & disposable
material where ever indicated in site, Excluding back filling, But including filling
depressions wherever necessary, watering, consolidating, Transporting surplus
Excavated earth away from the site after backfilling, verticle/slope cut earth
during the excavation process to prevent the sliding by providing suitable
17.01
shoring in slope using wooden planks / MS sheets and poles etc to the soil
surface as per site condition and soil consultant recommendations, bailing out
water, Slush removal etc. complete. Contractor shall get aquented with site
conditions and soil report and submit method statement for dewatering and
getting the surface reasonably dry .( rate shall also include Dewatering & Slush
removal) - The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.
In all types of materials where excavation can be done using Mechanical means

- Excavator, backhoe or JCB / poclain or manual means.


From 0 to 1.5M Cum 15.00 16.00 Tentative
Earth filling below Raft, flooring, sides of foundation retaining wall, trenches,
liftpits, External area beyond retaining wall , else where as directed including
17.02 watering and consolidating in 250mm thick layers, etc., as per specification Cum 5.00 6.00 Tentative
complete, The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.
Preparing and formation of road as per drawing to the required slope / gradient
using 8-10 tonne Capacity Vibratory road Roller - spreading in uniform layers
with manually on prepared surface watering, rolling and compacting with
17.03 vibratory power roller at OMC to achieve the desired density. including cost of Sqm 50.00 53.00
Labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Page 20 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

MURRAM Sub-Base:
Construction of Granular Sub Base - using approved Quality of Murrum / Gravel
17.04 as per drawing to the required slope by providing close graded Material, Cum 16.50 18.00
carriage of mixed Material to work site, spreading in uniform layers with
manually on prepared surface watering, rolling and compacting with vibratory
power roller at OMC to achieve the desired density. including cost of materials,
labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete. [ 300mm
consolidated thick]
Granular Sub - Base
Providing and laying of Granular Sub Base in two layers, using approved Quality
of GSB as per drawing to the required slope, by providing close graded
Material, carriage of mixed Material to work site, spreading in uniform layers
17.05 with manually on prepared surface watering, rolling and compacting with Cum 16.50 18.00
vibratory power roller at OMC to achieve the desired density.The rate shall be
including all labours,tools & tackels,all leads & lifts,etc.complete as per
directions of incharge. [ 300mm consolidated thick]
Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
17.06 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 50.00 53.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.
17.07 REINFORCEMENT STEEL :
Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge
Note : Unless noted otherwise the measurements in accordance with IS 1200.
However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.
Fe 500 MT 0.30 1.00
Cement concrete.
Providing and laying M20 Reinforced cement concrete pavement over a
prepared sub base with 53 grade cement, coarse and fine aggregate conforming
to IS 383, maximum size of coarse aggregate not exceeding 25 mm, , mixed in a
batching and mixing plant as per approved mix design, transported to site ,
17.08 including necessary shuttering, curing, finishing to lines and grades as per Cum 10.00 11.00
drawing. including cost of materials, labour, Wastages, HOM, Tools & Tackles,
cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete.

Page 21 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying PCC 100mm thick M10 using 20mm down size aggregates
150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring, SSM ,
retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
17.09 Cum 5.00 6.00
materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
17.10 Sqm 17.38 19.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Providing and Fixing of 20mm thk Flamed Sadarahalli Granite as per BDPL
Approved Granite for Walkway Infill of approved colour & sizes with necessary
grooves as indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with weather
17.11 sealant of approved colour, keeping the completed granite covered with Sqm 35.17 37.00
Bubble sheet for protection and cleaning of the same till handing over, including
cost of materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing,
house keeping etc., complete. all as per specifications, directions & instructions
of Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

18.00 Miscallaneous Works

Supply,Fabrication,erection and installation of SS 304 grade stainless steel


18.01 handrail as per detailed drawings. The rate shall be including all labours,tools & Rmt 43.00 46.00
tackels,all leads & lifts,etc.complete as per directions of Engineer-in-charge.

19.00 Service Related Civil Works

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
19.01 Sqm 66.30 70.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Providing waterproof plaster 15mm thick for Block, RCC Surface etc. at all levels
in waterproof cement mortar 1:6 (using approved waterproofing compound
19.02 Sqm 124.80 132.00
added as per manufacturers instructions), finished to line and level to approved
texture, including all leads, lifts, scaffolding and curing etc., complete.

Providing and Fixing of FRP Cover of Approved Thickness / Size / Pattern / Shade
as per BDPL Spec / drawing, including cost of materials, labour, hiring of
machinery, tools and tackles, joint less finish, including scaffolding, curing,
19.03
cleaning & house keeping etc. complete, all as per drawing, direction and
instructions of Engineer-in-charge,including working at all heights with lead &
lift.etc

a Chamber of Size 600 x 600mm of 2.5T Capacity No.s 26.00 28.00

Page 22 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying Screed Concrete thick M10 using 20mm down size
aggregates 150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring,
SSM , retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
19.04 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Cum 2.81 3.00
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and laying in position the DWC Pipes of approved Dia quality and
make including collars, necessary Excavation, PCC 1:2:4 supports, M.Sand
cushion of 150mm on all sides Refilling, 150mm thk M10 encasing Concrete
allround the pipe, Compaction and making good the level, alignment etc.,
19.05
complete. including cost of materials, labour, Wastages, HOM, Tools & Tackles,
cleaning, house keeping etc., complete. all as per specifications, directions &
instructions of Engineer-in-charge. including working at all heights with lead &
lift.etc. complete

a 200mm Dia Rmt 372.00 391.00


b 150mm Dia Rmt 48.00 51.00

Supplying, fixing, testing & commisioning of PVC pressure pipes (6Kg/sqcm)


confirming to IS 4985 for Drain Pipes, Electrical & Irrigation Crossings, with
solvent cement joints, including all the fittings, laid above false ceiling concealed
19.06
in wall etc, the work shall include wall chase and making good the same in
cement mortar etc.,The quoted rate should include necessary supports like
hanger supports, grip bolts and clamps etc.,

a 110mm Dia Rmt 60.00 63.00


b 100mm Dia Rmt 55.80 59.00

Providing & fixing of FRP Drain with Gratings of 20T Capacity of size (450mm x
450mm x 450mm thk ) as per BDPL specification / BOQ over on drain & finish it
smoothly with CM 1;4 with cebex 112, including cost of materials, labour,
19.07 No.s 6.00 7.00
Wastages, curing, HOM, Tools & Tackles, cleaning, house keeping, welding if
necessary, with necessary precautionary safety measures etc., complete. all as
per specifications, directions & instructions of Engineer-in-charge. ,

20.00 Smoking Zone

Providing and laying M 20 Reinforced cement concrete with 53 grade cement,


coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25mm, , mixed in a batching and mixing plant as per
approved mix design, transported to site , including curing, finishing to lines
20.01 and grades as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working at all heights
with lead & lift.etc. complete. [ Excluding Reinforcement, centering, shuttering,
strutting, propping, scaffolding,staging etc - will be paid seperatly]

a Raft Cum 2.75 3.00


b Wall Cum 3.60 4.00
c Top Slab Cum 2.75 3.00

Formwork – Providing centring, shuttering, strutting, propping, scaffolding,


staging etc., and removal of formwork for vertical surfaces such as wall at any
20.02
thickness, including cost of all materials, labour, equipment, tools & tackles, all
leads and lift etc. all complete as per the specification and directions of EIC.

a Raft Sqm 2.85 3.00


b Wall Sqm 36.04 38.00
c Top Slab Sqm 21.21 23.00

Page 23 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade
of steel as specified below conforming to IS specification including cutting,
bending, hoisting, fabricating and placing in position according to drawings and
20.03 binding the reinforcement with galvanized annealed binding wire of double
fold of 18 gauge and providing PVC cover blocks for placing the reinforcements
in position and for maintaining the cover specified and/or according to relevant
IS. The rate shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of incharge

Note : Unless noted otherwise the measurements in accordance with IS 1200.


However reinforcement shall be measured only in lengths of bars as actually
placed in position on standard weight basis, no allowance being made in the
weight for rolling margin. Authorized laps and splices only will be measured.
Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the
quoted rates. Quoted rate shall be deemed to have considered the above
stipulation. Quoted rate to include lead, lift, placing at all levels and as directed.

Fe 500 MT 0.82 1.00

Providing and constructing 150mm thick Solid concrete block work in walls,
piers and architectural features at all levels using approved Solid blocks of
strength 35kg/sqcm in cement mortar 1:6 including raking of joints,curing, steel
20.04 Sqm 5.18 6.00
scaffolding, staging, leads and lifts. Cost to include all leads and lifts and as
directed by Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between the blocks

Providing & Filling with Quarry Dust as approved, whereever as directed by EIC,
including watering and consolidating in 100mm thick layer, etc., as per
20.05 Cum 2.29 3.00
specification complete, The rate shall be including all labours,tools & tackels,all
leads & lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 500 Micron over
compacted GSB, below Grade slab, P.C.C, Raft slab etc., to the required levels,
including supply,loading and unloading, storing, tranportation, laying, sealing of
20.06 junctions and overlaps etc.,complete, including cost of materials, labour, Sqm 18.36 20.00
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

Providing and laying Screed Concrete thick M10 using 20mm down size
aggregates 150 mm or 100 mm or 75 mm or 40mm thick below raft, flooring,
SSM , retaining wall , UG sump, STP, Grade slab etc., including base preparation,
compaction, shuttering if necessary, curing etc. complete. including cost of
20.07 materials, labour, Wastages, HOM, Tools & Tackles, cleaning, curing, house Cum 1.84 2.00
keeping etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead & lift.etc.
complete.

Providing and laying Antiskid floor tiles in different sizes (thickness to be


specified by the manufacturer) of approved make in all colours and shades, laid
on 20mm thick cement mortar 1:4 (1 Cement : 4 river sand/M'sand mixed with
cebex 112) including grouting the joints with epoxy tile grout of approved make
as per detailed Architectural drawings and as directed by Architect. (Base rate
of Ceramic Tile Rs. /sft. and Vitrified Tile Rs. /- Sqft inclusive of duties and
20.08 Sqm 16.50 18.00
taxes)
Rate shall includes PVC, corner beedings, spacers of 2 - 3mm, necessary slopes,
proper finishing around the floor trap etc.
Rate shall include final cleaning of the cladding work before hading over shall
be in scope of the cladding contractor. The contractor shall submit drawings for
Architects/EIC approval before proceeding with installation works.

Page 24 of 82
Bagmane Neon External Development Works

Bagmane
BOQ - External Development Works

Qty with
S.No Description Unit Qty Remarks
Buffer

Providing and laying of 20mm THK Steel Grey Granite Skirting in cement mortar
1:4 as detailed above at all the levels with all edges to have Chamfered &
mirror polished as per design with necessary Groove cutting and detail all
complete. including clamp, pins, anchor fasteners, drilling , cutting, necessary
scaffolding etc, sealing the joints with weather sealant of approved colour,
20.09 keeping the completed granite covered with Bubble sheet for protection and
cleaning of the same till handing over, including cost of materials, labour,
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc. complete.

a 100 mm High Rmt 6.80 8.00


b 150mm High Rmt 12.20 13.00
c 100mm Band without chamfering & Edge Polishing Rmt 19.00 20.00

Providing waterproof sand faced plaster to external walls, columns, beams ,


pergola beams and any projections,plaster bands as per drawing etc. in
waterproof cement mortar 1:4 (using approved waterproofing compound of
approve equivalent added as per manufacturers instructions) applied in two
coats, first coat of 12mm thick, second coat of 8mm with water proof
compound to be applied for both coats, finished to line and level to approved
20.10 sand faced texture, including all leads, lifts, scaffolding and curing complete. The Sqm 43.65 46.00
rate is inclusive of forming of drip moulds as with all lead and lift and as directed
by Engineer in charge including providing and fixing in position galvanised
expanded metal mesh 20 gauge (ARPITHA make) at junctions of concrete and
masonry and other locations as called for including fixing with GI nails.fixing
approved column / wall corner beads, making groove , plaster band and
cornices as called for etc., complete.

Texture Painting: Painting for plastered surface in texture paint finish of


20.11 approved shade and make and as per manufacturer specification, cost including Sqm 43.65 46.00
all materials at site, all labor charges and other necessary charges to complete

Providing plastering to ceilings / soffits , in cement mortar 1:4, 12mm thick,


finishing to line and level without lime rendering finished smooth, at all levels &
20.12 Sqm 18.36 20.00
lifts, including lead and lift of materials, applying to concrete surface,
scaffolding, curing, etc., complete. etc. ceiling

Providing and painting two coats of Acrylic Smooth exterior emulsion paint of
approved shade and make including preparation of base, a coat of exterior
cement primer after two coats of putty up to a minimum thickness of 2mm over
20.13 plastered surface to prepare the surface even and smooth with necessary Sqm 18.36 20.00
scaffolding, etc all complete as per detailed Architectural drawings and as
directed by Architect.
As per Approved BDPL revised BOQ specs.

EPOXY COATING: Supply and applying of a Bostik Moisture seal waterproof


epoxy coating, which shall be applied to the concrete minimum thickness of 0.5
mm, for services rooms application after cleaning the surface of lumps, potting
etc., and clearing the surface of loose particles by using a vacuum assisted shot
blasting machine or scarifying. The cleaned/prepared surface shall be provided
with 2 coats of priming coat. The prepared sub-strata shall be applied with
approved epoxy coating. Application of coating shall only be carried out by an
approved specialist applicator. Quoted price shall include making good of any
potholes or undulation. Make shall be of fosroc or approved equivalent make.

Page 25 of 82
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks

1.00 Aggregate Filling on Podium


Total Area Sqm 16176.00
Pline in Drawing Takeoff 1
Building Area Sqm 7888.35
Filling Area Sqm 8287.65

2.00 Pathway around Building

PCC Cum 1.1 798.96 0.10 87.89 Pline in Drawing Takeoff 1

Block Work 166.95 Pline in Drawing Takeoff 2-


Taken Around Grass Cell

North east Sqm 1 39.68 0.20 7.94


North West Sqm 1 145.64 0.20 29.13
East Sqm 1 172.26 0.20 34.45
South
Sqm 1 55.61 0.20 11.12
Sqm 1 53.61 0.20 10.72
Sqm 1 55.28 0.20 11.06
Sqm 1 50.15 0.20 10.03
Sqm 1 63.96 0.20 12.79
Sqm 1 33.01 0.20 6.60
West
Sqm 1 26.88 0.20 5.38
Sqm 1 52.85 0.20 10.57
Sqm 1 52.05 0.20 10.41
Sqm 1 33.79 0.20 6.76

Below Paving Area


Geo Fabric Sheet Sqm 1.1 834.77 0.60 550.95
considered in item 1

Slab RL-100, FFL - 100.35,


Granite - 70mm, PCC
Dust Filling Cum 1 798.96 0.03 23.97 -100mm, Aggregate -
50mm- RCC 100mm

Granite - Sadharahalli Sqm 1 720.97 720.97 Pline in Drawing Takeoff 1

Granite - Steel Grey


200mm Band Rmt 1 174.00 174.00
500mm Band Rmt 1 86.38 86.38

3.00 Pathway near Seating Plaza

PCC Cum 1.1 503.11 0.10 55.34 Pline in Drawing Takeoff 1

Block Work Sqm 85.35 Pline in Drawing Takeoff 2

Seating Plaza 1 Sqm 1 76.46 0.20 15.29


Seating Plaza 2 Sqm 1 71.29 0.20 14.26
Seating Plaza 3 Sqm 1 96.18 0.20 19.24
Seating Plaza 3 (inside) Sqm 1 32.00 0.20 6.40
Seating Plaza 4 Sqm 1 66.78 0.20 13.36
Seating Plaza 5 Sqm 1 60.03 0.20 12.01
Seating Plaza 5 (Inside) Sqm 1 24.00 0.20 4.80

Geo Fabric Sheet Sqm 1 426.74 0.60 256.04


Slab RL-100, FFL - 100.3,
Granite - 70mm, PCC
Dust Filling Cum 1 503.11 0.01 5.03
-100mm, Aggregate -
50mm- RCC 100mm
Granite Sadharahalli Sqm 1 475.01 475.01
Granite Steel Grey
200mm Band Rmt 1 138.00 138.00
500mm Band Rmt 1 1.00

4.00 Pathway near MUGA & Security

PCC Cum 1.1 233.04 0.10 25.63 Pline in Drawing Takeoff 1

Block Work 47.40

Page 26 of 82
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks

Around MUGA Sqm 1 147.00 0.20 29.40 Pline in Drawing Takeoff 1

Around Amphitheatre Sqm 1 90.00 0.20 18.00 Pline in Drawing Takeoff 1

Geofabric Sheet Sqm 1 237.00 0.60 142.20


Slab RL-100, FFL - 100.3,
Granite - 70mm, PCC
Dust Filling Cum 1 233.04 0.01 2.33
-100mm, Aggregate -
50mm- RCC 100mm

Granite Sadharahalli Sqm 1 212.22 212.22 Pline in Drawing Takeoff 1

Granite Steel Grey


200mm Band Rmt 1 104.10 104.10

5.00 Rear Lift Lobby

PCC Cum 1.1 167.29 0.10 18.40 Pline in Drawing Takeoff 1

Geofabric Sheet Sqm 1 167.29 167.29


Slab RL-100.35, FFL - 100.9,
Granite - 70mm, PCC
Cinder filling Cum 1 167.29 0.31 51.86 -100mm, Aggregate - 50mm,
PCC 100mm

Granite Sadharahalli Sqm 1 130.87 130.87 Pline in Drawing Takeoff 1

Granite Steel Grey


500mm Band Rmt 1 72.84 72.84

6.00 Driveway
Sand Filling 284.83

North east Cum 1 287.04 0.12 35.88


North West Cum 1 504.24 0.12 63.03
East Cum 1 470.63 0.12 58.83
South 0.12
Cum 1 127.58 0.12 15.95
Cum 1 119.44 0.12 14.93
Slab RL-100, FFL - 100.3,
Cum 1 127.66 0.12 15.96 25mm Top Cover
Cum 1 109.40 0.12 13.67 Grass Cell - 50mm,
Cum 1 161.89 0.12 20.24 Sand 50 mm
Aggregate - 50mm
Cum 1 58.60 0.12 7.32
West 0.12
Cum 1 45.12 0.12 5.64
Cum 1 119.86 0.12 14.98
Cum 1 115.03 0.12 14.38
Cum 1 32.18 0.12 4.02

7.00 PlanterAround Building Pline in Drawing Takeoff 1

Raft Cum 1 435.76 0.60 0.15 39.22


RC Wall Cum 1 435.76 0.15 0.70 45.75
Reinforcement MT 1 7.65 Considered 90Kgs/Cum
Formwork 740.79
Raft Sqm 2 435.76 0.15 130.73
RC Wall Sqm 2 435.76 0.70 610.06
Coping - 250mm Wide Rmt 1 435.76 435.76
Cladding 263.11
Cladding - Inner side - 100mm Sqm 1 430.28 0.10 43.03
Cladding Outer Side side - 100mm Sqm 1 440.16 0.50 220.08

Option 2
Skirting Rmt 1 440.16 440.16
Plastering Sqm 1 430.28 0.10 43.03
Sqm 1 440.16 0.40 176.06
219.09

8.00 Planter cum Seaters - 1600 x 1600


Bottom Slab Cum 15 1.60 1.60 0.15 5.76
RC Wall Cum 15 5.80 0.15 0.60 7.83
Formwork - Bottom Slab Sqm 15 6.40 0.15 14.40

Page 27 of 82
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


Formwork - RC Wall Sqm 30 5.80 0.60 104.40
Reinforcement MT 15 1.22
Block Work - 150mm Sqm 30 3.20 0.60 57.60
Plastering Sqm 30 3.20 0.60 57.60
Coping Sqm 15 2.85 0.35 14.96
Sqm 15 2.50 0.15 5.63
20.59
Cladding Sqm 15 6.40 0.75 72.00

Option 2
Skirting Rmt 15 6.40 96.00
Plastering Sqm 15 6.40 0.65 62.40

9.00 Planter cum Seaters - 3600 x 1600


Bottom Slab Cum 7 3.60 1.60 0.15 6.05
RC Wall Cum 7 10.10 0.15 0.60 6.36
Formwork - Bottom Slab Sqm 7 10.40 0.15 10.92
Formwork - RC Wall Sqm 14 10.40 0.60 87.36
Reinforcement MT 7 1.12
Block Work - 150mm Sqm 14 3.60 0.60 30.24
Plastering Sqm 14 3.60 0.60 30.24
Coping Sqm 7 3.60 0.35 8.82
Sqm 7 10.10 0.15 10.61
19.43
Cladding Sqm 7 14.40 0.75 75.60

Option 2
Skirting Rmt 7 14.40 100.80
Plastering Sqm 7 14.40 0.65 65.52
10.00 Planter cum Seaters - 3000 x 3000
Bottom Slab Cum 3 3.00 3.00 0.15 4.05
RC Wall Cum 3 11.70 0.15 0.60 3.16
Formwork - Bottom Slab Sqm 3 12.00 0.15 5.40
Formwork - RC Wall Sqm 6 12.00 0.60 43.20
Reinforcement MT 3 0.65
Block Work - 150mm Sqm 6 12.00 0.60 43.20
Plastering Sqm 6 12.00 0.60 43.20
Coping Sqm 3 11.30 0.35 11.87
Cladding Sqm 3 12.00 0.75 27.00

Option 2
Skirting Rmt 3 12.00 36.00
Plastering Sqm 3 12.00 0.65 23.40
11.00 Amphitheatre
Bottom Slab Cum 1 30.67 0.15 4.60
Block Walls
1st Step Wall Cum 1 11.61 0.36 4.18
2nd Step Wall Cum 1 12.47 0.66 8.23
3rd Step Wall Cum 1 13.34 0.81 10.80
4th Step Wall - Backside Cum 1 13.86 0.81 11.22
Edge Walls - Planter Edge Cum 2 0.75 0.66 0.99
Cum 2 1.20 0.81 1.94
Planter Inside Walls Cum 2 0.75 0.30 0.45
Planter Inside Walls Cum 2 1.20 0.15 0.36
38.18
Top Slab
1st Step Cum 1 11.28 0.15 1.69
2nd Step Cum 1 9.68 0.15 1.45
3rd Step Cum 1 6.12 0.15 0.92
Below Planter Cum 2 1.20 1.50 0.15 0.54
4.60
Form work
Bottom Slab Cum 1 35.36 0.15 5.30
RC Walls
1st Step Wall Cum 2 11.61 0.36 8.36
2nd Step Wall Cum 2 12.47 0.66 16.46
3rd Step Wall Cum 2 13.34 0.81 21.61
4th Step Wall - Backside Cum 2 13.86 0.81 22.45
Edge Walls - Planter Edge Cum 4 0.75 0.66 1.98

Page 28 of 82
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


Cum 4 1.20 0.81 3.89
Planter Inside Walls Cum 4 0.75 0.30 0.90
Planter Inside Walls Cum 4 1.20 0.15 0.72
76.36
Top Slab
1st Step Cum 1 25.57 0.15 3.84
2nd Step Cum 1 27.31 0.15 4.10
3rd Step Cum 1 28.09 0.15 4.21
Below Planter Cum 4 1.20 1.50 0.15 3.24
15.39
Light Weight Filling
Cum 1 15.70 1.50 23.55
Coping
1st Step Sqm 1 9.03 9.03
2nd Step Sqm 1 9.68 9.68
3rd Step Sqm 1 6.12 6.12
Planter on 1st Step Sqm 2 3.00 0.20 1.20
Planter on 2nd Step Sqm 2 4.80 0.20 1.92
27.95
Cladding
1st Step Wall Sqm 1 11.61 0.30 3.48
2nd Step Wall Sqm 1 12.47 0.30 3.74
3rd Step Wall Sqm 1 13.34 0.15 2.00
4th Step Wall - Backside Sqm 1 13.86 0.20 2.77
Planter Internal
1st Planter Sqm 2 0.75 0.30 0.45
2nd Planter Sqm 2 1.20 0.15 0.36
Planter Front Side
1st Planter Sqm 2 1.50 0.60 1.80
2nd Planter Sqm 2 1.20 0.15 0.36
14.97
Texture Painting
Edges - Planter External
1st Planter Sqm 2 0.75 0.60 0.90
2nd Planter Sqm 2 1.20 0.75 1.80
2.70
12.00 MUGA
Raft Cum 1 57.20 0.60 0.20 6.86
Retaining Wall Cum 1 57.20 0.20 0.60 6.86
Form work - Raft Sqm 2 57.20 0.20 22.88
Form work - Retaining Wall Sqm 2 57.20 0.60 68.64
Light Weight Filling Cum 1 178.56 0.15 26.78
Polythene Sheet Sqm 1 178.56 178.56
Screed Cum 1 178.56 0.20 35.71
Broom Finish Sqm 1 178.56 178.56
Hardnerer Sqm 1 178.56 178.56
Groove Cutting Rmt 7 18.60 130.20
4 9.60 38.40
168.60
MS Structure - 100 x 100 SHS 5mm tk
Verticals Rmt 24 4.85 116.40
Rmt 34 4.85 164.90
Horizontal Rmt 3 57.20 171.60
452.90
MS Structure in MT MT 1 452.90 14.80 6.70
Chainlink Mesh Sqm 1 57.20 4.00 228.80
Coping - 300mm Rmt 1 57.20 57.20
Cladding - internal Sqm 1 57.20 0.50 28.60
Cladding - External Sqm 1 57.20 0.45 25.74
54.34

13.00 Saucer Drain


Block Work Sqm 1 870.19 0.25 217.55
Haunching Rmt 1 870.19 870.19
Plastering Rmt 1 870.19 0.20 174.04
Coping - 250mm Rmt 1 870.19 870.19

14.00 Step Connecting to Building


Threads

Page 29 of 82
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


Starting from Northeast Corner
Connection to S lift lobby Sqm 2 1.20 0.30 0.72
Connection to Staircase Sqm 2 4.20 0.30 2.52
Connection to Staircase Sqm 2 1.50 0.30 0.90
Connection to Staircase Sqm 4 1.80 0.30 2.16
Rear Lobby Sqm 3 11.84 0.30 10.66
Connection to Staircase Sqm 4 1.70 0.30 2.04
Connection to Pump Room Sqm 2 7.29 0.30 4.37
Connection to Staircase Sqm 2 1.50 0.30 0.90
Connection to Staircase Sqm 2 4.20 0.30 2.52
Connection to S lift lobby Sqm 2 1.25 0.30 0.75
27.54
Risers
Starting from Northeast Corner
Connection to S lift lobby Rmt 3 1.20 3.60
Connection to Staircase Rmt 3 4.20 12.60
Connection to Staircase Rmt 3 1.50 4.50
Connection to Staircase Rmt 5 1.80 9.00
Rear Lobby Rmt 4 11.84 47.36
Connection to Staircase Rmt 5 1.70 8.50
Connection to Pump Room Rmt 3 7.29 21.86
Connection to Staircase Rmt 3 1.50 4.50
Connection to Staircase Rmt 3 4.20 12.60
Connection to S lift lobby Rmt 3 1.25 3.75
128.27
Landing
Starting from Northeast Corner
Connection to S lift lobby Sqm 1 1.50 1.20 1.80
Sqm 1 2.40 5.30 12.72
Sqm 1 1.20 0.90 1.08
Connection to Staircase Sqm 1 4.20 0.90 3.78
Connection to Staircase Sqm 1 1.50 0.90 1.35
Connection to Pump Room Sqm 1 7.29 2.90 21.09
Connection to Staircase Sqm 1 1.50 0.90 1.35
Connection to Staircase Sqm 1 4.20 0.90 3.78
Connection to S lift lobby Sqm 1 1.25 1.50 1.88
Sqm 1 1.25 0.90 1.13
Sqm 1 6.00 2.50 15.00
64.95
Block Work - 300mm
Starting from Northeast Corner
Connection to S lift lobby Cum 1 1.20 0.15 0.30 0.05
Cum 1 1.20 0.30 0.30 0.11
Cum 1 1.20 0.45 0.30 0.16
Connection to Staircase Cum 1 4.20 0.15 0.30 0.19
Cum 1 4.20 0.30 0.30 0.38
Cum 1 4.20 0.45 0.30 0.57
Connection to Staircase Cum 1 1.50 0.15 0.30 0.07
Cum 1 1.50 0.30 0.30 0.14
Cum 1 1.50 0.45 0.30 0.20
Connection to Staircase Cum 1 1.80 0.15 0.30 0.08
Cum 1 1.80 0.30 0.30 0.16
Cum 1 1.80 0.45 0.30 0.24
Cum 1 1.80 0.60 0.30 0.32
Rear Lobby Cum 1 11.84 0.15 0.30 0.53
Cum 1 11.84 0.30 0.30 1.07
Cum 1 11.84 0.45 0.30 1.60
Connection to Staircase Cum 1 1.70 0.15 0.30 0.08
Cum 1 1.70 0.30 0.30 0.15
Cum 1 1.70 0.45 0.30 0.23
Cum 1 1.70 0.60 0.30 0.31
Connection to Pump Room Cum 1 7.29 0.15 0.30 0.33
Cum 1 7.29 0.30 0.30 0.66
Cum 1 7.29 0.45 0.30 0.98
Connection to Staircase Cum 1 1.50 0.15 0.30 0.07
Cum 1 1.50 0.30 0.30 0.14
Cum 1 1.50 0.45 0.30 0.20
Connection to Staircase Cum 1 4.20 0.15 0.30 0.19
Cum 1 4.20 0.30 0.30 0.38

Page 30 of 82
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


Cum 1 4.20 0.45 0.30 0.57
Connection to S lift lobby Cum 1 1.25 0.15 0.30 0.06
Cum 1 1.25 0.30 0.30 0.11
Cum 1 1.25 0.45 0.30 0.17
10.48
Dust Filling
Starting from Northeast Corner Cum
Connection to S lift lobby Cum 0.5 1.20 1.50 0.30 0.27
Connection to Staircase Cum 1 4.20 0.90 0.30 1.13
Connection to Staircase Cum 1 1.50 0.90 0.30 0.41
Connection to Staircase Cum 0 0.00
Rear Lobby Cum 0 0.00
Connection to Staircase Cum 0 0.00
Connection to Pump Room Cum 1 7.29 2.90 0.30 6.33
Connection to Staircase Cum 1 1.50 0.90 0.30 0.41
Connection to Staircase Cum 1 4.20 0.90 0.30 1.13
Connection to S lift lobby Cum 0.5 1.20 1.50 0.30 0.27
9.95
HDPE Sheet
Starting from Northeast Corner Sqm
Connection to S lift lobby Sqm 0.5 1.20 1.50 0.90
Connection to Staircase Sqm 1 4.20 0.90 3.78
Connection to Staircase Sqm 1 1.50 0.90 1.35
Connection to Staircase Sqm 0 0.00
Rear Lobby Sqm 0 0.00
Connection to Staircase Sqm 0 0.00
Connection to Pump Room Sqm 1 7.29 2.90 21.09
Connection to Staircase Sqm 1 1.50 0.90 1.35
Connection to Staircase Sqm 1 4.20 0.90 3.78
Connection to S lift lobby Sqm 0.5 1.20 1.50 0.90
33.15
Screed Concrete
Starting from Northeast Corner Cum
Connection to S lift lobby Cum 0.5 1.20 1.50 0.15 0.14
Connection to Staircase Cum 1 4.20 0.90 0.15 0.57
Connection to Staircase Cum 1 1.50 0.90 0.15 0.20
Connection to Staircase Cum 0 0.00
Rear Lobby Cum 0 0.00
Connection to Staircase Cum 0 0.00
Connection to Pump Room Cum 1 7.29 2.90 0.15 3.16
Connection to Staircase Cum 1 1.50 0.90 0.15 0.20
Connection to Staircase Cum 1 4.20 0.90 0.15 0.57
Connection to S lift lobby Cum 0.5 1.20 1.50 0.15 0.14
4.97
15.00 Ramp Connecting to Basement
Murram Cum 1.1 936.34 0.30 328.88
GSB Cum 1.1 936.34 0.30 328.88
RCC Cum 1.1 936.34 0.20 206.00
Broom Finish Cum 1.1 936.34 1029.98
Hardnerer Cum 1.1 936.34 1029.98
Groove Cutting
Center Rmt 1 127.38 127.38
At Transistions Rmt 6 7.50 45.00
16 8.00 128.00
6 3.50 21.00
321.38
60mm tk Flag Stone Sqm 6 7.50 0.60 27.00
16 8.00 0.60 76.80
6 3.50 0.60 12.60
116.40
Kerb Rmt 1 250.96 250.96

16.00 Cutout Finishing Works


Coping
Near Seating Area - 250mm Wide Rmt 3 17.20 51.60
Rmt 6 19.60 117.60
Rmt 1 8.70 8.70
177.90
Cladding Sqm 3 17.20 1.05 54.18

Page 31 of 82
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


Sqm 6 19.60 1.05 123.48
Sqm 1 8.70 1.05 9.13
186.80

19.00 Service Related Civil Works


Block Work for Catch Basins
Around Building Sqm 52 0.60 0.85 26.52
Sqm 52 0.90 0.85 39.78
66.30
Plastering
Inside Sqm 26 2.40 0.65 40.56
Outside Sqm 26 3.60 0.90 84.24
124.80
FRP Cover - 600 x 600 No.s 26 26.00
Levelling Screed Cum 26 0.60 0.60 0.30 2.81
200 Dia DWC Pipes
Through Catch Basins around Building Rmt 1 308.00 308.00
From FRP CB to Main Rmt 1 64.00 64.00
372.00
150 Dia DWC Pipes Rmt 4 12.00 48.00
100 Dia PVC 6 kg Pipe - Drain Crossings
Rmt 1 13.20 13.20
Rmt 1 7.00 7.00
Rmt 1 7.00 7.00
Rmt 1 1.00 1.00
Rmt 1 7.00 7.00
Rmt 1 1.00 1.00
Rmt 1 2.00 2.00
Rmt 1 2.50 2.50
Rmt 1 7.50 7.50
Rmt 1 2.50 2.50
Rmt 1 5.10 5.10
55.80
110 Dia PVC for Electrical and irrigation line
Crossings
Starting from south east corner Rmt 2 1.00 2.00
2 1.50 3.00
2 1.00 2.00
2 1.50 3.00
2 1.00 2.00
2 6.50 13.00
2 1.00 2.00
2 1.50 3.00
2 1.00 2.00
4 2.50 10.00
2 1.50 3.00
2 1.50 3.00
2 1.50 3.00
2 1.50 3.00
2 1.50 3.00
2 1.50 3.00
60.00

FRP Catch Basins - 450mm x 450mm No.s 6 6.00

20.00 Smoking Zone


RCC
Bottom Slab Cum 1 18.36 0.15 2.75
Wall Cum 1 6.80 0.20 2.65 3.60
Top Slab Cum 1 18.36 0.15 2.75
9.11
Formwork
Bottom Slab Cum 1 19.00 0.15 2.85
Wall Cum 2 6.80 2.65 36.04
Top Slab Cum 1 18.36 18.36
1 19.00 0.15 2.85
60.10
150mm Block Work Sqm 1 12.20 0.42 5.18
Quarry Dust Cum 1 18.36 0.12 2.29

Page 32 of 82
Bagmane Neon M.Sheet - Ext Development Works

S.No Description Unit No.s L B D Qty Remarks


HDPE Sheet Sqm 1 18.36 18.36
Screed Cum 1 18.36 0.10 1.84
Plastering Sqm 2 6.80 3.00 40.80
Sqm 1 19.00 0.15 2.85
43.65
Ceiling Plastering Sqm 1 18.36 18.36
Tile Flooring TL 01/01 Sqm 1 16.50 16.50
100 Wide Band - Steel grey Rmt 1 19.00 19.00
100mm Skirting Steel Grey Rmt 1 6.80 6.80
150mm Steel Grey Band Rmt 1 12.20 12.20

Page 33 of 82
Bagmane Luxor Capitol
BOQ - External Development Works
Saleable area 1,023,916 Sft

Pushpagiri R0 Pushpagiri R1 HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1

Sl. No. DESCRIPTION AMOUNT IN Rs. AMOUNT IN Rs. AMOUNT IN Rs. AMOUNT IN Rs. AMOUNT IN Rs. AMOUNT IN Rs.
A Drive way around Building 10,962,814 9,789,420 8,491,636 8,789,633 13,004,769 11,833,670
B Pathway around Building 4,086,475 3,914,244 3,710,891 4,223,603 5,287,905 5,188,813
C Lawn Area 2,264,866 1,712,427 1,749,665 1,907,177 2,275,115 2,113,683
D Flag Stone 1,047,266 1,004,645 1,178,745 2,076,970 2,171,974 1,253,409
E Middle plaza 376,657 332,951 356,712 313,353 839,296 834,883
F Planter Cum Seaters 7,170,908 6,323,003 7,546,666 6,655,892 13,179,399 13,059,833
G Waterbody and Cascade wall 1,746,504 1,725,180 1,853,686 2,054,332 3,146,099 2,979,986
H Pedestrian Ramp and arrival Plaza 2,090,412 2,050,263 3,896,957 4,410,693 5,992,108 5,985,315
I Pergola 139,246 139,246 81,590 531,152 542,793 540,922
J Light Pole 401,186 401,186 486,245 1,416,972 1,601,037 1,597,238
K Miscallaneous Works 6,723,717 6,668,010 5,597,821 6,224,276 6,950,533 6,950,533
TOTAL OF BUILDING 37,010,051 34,060,575 34,950,615 38,604,053 54,991,028 52,338,287
GST 6,661,809 6,130,903 6,291,111 6,948,729 9,898,385 9,420,892
TOTAL INCL OF GST 43,671,860 40,191,478 41,241,726 45,552,782 64,889,413 61,759,178
COST PER SFT 42.7 39.3 40.3 44.5 63.4 60.3
POSITION L-1 L-2 L-3 H-1
Existing rates of
Satya Sundar Pushpagiri in
Neon existing. Kyoto/other
Bagmane proj.

AMOUNT IN Rs. AMOUNT IN Rs.


11,359,472 9,767,271
3,815,057 3,912,806
2,113,683 1,712,427
1,195,061 985,618
383,302 359,573
6,865,596 6,501,586
2,860,758 1,833,239
2,238,000 2,050,263
142,447 139,246
533,985 505,273
6,150,059 6,150,059
37,657,421 33,917,361
6,778,336 6,105,125
44,435,756 40,022,486
43.4 39.1
Bagmane Luxor Page 36 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate
1.00 Drive way around Building

Providing and laying M30 Reinforced cement concrete with 53


grade cement, coarse and fine aggregate conforming to IS 383,
maximum size of coarse aggregate not exceeding 25mm, , mixed in
a batching and mixing plant as per approved mix design,
transported to site , including curing, finishing to lines and grades
1.01 as per drawing. incl materials, labour, Wastages, HOM, Tools & Cum 738 6,000 4,429,895 Cum 738 6,000 4,429,895 Cum 738 5970.00 4,407,746 5,545 4,093,925 7,200 5,315,874 6,000 4,429,895 7,200
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.
[ Excluding Reinforcement, centering, shuttering, strutting,
propping, scaffolding,staging etc - will be paid seperatly]

Providing and filling Quarry dust as per BDPL Approval,


whereever as directed etc., as per specification complete, The rate
1.02 Cum 1200 2,275 2,729,036 Cum 1200 1,450 1,739,386 Cum 1,200 1560.00 1,871,339 1,250 1,499,758 1,800 2,159,238 1,800 2,159,238 1,800
shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 300


Micron over compacted GSB, below Grade slab, P.C.C, Raft slab
etc., to the required levels, including supply,loading and unloading,
storing, tranportation, laying, sealing of junctions and overlaps
1.03 etc.,complete, including cost of materials, labour, Wastages, HOM, Sqm 7383 98 723,550 Sqm 7383 98 723,550 Sqm 7,383 48.00 354,392 114 842,714 81 598,036 75 553,737 75
Tools & Tackles, cleaning, curing, house keeping etc., complete. all
as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc.
complete.

Extra for carrying out Power floater treatment in concrete floors,


well compacted, mechanically vibrated, finished to required levels,
floated with neat cement and power trowelled with broom finish,
1.04 over a leveling course, including MS shuttering, curing etc Sqm 4396 75 329,734 Sqm 4396 75 329,734 Sqm 4,396 75.00 329,734 75 329,734 140 615,503 129.50 569,341 129.5
complete. The rate shall include all labour, material, tools,
equipments, other incidental necessary to complete the work as per
the directions of Engineer in charge
Groove Cutting - Providing and making groove cutting of 8mm on
Concrete floor with minimum 1/3 of the Thickness of concrete -
including cost of materials, labour, Wastages, HOM, Tools &
1.05 Rmt 4476 150 671,344 Rmt 4476 150 671,344 Rmt 4,476 55.00 246,160 55 246,160 140 626,588 129.50 579,594 129.50
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.

Fabricating & fixing in position reinforcement for RCC work with


high yield strength ribbed cold twisted tor steel (HSD) bar of various
diameters and grade of steel as specified below conforming to IS
specification including cutting, bending, hoisting, fabricating and
placing in position according to drawings and binding the
1.06 reinforcement with galvanized annealed binding wire of double fold
of 18 gauge and providing PVC cover blocks for placing the
reinforcements in position and for maintaining the cover specified
and/or according to relevant IS. The rate shall be including all
labours,tools & tackels,all leads & lifts,etc.complete as per
directions of incharge

Note : Unless noted otherwise the measurements in accordance


with IS 1200. However reinforcement shall be measured only in
lengths of bars as actually placed in position on standard weight
basis, no allowance being made in the weight for rolling margin.
Authorized laps and splices only will be measured. Chairs of any
shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be
included in the quoted rates. Quoted rate shall be deemed to have
considered the above stipulation. Quoted rate to include lead, lift,
placing at all levels and as directed.

Fe 500 MT 30 16,500 487,288 MT 30 16,500 487,288 MT 30 11500.00 339,625 11,354 335,302 23,000 679,251 18,000 531,587 16,650

Page 36 of 82
Bagmane Luxor Page 37 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

Providing and Fixing of 40mm thk Pre Polished Steel Grey as per
BDPL of approved colour & sizes with necessary Grooves as
indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels
to have mirror polished as per design and detail all complete.
including cutting, sealing the joints with weather sealant of
1.06
approved colour, keeping the completed granite covered with
Bubble sheet for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.

a 200mm Band Rmt 916.9 957 877,455 Sqm 183.4 3,783 693,712 Rmt 916.9 750.00 687,661 650 595,973 1,800 1,650,386 1,800 1,650,386 1,800

b 400mm Band Sqm 189 3,783 714,510 Sqm 189 3,783 714,510 Sqm 189 1350.00 254,980 4,480 846,069 7,200 1,359,893 7,200 1,359,893 7,200

Total for Drive way around Building 10,962,814 9,789,420 8,491,636 8,789,633 13,004,769 11,833,670

2.00 Pathway around Building

Providing and laying M30 Reinforced cement concrete with 53


grade cement, coarse and fine aggregate conforming to IS 383,
maximum size of coarse aggregate not exceeding 25mm, , mixed in
a batching and mixing plant as per approved mix design,
transported to site , including curing, finishing to lines and grades
2.01 as per drawing. incl materials, labour, Wastages, HOM, Tools & Cum 48 6,000 287,671 Cum 48 6,000 287,671 Cum 48 5970.00 286,232 5,545 265,853 7,200 345,205 7,200 345,205 6,000
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.
[ Excluding Reinforcement, centering, shuttering, strutting,
propping, scaffolding,staging etc - will be paid seperatly]

Providing and filling Quarry dust as per BDPL Approval,


whereever as directed etc., as per specification complete, The rate
2.02 Cum 73 2,275 166,741 Cum 73 1,450 106,275 Cum 73 1560.00 114,337 1,250 91,634 1,800 131,927 1,800 131,927 1,800
shall be including all labours,tools & tackels,all leads &
lifts,etc.complete as per directions of Engineer-in-charge.

Providing and Laying of Providing and laying HDPE sheet of 300


Micron over compacted GSB, below Grade slab, P.C.C, Raft slab
etc., to the required levels, including supply,loading and unloading,
storing, tranportation, laying, sealing of junctions and overlaps
2.03 etc.,complete, including cost of materials, labour, Wastages, HOM, Sqm 479 98 46,986 Sqm 479 98 46,986 Sqm 479 48.00 23,014 114 54,725 81 38,836 75 35,959 75
Tools & Tackles, cleaning, curing, house keeping etc., complete. all
as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc.
complete.

Fabricating & fixing in position reinforcement for RCC work with


high yield strength ribbed cold twisted tor steel (HSD) bar of various
diameters and grade of steel as specified below conforming to IS
specification including cutting, bending, hoisting, fabricating and
placing in position according to drawings and binding the
2.04 reinforcement with galvanized annealed binding wire of double fold
of 18 gauge and providing PVC cover blocks for placing the
reinforcements in position and for maintaining the cover specified
and/or according to relevant IS. The rate shall be including all
labours,tools & tackels,all leads & lifts,etc.complete as per
directions of incharge

Note : Unless noted otherwise the measurements in accordance


with IS 1200. However reinforcement shall be measured only in
lengths of bars as actually placed in position on standard weight
basis, no allowance being made in the weight for rolling margin.
Authorized laps and splices only will be measured. Chairs of any
shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be
included in the quoted rates. Quoted rate shall be deemed to have
considered the above stipulation. Quoted rate to include lead, lift,
placing at all levels and as directed.

Fe 500 MT 2 16,500 31,644 MT 2 16,500 31,644 MT 2 11500.00 22,055 11,354 21,774 23,000 44,109 18,000 34,520 16,650

Page 37 of 82
Bagmane Luxor Page 38 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

Providing and constructing 150mm thick Solid concrete block


work in walls, piers and architectural features at all levels using
approved Solid blocks of strength 35kg/sqcm in cement mortar 1:6
including raking of joints,curing, steel scaffolding, staging, leads
2.05 Sqm 220 980 215,145 Sqm 220 980 215,145 Sqm 220 1015.00 222,829 937 205,795 1,160 254,662 962 211,194 962
and lifts. Cost to include all leads and lifts and as directed by
Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between
the blocks

Providing waterproofing Plastering , in cement mortar 1:4, 12mm


thick, finishing to line and level without lime rendering finished
2.06 smooth, at all levels & lifts, including lead and lift of materials, Sqm 512 550 281,738 Sqm 512 450 230,513 Sqm 512 395.00 202,339 329 168,468 630 322,718 582.75 298,514 583
applying to concrete surface, scaffolding, curing, etc., complete.
etc. ceiling

Providing and laying Screed Concrete M10 Grade using 20mm


down size aggregates 150 mm or 100 mm or 75 mm or 40mm
thick on seater area etc., including base preparation, compaction,
shuttering if necessary, curing etc. complete. including cost of
2.06 Cum 47 4,500 210,605 Cum 47 4,500 210,605 Cum 47 4250.00 198,905 4,725 221,113 5,400 252,726 4,995 233,772 4,995
materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working
at all heights with lead & lift.etc. complete.

Providing and Fixing of 30mm thk Riverwash Steelgray Granite


as per BDPL Approved Granite for Walkway Infill of approved
colour & sizes with necessary grooves as indicated on the
drawings, fixing in cement mortar 1:4 with Cebex 112 as detailed
above at all the levels with all edges of the panels as per design
and detail all complete. including cutting, sealing the joints with
2.07 weather sealant of approved colour, keeping the completed granite Sqm 626 3,783 2,367,878 Sqm 626 3,783 2,367,878 Sqm 626 3500.00 2,190,741 4,480 2,803,861 4,500 2,816,667 4,500 2,816,667 3,783
covered with Bubble sheet for protection and cleaning of the same
till handing over, including cost of materials, labour, Wastages,
HOM, Tools & Tackles, cleaning, curing, house keeping etc.,
complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

Providing and Fixing of 20mm thk Riverwash Steel Grey as per


BDPL of approved colour & sizes with necessary Grooves as
indicated on the drawings, fixing in cement mortar 1:4 with Cebex
112 as detailed above at all the levels with all edges of the panels
to have mirror polished as per design and detail all complete.
including cutting, sealing the joints with weather sealant of
2.08
approved colour, keeping the completed granite covered with
Bubble sheet for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.

a 200mm Band Rmt 601 796 478,067 Sqm 120 3,476 417,528 Rmt 601 750.00 450,440 650 390,381 1,800 1,081,055 1,800 1,081,055 1,800

Total for Pathway around Building 4,086,475 3,914,244 3,710,891 4,223,603 5,287,905 5,188,813

3.00 Lawn Area


Providing & Filling with aggregates of 20mm & below down
graded aggregates, whereever as directed by EIC, including
watering and consolidating in 50mm thick layer, etc., as per
3.01 Cum 199 1,932 384,398 Cum 199 1,700 338,239 Cum 199 1560.00 310,384 2,271 451,879 1,620 322,322 1,544.75 307,350 1,544.75
specification complete, The rate shall be including all labours,tools
& tackels,all leads & lifts,etc.complete as per directions of
Engineer-in-charge.

Providing & Filling with Cinder as approved, whereever as directed


by EIC, including consolidating in 100mm thick layer, etc., as per
3.02 specification complete, The rate shall be including all labours,tools Cum 362 5,200 1,880,468 Cum 362 3,800 1,374,188 Cum 362 3980.00 1,439,281 4,024 1,455,298 5,400 1,952,793 4,995 1,806,334 4,995
& tackels,all leads & lifts,etc.complete as per directions of
Engineer-in-charge.
Total for Lawn Area 2,264,866 1,712,427 1,749,665 1,907,177 2,275,115 2,113,683

4.00 Flag Stone

Page 38 of 82
Bagmane Luxor Page 39 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

Providing and laying RCC 150mm thick M20 using 20mm down
size aggregates 150 mm or 100 mm or 75 mm or 40mm thick
below raft, flooring, SSM , retaining wall , UG sump, STP, Grade
slab etc., including base preparation, compaction, shuttering if
4.01 necessary, curing etc. complete. including cost of materials, labour, Cum 57 5,600 319,660 Cum 57 5,600 319,660 Cum 57 5650.00 322,514 5,186 296,008 6,850 391,012 6,850 391,012 5,828
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping
etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.
Providing and Fixing of 60mm thk Flag Stone shot blasted as
per BDPL Approved for Walkway Infill of approved colour &
sizes as indicated on the drawings, fixing in cement mortar 1:4 with
Cebex 112 as detailed above at all the levels with all edges of the
panels as per design and detail all complete. including cutting,
sealing the joints with weather sealant of approved colour, keeping
4.02 Sqm 381 1,912 727,606 Sqm 381 1,800 684,985 Sqm 381 2250.00 856,231 4,680 1,780,961 4,680 1,780,961 2,266 862,396 2,266
the completed granite covered with Bubble sheet for protection
and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working
at all heights with lead & lift.etc. complete.
Total for Flag Stone 1,047,266 1,004,645 1,178,745 2,076,970 2,171,974 1,253,409

5.00 Middle plaza

Extra for carrying out Power floater treatment in concrete floors,


well compacted, mechanically vibrated, finished to required levels,
floated with neat cement and power trowelled with broom finish,
5.01 over a leveling course, including MS shuttering, curing etc Sqm 420 75 31,521 Sqm 420 75 31,521 Sqm 420 75.00 31,521 75 31,521 140 58,840 129.50 54,427 130
complete. The rate shall include all labour, material, tools,
equipments, other incidental necessary to complete the work as per
the directions of Engineer in charge

Providing and Fixing of 20mm thk Polished Steel Grey Granite


as per BDPL of approved colour & sizes with necessary Grooves
as indicated on the drawings, fixing in cement mortar 1:4 with
Cebex 112 as detailed above at all the levels with all edges of the
panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant
5.02
of approved colour, keeping the completed granite covered with
Bubble sheet for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.

a 200mm Band Rmt 434 796 345,135 Sqm 87 3,476 301,430 Rmt 434 750.00 325,190 650 281,832 1,800 780,457 1,800 780,457 3,793
Total for Middle plaza 376,657 332,951 356,712 313,353 839,296 834,883

6.00 Planter Cum Seaters


Providing and constructing 150mm thick Solid concrete block
work in walls, piers and architectural features at all levels using
approved Solid blocks of strength 35kg/sqcm in cement mortar 1:6
including raking of joints,curing, steel scaffolding, staging, leads
6.01 Sqm 104 980 101,922 Sqm 104 980 101,922 Sqm 104 1,015 105,563 937 97,493 1,160 120,643 962 100,050 962
and lifts. Cost to include all leads and lifts and as directed by
Architect/Engineer in charge.
Note : The Base course should be done with 50mm gap between
the blocks

Providing waterproof plastering to Seater wall , in cement mortar


1:4, 12mm thick, finishing to line and level without lime rendering
6.02 finished smooth, at all levels & lifts, including lead and lift of Sqm 104 450 46,801 Sqm 104 450 46,801 Sqm 104 395 41,081 329 34,204 630 65,522 582.75 60,607 583
materials, applying to concrete surface, scaffolding, curing, etc.,
complete. etc. ceiling

Page 39 of 82
Bagmane Luxor Page 40 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

Providing and laying of 30mm thk. Riverwash Steel gray Granite


slab for coping in panel @ LEDGE / Sill and other area as
specied by Client / Architect., sizes as indicated in the drawings
and as per BDPL Approval, set in cement mortar 1:4 with
necessary Chamfering and Edge polishing. The rate quoted
shall including making holes for grill fixing, The joints are finished /
6.03 pointing neatly with pigment to match the colour of stone, keeping
the completed granite covered with Plaster of Paris for protection
and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working
at all heights with lead & lift.etc. complete.

Coping Less than 300mm Rmt 1939 1,335 2,588,591 Sqm 582 3,476 2,022,009 Rmt 1939 1,050 2,035,970 650 1,260,363 1,800 3,490,235 1,800 3,490,235 1,800

Coping Sqm 180 3,783 681,022 Sqm 180 3,783 681,022 Sqm 180 3,500 630,076 4,480 806,414 7,200 1,296,156 7,200 1,296,156 7,200

Providing and laying of 20mm THK GRANITE Cladding in panel


sizes as indicated on the drawings in cement mortar 1:4 as detailed
above at all the levels with all edges of the panels to have mirror
polished as per design with necessary Groove cutting and detail all
complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of
6.04
approved colour, keeping the completed granite covered with
Bubble sheet for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.

Cladding Less than 300mm Rmt 677 1,143 773,977 Sqm 203 3,476 706,127 Rmt 677 1,250 846,431 650 440,144 2,300 1,557,434 2,300 1,557,434 2,300

Cladding Sqm 360 3,476 1,250,339 Sqm 360 3,476 1,250,339 Sqm 360 5,400 1,942,413 5,600 2,014,355 8,100 2,913,620 8,100 2,913,620 8,100

Providing and laying of 20mm THK Riverwash Steel Grey Granite


Skirting of 100mm height in cement mortar 1:4 as detailed above
at all the levels with all edges to have Chamfered & mirror polished
as per design with necessary Groove cutting and detail all
complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of
6.05 Rmt 2126 448 952,553 sqm 213 3,476 739,079 Rmt 2126 550 1,169,429 650 1,382,052 1,350 2,870,416 1,350 2,870,416 1,350
approved colour, keeping the completed granite covered with
Bubble sheet for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.

Plaster Painting:Exterior Emulsion


Providing and applying for External surfaces with 1 coat of exterior
grade primer and 2 coats of Exterior Emulsion Paint with
necessary surface preparation etc., complete, with necessary
6.06 scaffolding, Curing, etc., complete as per manufacturers Sqm 1793 180 322,813 Sqm 1793 180 322,813 Sqm 1,793 180 322,813 130 233,143 230 412,484 200 358,682 200
specification and as per the instructions of the Engineer in charge
at site. External Works Location :- Balconies,Refuge terrace / open
terrace

Texture Painting: Painting for plastered surface in texture paint


finish of approved shade and make and as per manufacturer
6.07 Sqm 1006 450 452,890 Sqm 1006 450 452,890 Sqm 1,006 450 452,890 385 387,724 450 452,890 410 412,633 333
specification, cost including all materials at site, all labor charges
and other necessary charges to complete
Total for Planter Cum Seaters 7,170,908 6,323,003 7,546,666 6,655,892 13,179,399 13,059,833

7.00 Waterbody and Cascade wall

Page 40 of 82
Bagmane Luxor Page 41 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

Providing and laying of 20mm thk. POlished Steel gray Granite


slab for coping in panel @ LEDGE / Sill and other area as
specied by Client / Architect., sizes as indicated in the drawings
and as per BDPL Approval, set in cement mortar 1:4 with
necessary Chamfering and Edge polishing. The rate quoted
shall including making holes for grill fixing, The joints are finished /
7.01 pointing neatly with pigment to match the colour of stone, keeping
the completed granite covered with Plaster of Paris for protection
and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working
at all heights with lead & lift.etc. complete.

Coping (200mm) Rmt 48 1,143 54,787 sqm 10 3,476 33,323 Rmt 48 750.00 35,949 650 31,156 1,800 86,279 1,800 86,279 1,800

Providing and laying of 30mm thk. Riverwash Steel gray Granite


slab for coping in panel @ LEDGE / Sill and other area as
specied by Client / Architect., sizes as indicated in the drawings
and as per BDPL Approval, set in cement mortar 1:4 with
necessary Chamfering and Edge polishing. The rate quoted
shall including making holes for grill fixing, The joints are finished /
7.02 pointing neatly with pigment to match the colour of stone, keeping
the completed granite covered with Plaster of Paris for protection
and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working
at all heights with lead & lift.etc. complete.

Coping 200 mm Rmt 8 957 7,737 Rmt 8 3,476 28,103 Rmt 8 750.00 6,064 650 5,255 1,800 14,553 1,800 14,553 1,800

Providing and laying of 20mm thk. Polished Steel gray Granite


slab for Base in panel @ LEDGE / Sill and other area as specied
by Client / Architect., sizes as indicated in the drawings and as per
BDPL Approval, set in cement mortar 1:4 with necessary
Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly
7.03 with pigment to match the colour of stone, keeping the completed
granite covered with Plaster of Paris for protection and cleaning of
the same till handing over, including cost of materials, labour,
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping
etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead &
lift.etc. complete. (Location:cascade steps and waterbody base)

Base Sqm 2 3,476 6,947 Sqm 2 3,476 6,947 Sqm 2 3500.00 6,995 4,480 8,953 5,400 10,793 5,400 10,793 3,793

Providing and laying of 6mm thk. Bizzasa Tile for Base in panel
@ LEDGE / Sill and other area as specied by Client / Architect.,
sizes as indicated in the drawings and as per BDPL Approval, set
in cement mortar 1:4 with necessary Chamfering and Edge
polishing. The rate quoted shall including making holes for grill
fixing, The joints are finished / pointing neatly with pigment to match
7.04
the colour of stone, keeping the completed granite covered with
Plaster of Paris for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.

Base Sqm 98 1,592 156,221 Sqm 98 1,550 152,100 Sqm 98 1993.00 195,571 6,300 618,211 6,300 618,211 6,300 618,211 6,300

Page 41 of 82
Bagmane Luxor Page 42 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

Providing and laying of 40mm THK STEEL GRAY SARRATED


GRANITE Cladding in panel sizes as indicated on the drawings in
cement mortar 1:4 as detailed above at all the levels with all edges
of the panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins,
anchor fasteners, drilling , cutting, necessary scaffolding etc,
7.05 sealing the joints with weather sealant of approved colour, keeping
the completed granite covered with Bubble sheet for protection
and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working
at all heights with lead & lift.etc. complete.

Cladding Sqm 99 3,783 372,730 Sqm 99 3,783 372,730 Sqm 99 5400.00 532,049 5,600 551,755 8,100 798,073 8,100 798,073 8,100

Providing and laying of Cladding inside the waterbody in panel


sizes as indicated on the drawings in cement mortar 1:4 as detailed
above at all the levels with all edges of the panels to have mirror
polished as per design with necessary Groove cutting and detail all
complete. including clamp, pins, anchor fasteners, drilling , cutting,
necessary scaffolding etc, sealing the joints with weather sealant of
7.06
approved colour, keeping the completed granite covered with
Bubble sheet for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.

Cladding Inside 6mm Thick Bizzasa Tile (upto water Level) Sqm 50 1,820 91,872 Sqm 50 1,550 78,242 Sqm 50 1993.00 100,605 6,300 318,017 6,300 318,017 6,300 318,017 6,300

Cladding Outside 20mm thick Riverwash steel Gray Granite


Sqm 12 3,476 39,994 Sqm 12 3,476 39,994 Sqm 12 3500.00 40,270 4,480 51,541 8,100 93,197 8,100 93,197 8,100
( Above water Level)

Providing and Fixing of 20mm thk Polished Steel Grey Granite


as per BDPL of approved colour & sizes with necessary Grooves
as indicated on the drawings, fixing in cement mortar 1:4 with
Cebex 112 as detailed above at all the levels with all edges of the
panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant
7.07
of approved colour, keeping the completed granite covered with
Bubble sheet for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.

a 200mm Band Rmt 25 796 19,541 sqm 5 3,476 17,066 Rmt 25 750.00 18,412 650 15,957 1,800 44,188 1,800 44,188 1,800
Fabrication : Providing, fabricating, handling and erecting
Structural steel members in position as specified in the drawings
made out of standard MS sections conforming to IS 226/2062/800
for Inserts, Trusses, Stairs, Trench covers etc. Cost to include
fabricating necessary Gusset Plates, Stiffener plates, Brackets,
Bolts, Cleats, seating angle, Chequered plates etc., to the required
size, shape, alignment etc., complete as per the drawings. Cost to
include welding of members using structural steel welding
7.08 MT 8 120,000 996,674 MT 8 120,000 996,674 MT 8 110500 917,771 54,600 453,487 140,000 1,162,787 120,000 996,674 120,000
electrodes as per IS 814/816/817, a coat of anti corrosive primer
(non flammable ) to the exposed surfaces & two coats of
approved enamel paint, testing as per IS 7307 (PART1),
necessary equipment, tools and tackles, shuttering, staging,
scaffolding required etc., complete all as per design, details,
drawings, specifications etc. with all lead & lift for all materials &
labour and as directed, at all heights & locations.

Total for Waterbody and Cascade wall 1,746,504 1,725,180 1,853,686 2,054,332 3,146,099 2,979,986

8.00 Pedestrian Ramp and arrival Plaza

Page 42 of 82
Bagmane Luxor Page 43 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

Providing and laying 20mm thk sira Gray Leather Finish of


BDPL Approved, for Flooring and Steps (at all levels) fixed over
a bed of 20mm thick CM 1:4 inclusive of joints are finished /
pointing neatly with pigment to match the colour of stone, making
holes for grill fixing, curing etc., complete at all levels, as per
8.01
drawings. including cost of materials, labour, Wastages, HOM,
Tools & Tackles, cleaning, curing, house keeping etc., complete. all
as per specifications, directions & instructions of Engineer-in-
charge. including working at all heights with lead & lift.etc.
complete.
Treads with 3no.s Anti skid Grooves, Chamfering & Chamfering
a Sqm 145 3,476 504,390 Sqm 145 3,476 504,390 Sqm 145 3600.00 522,383 6,500 943,191 8,100 1,175,361 8,100 1,175,361 3,793
and Edge polishing
b Risers - 150mm Rmt 319 622 198,186 Sqm 48 3,476 166,133 Rmt 319 1250.00 398,285 650 207,108 1,800 573,530 1,800 573,530 3,793

c Landing & Flooring Sqm 232 3,476 805,025 Sqm 232 3,476 805,025 Sqm 232 3600.00 833,743 4,480 1,037,441 8,100 1,875,922 8,100 1,875,922 3,793

Providing and laying of 20mm thk. Polished Steel gray Granite


slab for Base in panel @ LEDGE / Sill and other area as specied
by Client / Architect., sizes as indicated in the drawings and as per
BDPL Approval, set in cement mortar 1:4 with necessary
Chamfering and Edge polishing. The rate quoted shall including
making holes for grill fixing, The joints are finished / pointing neatly
8.02 with pigment to match the colour of stone, keeping the completed
granite covered with Plaster of Paris for protection and cleaning of
the same till handing over, including cost of materials, labour,
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping
etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead &
lift.etc. complete. (Location:cascade steps )

Treads with 3no.s Anti skid Grooves, Chamfering & Chamfering


Sqm 14 3,476 49,272 Sqm 14 3,476 49,272 Sqm 14 3600.00 51,030 6,500 92,138 8,100 114,818 8,100 114,818 3,793
and Edge polishing
Risers - 150mm sqm 63 622 39,186 sqm 9 3,476 32,848 sqm 63 1250.00 78,750 650 40,950 1,800 113,400 1,800 113,400 3,793

Providing and laying of 30mm thk. Riverwash Steel gray Granite


slab for coping in panel @ LEDGE / Sill and other area as
specied by Client / Architect., sizes as indicated in the drawings
and as per BDPL Approval, set in cement mortar 1:4 with
necessary Chamfering and Edge polishing. The rate quoted
shall including making holes for grill fixing, The joints are finished /
8.03 pointing neatly with pigment to match the colour of stone, keeping
the completed granite covered with Plaster of Paris for protection
and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working
at all heights with lead & lift.etc. complete.

Coping Sqm 9 3,783 33,406 Sqm 9 3,783 33,406 Sqm 9 3400.00 30,024 4,480 39,557 7,200 63,580 7,200 63,580 7,200

Texture Painting: Painting for plastered surface in texture paint


finish of approved shade and make and as per manufacturer
8.04 Sqm 58 450 26,127 Sqm 58 450 26,127 Sqm 58 450.00 26,127 385 22,368 450 26,127 333 19,334 333
specification, cost including all materials at site, all labor charges
and other necessary charges to complete

Providing and Fixing of 20mm thk Polished Steel Grey Granite


as per BDPL of approved colour & sizes with necessary Grooves
as indicated on the drawings, fixing in cement mortar 1:4 with
Cebex 112 as detailed above at all the levels with all edges of the
panels to have mirror polished as per design and detail all
complete. including cutting, sealing the joints with weather sealant
8.05
of approved colour, keeping the completed granite covered with
Bubble sheet for protection and cleaning of the same till handing
over, including cost of materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.

a 200mm Band Rmt 17 796 13,874 Sqm 3 3,476 12,117 Rmt 17 750.00 13,073 650 11,330 1,800 31,374 1,800 31,374 3,793

Page 43 of 82
Bagmane Luxor Page 44 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

Providing and Fixing of 20mm thk sira Gray Leather Finish as


per BDPL for walkway Infill including cutting, sealing the joints
with weather sealant of approved colour, keeping the completed
granite covered with Bubble sheet for protection and cleaning of
8.06 the same till handing over, including cost of materials, labour, Sqm 68 3,476 235,273 Sqm 68 3,476 235,273 Sqm 68 3400.00 230,129 4,480 303,198 4,500 304,583 4,500 304,583 3,793
Wastages, HOM, Tools & Tackles, cleaning, curing, house keeping
etc., complete. all as per specifications, directions & instructions of
Engineer-in-charge. including working at all heights with lead &
lift.etc. complete.

9.00 Aco Drain


Supply and installation of drain made of Polymer Concrete Channel
body DIN EN 1433 with boltless drainlock®, V-profile, zero water
absorption, excellent surface smoothness with integrated edge
protection in cast iron/galvanised steel/stainless steel, with ACO
DRAIN safety groove (SF), tongue and groove joints, with built-in
slopes; With integrated lip labyrinth sealing for liquid-tight
9.01 connection to ground line, with lateral pre-shapes for corner-, T- Rmt 623 298 185,672 Rmt 623 298 185,672 Rmt 623 2750.00 1,713,414 2,750 1,713,414 2,750 1,713,414 2,750 1,713,414 298
and cross
connections, universal front wall, with edge protection; internal
width 150mm depth as per design.
For external driveway

Total for Pedestrian Ramp and arrival Plaza 2,090,412 2,050,263 3,896,957 4,410,693 5,992,108 5,985,315

10.00 Pergola

Providing and laying M 20 Reinforced cement concrete with 53


grade cement, coarse and fine aggregate conforming to IS 383,
maximum size of coarse aggregate not exceeding 25mm, , mixed in
a batching and mixing plant as per approved mix design,
transported to site , including curing, finishing to lines and grades
10.01 as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.
[ Excluding Reinforcement, centering, shuttering, strutting,
propping, scaffolding,staging etc - will be paid seperatly]

a Footing Cum 2 5,600 13,971 Cum 2 5,600 13,971 Cum 2 5650.00 14,096 5,186 12,937 6,850 17,089 6,850 17,089 5,828

Formwork – Providing centring, shuttering, strutting, propping,


scaffolding, staging etc., and removal of formwork for vertical
10.02 surfaces such as wall at any thickness, including cost of all
materials, labour, equipment, tools & tackles, all leads and lift etc.
all complete as per the specification and directions of EIC.

a Footing Sqm 17 475 7,900 Sqm 17 475 7,900 Sqm 17 540.00 8,981 442 7,348 630 10,478 630 10,478 630

Fabricating & fixing in position reinforcement for RCC work with


high yield strength ribbed cold twisted tor steel (HSD) bar of various
diameters and grade of steel as specified below conforming to IS
specification including cutting, bending, hoisting, fabricating and
placing in position according to drawings and binding the
10.03 reinforcement with galvanized annealed binding wire of double fold
of 18 gauge and providing PVC cover blocks for placing the
reinforcements in position and for maintaining the cover specified
and/or according to relevant IS. The rate shall be including all
labours,tools & tackels,all leads & lifts,etc.complete as per
directions of incharge

Note : Unless noted otherwise the measurements in accordance


with IS 1200. However reinforcement shall be measured only in
lengths of bars as actually placed in position on standard weight
basis, no allowance being made in the weight for rolling margin.
Authorized laps and splices only will be measured. Chairs of any
shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be
included in the quoted rates. Quoted rate shall be deemed to have
considered the above stipulation. Quoted rate to include lead, lift,
placing at all levels and as directed.

Fe 500 MT 0.37 16,500 6,175 MT 0.37 16,500 6,175 MT 0.37 11500.00 4,304 11,354 4,249 23,000 8,607 18,000 6,736 16,650
10.04 Chemical Anchoring- 16mm Dia Nos 139 800 111,200 Nos 139 800 111,200 Nos 139 390 54,210 3,645 506,619 3,645 506,619 3,645 506,619 800
Total for Pedestrian Ramp and arrival Plaza 139,246 139,246 81,590 531,152 542,793 540,922

Page 44 of 82
Bagmane Luxor Page 45 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

11.00 Light Pole

Providing and laying M 20 Reinforced cement concrete with 53


grade cement, coarse and fine aggregate conforming to IS 383,
maximum size of coarse aggregate not exceeding 25mm, , mixed in
a batching and mixing plant as per approved mix design,
transported to site , including curing, finishing to lines and grades
11.01 as per drawing. incl materials, labour, Wastages, HOM, Tools &
Tackles, cleaning, curing, house keeping etc., complete. all as per
specifications, directions & instructions of Engineer-in-charge.
including working at all heights with lead & lift.etc. complete.
[ Excluding Reinforcement, centering, shuttering, strutting,
propping, scaffolding,staging etc - will be paid seperatly]

a Footing Cum 5 - Cum 5 - - Cum 5 5650.00 28,618 5,186 26,266 6,850 34,697 6,850 34,697 5,828

Formwork – Providing centring, shuttering, strutting, propping,


scaffolding, staging etc., and removal of formwork for vertical
11.02 surfaces such as wall at any thickness, including cost of all
materials, labour, equipment, tools & tackles, all leads and lift etc.
all complete as per the specification and directions of EIC.

a Footing Sqm 51 - Sqm 51 - - Sqm 51 540.00 27,352 442 22,377 630 31,911 630 31,911 630

Fabricating & fixing in position reinforcement for RCC work with


high yield strength ribbed cold twisted tor steel (HSD) bar of various
diameters and grade of steel as specified below conforming to IS
specification including cutting, bending, hoisting, fabricating and
placing in position according to drawings and binding the
11.03 reinforcement with galvanized annealed binding wire of double fold
of 18 gauge and providing PVC cover blocks for placing the
reinforcements in position and for maintaining the cover specified
and/or according to relevant IS. The rate shall be including all
labours,tools & tackels,all leads & lifts,etc.complete as per
directions of incharge

Note : Unless noted otherwise the measurements in accordance


with IS 1200. However reinforcement shall be measured only in
lengths of bars as actually placed in position on standard weight
basis, no allowance being made in the weight for rolling margin.
Authorized laps and splices only will be measured. Chairs of any
shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be
included in the quoted rates. Quoted rate shall be deemed to have
considered the above stipulation. Quoted rate to include lead, lift,
placing at all levels and as directed.

Fe 500 MT 1 - MT 1 - - MT 1 11500.00 8,737 11,354 8,626 23,000 17,475 18,000 13,676 16,650

Providing and laying of 20mm thk. POlished Steel gray Granite


slab for coping in panel @ LEDGE / Sill and other area as
specied by Client / Architect., sizes as indicated in the drawings
and as per BDPL Approval, set in cement mortar 1:4 with
necessary Chamfering and Edge polishing. The rate quoted
shall including making holes for grill fixing, The joints are finished /
11.04 pointing neatly with pigment to match the colour of stone, keeping
the completed granite covered with Plaster of Paris for protection
and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working
at all heights with lead & lift.etc. complete.

Coping Sqm 11 - Sqm 11 - - Sqm 11 3400.00 38,270 4,480 50,422 7,200 81,043 7,200 81,043 3,793

Page 45 of 82
Bagmane Luxor Page 46 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

Providing and laying of 20mm thk. POlished Steel gray Granite


Cladding in panel sizes as indicated on the drawings in cement
mortar 1:4 as detailed above at all the levels with all edges of the
panels to have mirror polished as per design with necessary
Groove cutting and detail all complete. including clamp, pins,
anchor fasteners, drilling , cutting, necessary scaffolding etc,
11.05 sealing the joints with weather sealant of approved colour, keeping
the completed granite covered with Bubble sheet for protection
and cleaning of the same till handing over, including cost of
materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working
at all heights with lead & lift.etc. complete.

Cladding Sqm 51 3,476 176,066 Sqm 51 3,476 176,066 Sqm 51 5400.00 273,521 5,600 283,651 8,100 410,281 8,100 410,281 3,793
11.06 Chemical Anchoring- 16mm Dia Nos 281 800 225,120 Nos 281 800 225,120 Nos 281 390 109,746 3,645 1,025,630 3,645 1,025,630 3,645 1,025,630 800
Total for Light Pole 401,186 401,186 486,245 1,416,972 1,601,037 1,597,238

12.00 Miscallaneous Works

Supply,Fabrication,erection and installation of SS 304 grade


stainless steel handrail as per detailed drawings. The rate shall
12.01 Rmt 40 4,800 193,838 Rmt 40 4,700 189,800 Rmt 40 2880.00 116,303 4,800 193,838 4,800 193,838 4,800 193,838 4,700
be including all labours,tools & tackels,all leads & lifts,etc.complete
as per directions of Engineer-in-charge.

Supply,Fabrication,erection and installation of SS 304 grade


stainless steel handrail as per detailed drawings. The rate shall
12.02 Sqmt 18 9,000 164,614 Sqmt 18 9,000 164,614 Sqmt 18 2880.00 52,677 9,000 164,614 9,000 164,614 9,000 164,614 8,000
be including all labours,tools & tackels,all leads & lifts,etc.complete
as per directions of Engineer-in-charge.

SS wire work: Supply & fixing of 4mmØ - 316 grade Stainless steel
12.03 flexible type wire as per dwg & spec, cost including all materials to Rmt 4660 386 1,798,788 Rmt 4660 386 1,798,788 Rmt 4,660 390.00 1,817,428 390 1,817,428 390 1,817,428 390 1,817,428 385
site, all labour charges and other necessary charges to complete

SS Brackets: Supplying and fixing of 316 grade Stainless steel


brackets as per landscape Arcts spec & detail, cost including all
12.04 Nos 3507 475 1,665,825 Nos 3507 475 1,665,825 Nos 3,507 280.00 981,960 475 1,665,825 475 1,665,825 475 1,665,825 475
materials at site, all labour charges and other necessary charges to
complete

Supplying, fabricating, delivering at site, hoisting and fixing in


position and making all structural steel work in accordance with the
design drawings prepared by the consultants. The structural steel
work shall include welded and built up sections, trusses, built-up
12.05 work shall include welded and built up sections, trusses, built-up MT 5 120,000 609,783 MT 5 120,000 609,783 MT 5 110500 561,508 54,600 277,452 140,000 711,413 140,000 711,413 120,000
purlins, frame work welded and/or bolted, girders, gusset plates,
base plates, cleats etc., as per drawings. The rate shall include two
coat of Zinc ridge epoxy primer and shall include bolts, washers,
1:3 cement and grouting for bolts etc.complete.

EPOXY COATING: Supply and applying of a Bostik Moisture seal


waterproof epoxy coating, which shall be applied to the concrete
minimum thickness of 0.5 mm, for services rooms application after
cleaning the surface of lumps, potting etc., and clearing the surface
of loose particles by using a vacuum assisted shot blasting
machine or scarifying. The cleaned/prepared surface shall be
12.06 Sqmt 1148 225 258,348 Sqmt 1148 180 206,679 Sqmt 1,148 450.00 516,696 450 516,696 450 516,696 450 516,696 180
provided with 2 coats of priming coat. The prepared sub-strata shall
be applied with approved epoxy coating. Application of coating
shall only be carried out by an approved specialist applicator.
Quoted price shall include making good of any potholes or
undulation. Make shall be of fosroc or approved equivalent make.
Consider -0.3kg/Sqmt

Providing and laying Screed Concrete M20 Grade using 20mm


down size aggregates 150 mm or 100 mm or 75 mm or 40mm
thick on podium etc., including base preparation, compaction,
shuttering if necessary, curing etc. complete. including cost of
12.07 Cum 275 5,600 1,537,521 Cum 275 5,600 1,537,521 Cum 275 5650.00 1,551,249 5,785 1,588,421 6,850 1,880,718 6,850 1,880,718 5,600
materials, labour, Wastages, HOM, Tools & Tackles, cleaning,
curing, house keeping etc., complete. all as per specifications,
directions & instructions of Engineer-in-charge. including working
at all heights with lead & lift.etc. complete.

ADDITIONAL ITEMS
1 Edge Polish
1.1 20mm granite 120 120

1.2 30mm granite 240 240

Page 46 of 82
Bagmane Luxor Page 47 External Development Qty For Luxor 22-08-2019

Bagmane Luxor Capitol


BOQ - External Development Works rmt sqm

Colliers Colliers Satya Sundar existing in


S.No Description Unit Pushpagiri R0 Unit Pushpagiri R1 Unit Colliers Qty HPA R0 NCCCL R0 Satya Sundar R0 Satya Sundar R1
Qty Qty Neon

1.3 40mm granite 240 240


2 Chamfering
2.1 20mm 120 120

2.2 30mm granite 240 140

2.3 40mm 240 140


3 Grooves
3.1 20mm 130 130

3.2 30mm granite 160 160

3.3 40mm 160 160


4 Half round nosing
4.1 20mm 150 150

4.2 30mm 300 300

4.3 40mm 300 300


5 Full nosing
5.1 20mm 300 300

5.2 30mm 600 600

5.3 40mm 600 600


6 Inlays below 300mm width
6.1 20mm 100 100

6.2 30mm 200 200

6.3 40mm 200 200

7 Cebex 112 on Litre basis -coverage 5ml per sft is considered 77 39


Epoxy coat Approved makes MAPEI/ ARDEX ENDURA /
8 220 180
LATICRETE/ BOSTIK/ RAMCO
9 Hydrated Lime 335 335
Providing & construction of pole foundation of size
450x450x450mm using RCC M25 concrete including necssary
11.041 Nos 66 7,500 495,000 7,500 495,000 - - - - - - - -
reinforcement , shuttering, curing etc complete (Considered instead
of 11.01,11.02,11.03,11.04)
Total for Light Pole 6,723,717 6,668,010 5,597,821 6,224,276 6,950,533 6,950,533
TOTAL 37,010,051 34,060,575 34,950,615 38,604,053 54,991,028 52,338,287

GST @ 18% 6,661,809 6,130,903 6,291,111 6,948,729 9,898,385 9,420,892

GRAND TOTAL 43,671,860 40,191,478 41,241,726 45,552,782 64,889,413 61,759,178

Note:
5% Buffer Qty is consider for all activities
Reinforcement 4kg/Sqm is consider for pathway and Drive way 1

Page 47 of 82
Bagmane Luxor Page 48 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects
Amount Remarks Rate Amount

Considered the Proj ref WO


quoted rates 4500000983,sl no 330

5,315,874 6,000 4,429,895

Considered the WO/BSC/LYNX/BCBP/7


quotation for M 9,SL NO 4.
2,159,238 sand 1,450 1,739,386

Existing Neon Capitol


rate.

553,737 95 701,400

Existing Neon Proj ref WO


rate. 4500000983,sl no 340

569,341 75 329,734

Existing Neon Proj ref WO


rate. 4500000671,sl no 1040

579,594 150 671,344

Existing Neon Proj ref WO


491,718 16,500 487,288
rate. 4500000671,sl no 120

Page 48 of 82
Bagmane Luxor Page 49 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects

Considered the Proj ref WO


330,077 quoted rates 756.6 693,712 4500001127,sl no 380

Considered the Proj ref WO


1,359,893 quoted rates 3,783 714,510 4500001127,sl no 380

11,359,472 9,767,271

Considered the Proj ref WO


quoted rates 4500000983,sl no 330

287,671 6,000 287,671

Considered the WO/BSC/LYNX/BCBP/7


quoted rates 9,SL NO 4.
131,927 1,450 106,275

Satya sundar Capitol


rates in Neon

35,959 95 45,548

Satya sundar Proj ref WO


31,931 16,500 31,644
rates in Neon 4500000671,sl no 120

Page 49 of 82
Bagmane Luxor Page 50 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects
Satya sundar Since rate Rs.
rates in Neon 1050/sqm in previous
WO 4500000983,Sl no
510.We have
211,194 980 215,145 considered Rs.980.

Satya sundar WO 4500000983,sl


rates in Neon no610.
298,514 450 230,513

Satya sundar WO 4500001315,sl no


rates in Neon 50

233,772 4,500 210,605

Existing Proj ref WO


pushpagiri rates 4500002644,sl no 20

2,367,878 3,783 2,367,878

Considered the WO 45000001127,sl no


216,211 quoted rates 695 417,528 390

3,815,057 3,912,806

Considered the WO 4500001127 , sl no


quoted rates 130.

307,350 1,700 338,239

Considered the WO 4700000301, sl no


quoted rates 60,Incl in cement 1:15.
1,806,334 3,800 1,374,188

2,113,683 1,712,427

Page 50 of 82
Bagmane Luxor Page 51 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects
Satya sundar WO 4700000301,sl no
rates in Neon 70

332,646 5,600 319,660

Satya sundar WO 4500001315,sl no


rates in Neon 90.

862,415 1,750 665,958

1,195,061 985,618

Satya sundar WO 4500000983,sl no


rates in Neon 340

54,427 75 31,521

Satya sundar Proj ref WO


328,876 757 328,052
rates in Neon 4500001127,sl no 380
383,302 359,573

Satya sundar WO 4500001315,sl no


rates in Neon 110.

100,050 980 101,922

Satya sundar WO 4500000983,sl


rates in Neon no610.
60,607 450 46,801

Page 51 of 82
Bagmane Luxor Page 52 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects

Considered the Proj ref WO


1,047,070 quoted rates 1,135 2,200,593 4500001127,sl no 380

Considered the Proj ref WO


1,296,156 quoted rates 3,783 681,022 4500001127,sl no 380

Considered the WO 45000001127,sl no


467,230 quoted rates 1,043 706,127 390

Considered the WO 45000001127,sl no


2,913,620 quoted rates 3,476 1,250,339 390

Considered the WO 45000001127,sl no


quoted rates 390

287,042 348 739,079

Considered the Proj ref WO


quoted rates 4500000983,sl no
549,incl of 2 coat putty

358,682 180 322,813

Satya sundar WO 4500000983,sl


rates in Neon no610.
335,139 450 452,890

6,865,596 6,501,586

Page 52 of 82
Bagmane Luxor Page 53 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects

Considered the WO 45000001127,sl no


17,256 quoted rates 695 33,323 390

Considered the Proj ref WO


2,911 quoted rates 3,783 30,586 4500001127,sl no 380

Satya sundar WO 45000001127,sl no


7,580 3,476 6,947
rates in Neon 390

Considered the WO
618,211 quoted rates 2,260 221,814 /BSC/LYNX/BCBP/58,sl
no 1.15.1

Page 53 of 82
Bagmane Luxor Page 54 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects

Considered the Proj ref WO


798,073 quoted rates 3,783 372,730 4500001127,sl no 380

Considered the WO
318,017 quoted rates 2,260 114,105 /BSC/LYNX/BCBP/58,sl
no 1.15.1
Considered the WO 45000001127,sl no
93,197 quoted rates 3,476 39,994 390

Satya sundar WO 45000001127,sl no


8,838 695 17,066
rates in Neon 390
Considered the Proj ref WO
quoted rates 4500000983,sl no 490

996,674 120,000 996,674

2,860,758 1,833,239

Page 54 of 82
Bagmane Luxor Page 55 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects

Satya sundar WO 45000001127,sl no


550,316 3,476 504,390
rates in Neon 390
Satya sundar WO 45000001127,sl no
181,259 521 166,133
rates in Neon 390
Satya sundar WO 45000001127,sl no
878,325 3,476 805,025
rates in Neon 390

Satya sundar WO 45000001127,sl no


53,759 3,476 49,272
rates in Neon 390
Satya sundar WO 45000001127,sl no
35,839 521 32,848
rates in Neon 390

Considered the Proj ref WO


63,580 quoted rates 3,783 33,406 4500001127,sl no 380

Satya sundar WO 4500000983,sl


rates in Neon no610.
19,334 450 26,127

Satya sundar WO 45000001127,sl no


13,221 695 12,117
rates in Neon 390

Page 55 of 82
Bagmane Luxor Page 56 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects
Satya sundar WO 45000001127,sl no
rates in Neon 390

256,696 3,476 235,273

Existing WO 4500002644.sl no
pushpagiri rates 190

185,672 298 185,672

2,238,000 2,050,263

Satya sundar WO 4700000301,sl no


14,538 5,600 13,971
rates in Neon 70

Considered the WO 4500001287,sl no


10,478 quoted rates 475 7,900 20

Satya sundar WO 4500001127 ,Sl no


6,231 16,500 6,175
rates in Neon 10
111,200 800 111,200
142,447 139,246

Page 56 of 82
Bagmane Luxor Page 57 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects

Satya sundar WO 4700000301,sl no


29,517 5,600 28,365
rates in Neon 70

Considered the WO 4500001287,sl no


31,911 quoted rates 475 24,060 20

Satya sundar WO 4500001127 ,Sl no


12,650 16,500 12,536
rates in Neon 10

Satya sundar WO 45000001127,sl no


42,688 3,476 39,126
rates in Neon 390

Page 57 of 82
Bagmane Luxor Page 58 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects

Satya sundar WO 45000001127,sl no


192,098 3,476 176,066
rates in Neon 390
225,120 800 225,120
533,985 505,273

Considered Taurus 2 rate


Bagmane rates
189,800 4,700 189,800

Considered Taurus 2 rate


Bagmane rates
146,324 8,000 146,324

Considered WO 4500002644,sl no
Bagmane rates 130.
1,794,128 385 1,794,128

Considered WO 4500001287,sl no
Bagmane rates 20
1,665,825 475 1,665,825

Considered Proj ref WO


Bagmane rates 4500000983,sl no 490

609,783 120,000 609,783

Considered
Bagmane rates

206,679 180 206,679

Considered WO 4700000301,sl no
Bagmane rates 70

1,537,521 5,600 1,537,521

Proj ref WO
120
4500002644,sl no 260
Proj ref WO
240
4500002644,sl no 260

Page 58 of 82
Bagmane Luxor Page 59 External Development Qty For Luxor 22-08-2019

Existing rates of Remarks


Satya Sundar existing in
Pushpagiri in various
Neon
projects
Proj ref WO
240
4500002644,sl no 260

Proj ref WO
120
4500002644,sl no 260
Proj ref WO
140
4500002644,sl no 270
Proj ref WO
140
4500002644,sl no 280

Proj ref WO
130
4500002644,sl no 320
Proj ref WO
160
4500002644,sl no 330
Proj ref WO
160
4500002644,sl no 340

Proj ref WO
150
4500002644,sl no 350
Proj ref WO
300
4500002644,sl no 360
Proj ref WO
300
4500002644,sl no 370

Proj ref WO
300
4500002644,sl no 380
Proj ref WO
600
4500002644,sl no 390
Proj ref WO
600
4500002644,sl no 410

Proj ref WO
100
4500002644,sl no 410
Proj ref WO
200
4500002644,sl no 420
Proj ref WO
200
4500002644,sl no 430
Proj ref WO
39
4500002644,sl no 440
Proj ref WO
180
4500002644,sl no 450
335
WO 4500001315,sl no
10
- 7,500

6,150,059 6,150,059
37,657,421 33,917,361

6,778,336 6,105,125
44,435,756 40,022,486

Page 59 of 82
PROJECT: BAGMANE LUXOR
SUMMARY SHEET

Sl no Description Unit Material Code Qty Remarks


1 Drive way
Quarry Dust cum 1,199.58
HDPE Sheet Sqm 7,383.16
RCC Concrete cum 738.32
Groove cutting Rmt 4,475.63
Reinforcement MT 29.53
Band

400mm Sqm GR-02/02- 30MM THICK 188.87


POLISHED STEEL GREY GRANITE
200mm Rmt 916.88

Infill Power float Treatment Sqm PV-01/01-100MM BROOM 4,396.45


FINISHED CONCRETE

2 Path way
Quarry Dust cum 73.29
HDPE Sheet Sqm 479.45
RCC Concrete cum 47.95
Reinforcement MT 1.92
150mm Blockwork sqm 219.54
waterproofing Plastering for
sqm 512.25
Seater Blockwork
Screed concrete Cum 46.80
Band

GR-01/01-20MM THICK
200mm Rmt RIVERWASH STEEL GREY 600.59
GRANITE.

Infill Sqm GR-02/01- 30MM THICK 625.93


RIVERWASH STEEL GRAY GRANITE

3 Lawn area
Cinder cum 361.63
Aggregate cum 198.96
screed for sloping rectification cum 274.56
3 Flagstone
RCC Concrete cum 57.08

4 Middle Plaza

Band Rmt GR-01/02- 20MM THICK 433.59


POLISHED STEEL GREY GRANITE

Page 60 of 82
PROJECT: BAGMANE LUXOR
SUMMARY SHEET

Sl no Description Unit Material Code Qty Remarks

PV-01/01-100MM BROOM
Infill Power float Treatment Sqm 420.28
FINISHED CONCRETE

5 Flag stone Sqm GR-01/04- 60MM thick Flag Stone 282.37

6 FTP Band Sqm GR-01/04- 60MM thick Flag Stone 98.18

7 Planter wall in podium

Coping Rmt GR-02/01- 30MM THICK 1,330.08


RIVERWASH STEEL GRAY GRANITE

Coping Sqmt GR-02/01- 30MM THICK 138.92


RIVERWASH STEEL GRAY GRANITE

GR-01/01-20MM THICK
Cladding Sqmt RIVERWASH STEEL GREY 292.67
GRANITE.

GR-01/01-20MM THICK
Cladding Rmt RIVERWASH STEEL GREY 640.08
GRANITE.

GR-01/01-20MM THICK
Skirting Rmt RIVERWASH STEEL GREY 1,553.34
GRANITE.
Texture Paint Sqmt TP-01/01-TEXTURE PAINT 1,006.42
Plaster Paint Sqmt PT-01/01- PLASTER PAINT 895.37

Arrival Plaza steps PV-01/02- 20MM THICK SIRA


GRAY LEATHER FINISH
Treads Sqmt 145.11
Riser Rmt 318.63
Landing Sqmt 231.60

Band at Steps Rmt GR-01/02- 20MM THICK Polished 24.55


steel Gray Granite
150mm Blockwork Sqmt 104.00
waterproofing Plastering for
Sqmt 104.00
Seater Blockwork
8 Planter wall outside

GR-02/01- 30MM THICK


Coping Rmt 515.29
RIVERWASH STEEL GRAY GRANITE

Cladding Sqmt PT-01/01- PLASTER PAINT 872.28

GR-01/01-20MM THICK
Skirting Rmt RIVERWASH STEEL GREY 421.83
GRANITE.
9 Planter wall at cascade steps

Page 61 of 82
PROJECT: BAGMANE LUXOR
SUMMARY SHEET

Sl no Description Unit Material Code Qty Remarks

GR-02/01- 30MM THICK


Coping Sqmt 9.54
RIVERWASH STEEL GRAY GRANITE

GR-01/01-20MM THICK
Cladding Sqmt RIVERWASH STEEL GREY 18.18
GRANITE.

GR-01/01-20MM THICK
Skirting Rmt RIVERWASH STEEL GREY 14.44
GRANITE.
Cladding outside Sqmt PT-01/01- PLASTER PAINT 12.52
10 Cascade Sloping wall

GR-02/01- 30MM THICK


Coping Rmt 11.61
RIVERWASH STEEL GRAY GRANITE

GR-01/01-20MM THICK
Cladding inside Sqmt RIVERWASH STEEL GREY 2.32
GRANITE.
Cladding outside Sqmt PT-01/01- PLASTER PAINT 13.23

11 Cascade wall-1,2, &3 at arrival


plaza

GR-01/02- 20MM THICK


Coping Rmt 8.86
POLISHED STEEL GREY GRANITE

Cladding outside Sqmt GR-02/04- 40MM THICK STEEL 24.62


GREY SARRATED GRANITE
Proposed 200mm wide clading Sqmt GR-02/04- 40MM THICK STEEL 14.47
GREY SARRATED GRANITE
Vertical fins KG 564.06
Water Body 1,2,&3 at arrival
12
plaza

GR-01/02- 20MM THICK


Base Sqmt 2.00
POLISHED STEEL GREY GRANITE

Cladding inside Sqmt GR-01/03- 6MM BIZZASA TILE 10.21

Coping Rmt GR-01/02- 20MM THICK 4.88


POLISHED STEEL GREY GRANITE
13 Cascade Steps

Tread Sqmt 14.18


GR-01/02- 20MM THICK
Riser Rmt POLISHED STEEL GREY GRANITE 63.00
Lower water Tough 1,2,&3 at
14
arrival plaza
Base Sqmt GR-01/03- 6MM BIZZASA TILE 6.97

Page 62 of 82
PROJECT: BAGMANE LUXOR
SUMMARY SHEET

Sl no Description Unit Material Code Qty Remarks


Cladding inside
Upto water Level Sqmt GR-01/03- 6MM BIZZASA TILE 8.80

GR-01/01-20MM THICK
Above water Level Sqmt RIVERWASH STEEL GREY 2.26
GRANITE.

Coping Rmt GR-01/02- 20MM THICK 14.95


POLISHED STEEL GREY GRANITE
15 Seating Area at Steps

GR-02/01- 30MM THICK


Coping Sqmt 27.36
RIVERWASH STEEL GRAY GRANITE

GR-01/01-20MM THICK
Cladding Sqmt RIVERWASH STEEL GREY 24.32
GRANITE.

GR-01/01-20MM THICK
Skirting Rmt RIVERWASH STEEL GREY 60.79
GRANITE.
15 Water Body South side
Base Sqmt GR-01/03- 6MM BIZZASA TILE 65.73
Cladding inside
Upto water Level Sqmt GR-01/03- 6MM BIZZASA TILE 11.78

GR-01/01-20MM THICK
Above water Level Sqmt RIVERWASH STEEL GREY 4.91
GRANITE.
16 Water Body Drop off area
Base Sqmt GR-01/03- 6MM BIZZASA TILE 25.43
Cladding inside
Upto water Level Sqmt GR-01/03- 6MM BIZZASA TILE 19.69

GR-01/01-20MM THICK
Above water Level Sqmt RIVERWASH STEEL GREY 4.34
GRANITE.

Coping Rmt GR-02/01- 30MM THICK 8.09


RIVERWASH STEEL GRAY GRANITE
Cascade Cladding Sqmt GR-02/04- 40MM THICK STEEL 59.43
GREY SARRATED GRANITE

Coping spill Edge Rmt GR-01/02- 20MM THICK 19.24


POLISHED STEEL GREY GRANITE
17 Drain
Aco Drain Rmt 623.06
18 Mild steel Rmt MS-01/01-MILD STEEL 40.38
19 Mild steel Sqmt MS-01/01-MILD STEEL 18.29

Page 63 of 82
PROJECT: BAGMANE LUXOR
SUMMARY SHEET

Sl no Description Unit Material Code Qty Remarks


20 Trellis

Coping Rmt GR-02/01- 30MM THICK 82.05


RIVERWASH STEEL GRAY GRANITE

GR-01/01-20MM THICK
Cladding Rmt RIVERWASH STEEL GREY 37.07
GRANITE.

GR-01/01-20MM THICK
Cladding Sqmt RIVERWASH STEEL GREY 22.22
GRANITE.

GR-01/01-20MM THICK
Skirting Rmt RIVERWASH STEEL GREY 75.84
GRANITE.
21 Pedestrian Ramp

Coping Sqmt GR-02/01- 30MM THICK 8.83


RIVERWASH STEEL GRAY GRANITE
Cladding Sqmt TP-01/01-TEXTURE PAINT 58.06

Band Rmt GR-01/02- 20MM THICK 17.43


POLISHED STEEL GREY GRANITE
Infill Sqmt PV-01/02- 20MM THICK SIRA 67.69
GRAY LEATHER FINISH
22 Pergola
Footing concrete Cum 2.49
Footing Shuttering Sqmt 16.63
Column KG 285.81
Lower Beam KG 2,058.19
Primary Beam KG 2,451.64
Upper Beam KG 2,426.36
Aluminium channel or wooden
KG 519.57
Members

Seater Top material Sqmt GR-02/01- 30MM THICK 4.20


RIVERWASH STEEL GRAY GRANITE
SS wire Rmt 4,660.07
SS Bracket Nos 3,507
MS Support for SS wire Angle at KG 2,620.46
Top
MS Support for SS wire Channel KG 2,461.07
at Bottom
23 Light pole
Footing concrete Cum 5.07
Footing Shuttering Sqmt 50.65

Page 64 of 82
PROJECT: BAGMANE LUXOR
SUMMARY SHEET

Sl no Description Unit Material Code Qty Remarks


Reinforcement MT 0.76

GR-01/02- 20MM THICK


Coping Sqmt 11.26
POLISHED STEEL GREY GRANITE

GR-01/02- 20MM THICK


Cladding Sqmt 50.65
POLISHED STEEL GREY GRANITE

Page 65 of 82
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS

LEGEND: PAVING FINISH TEXTURE PAINT


PV-01/01-100MM BROOM FINISHED CONCRETE TR-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY
MS-01/01-MILD STEEL
GRANITE.
GR-02/01- 30MM THICK RIVERWASH STEEL GRAY
GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%

Sl no Description Material Unit Nos L B D Qty Qty+5% Buffer Remarks

1 Quarry Dust

1.1 Driveway Location in all Podium

1142.454 1199.58

1.2 Pathway Location in all Podium

69.8028 73.29

2 HDPE Sheet 300 Micron

2.1 Driveway Location in all Podium

7031.58 7383.16
2.2 Pathway Location in all Podium

456.62 479.45

3 RCC concrete

3.1 Driveway Location in all Podium


Reinforcement Calculation

703.158 738.32 7031.58 28.12632


3.2 Pathway Location in all Podium

456.62 1.82648
45.662 47.95 33

3.3 Below Flag Stone


Cum 54.3639 57.08

4 Aggregate

Cum 189.4895 198.96


5 Screed for slope rectification

Cum 261.4832 274.56

6 Cinder

Cum 344.408 361.63

7 GeoFabric 150 GSM

Sqm 3444.08 3616.28

8 50mm Sand Filling

Page 66 OF 82
Sl no Description Material Unit Nos L B D Qty Qty+5% Buffer Remarks

Cum 172.204 180.81

9 150mm Blockwork

Sqm 209.082 219.54

10 Screed concrete

44.5725 46.80

Groove cutting

Rmt 4262.504 4475.63

GR-02/02- 30MM THICK


Drive way Band POLISHED STEEL GREY
GRANITE

Sqm 179.88 188.87

Drive way infront of the north block


200mm Band

Drive way infront of the South Block


200mm Band

Rmt 873.22 916.88

PV-01/01-100MM BROOM
Infill
FINISHED CONCRETE

Sqm 4187.10 4396.45

GR-01/01-20MM THICK
Pathway Band 200mm RIVERWASH STEEL GREY
GRANITE.

Rmt 571.987 600.59

GR-02/01- 30MM THICK


Infill RIVERWASH STEEL GRAY
GRANITE

sqm 596.12 625.93

Middle plaza

GR-01/02- 20MM THICK


Band POLISHED STEEL GREY
GRANITE

Rmt 412.94 433.59

Infill PV-01/01-100MM BROOM


FINISHED CONCRETE

Sqm 400.27 420.28

GR-01/04- 60MM thick Flag


Flag Stone
Stone
Sqm 268.92 282.37

GR-01/04- 60MM thick Flag


FTP Band
Stone
Sqm 93.506 98.18

Page 67 OF 82
Sl no Description Material Unit Nos L B D Qty Qty+5% Buffer Remarks

Page 68 OF 82
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS

LEGEND: PAVING FINISH TEXTURE PAINT


PV-01/01-100MM BROOM FINISHED CONCRETE TP-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY
MS-01/01-MILD STEEL
GRANITE.
GR-02/01- 30MM THICK RIVERWASH STEEL GRAY
GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%

Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY
GRANITE

Rmt 1266.74 1330.08

GR-02/01- 30MM THICK


Seating area at arrival plaza RIVERWASH STEEL GRAY
GRANITE
Sqm 132.3065 138.92

GR-01/01-20MM THICK
Cladding RIVERWASH STEEL GREY Sqm
GRANITE.

Sqm 278.7349 292.67

GR-01/01-20MM THICK
Cladding RIVERWASH STEEL GREY Rmt
GRANITE.

Rmt 609.6 640.08

GR-01/01-20MM THICK
Skirting RIVERWASH STEEL GREY
GRANITE.

Rmt 1479.37 1553.34

Texture paint TP-01/01-TEXTURE PAINT

Sqmt 732.57 769.20

Plaster Paint PT-01/01- PLASTER PAINT

Rmt 852.7365 895.37

Steps at arrival plaza PV-01/02- 20MM THICK


SIRA GRAY LEATHER FINISH

Tread

sqm 138.1965 145.11


Landing

Page 69 OF 82
Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

sqm 220.567 231.60


Riser

sqm 303.46 318.63

GR-01/02- 20MM THICK


Band at arrival plaza
Polished steel Gray Granite

2 3.1 6.2
2 4 8
1 2.21 2.21
1 6.97 6.97

Rmt 23.38 24.55

Texture Paint for staircase waist TP-01/01-TEXTURE PAINT


slab for arrival plaza
Sqm 1 3.32 10.34 34.3288
1 3.1 10.34 32.054
1 3.75 10.34 38.775
Landing slab 1 10.34 2.86 29.5724
1 4.52 10.34 46.7368
1 4.3 10.34 44.462

Sqm 225.929 237.23

150mm Blockwork

99.05 104.00

8 waterproof Plastering around the


lawn area

Sqm 487.858 512.25

Plastering for Seater Blockwork

99.05 104.00

Page 70 OF 82
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS
LEGEND: PAVING FINISH TEXTURE PAINT
PV-01/01-100MM BROOM FINISHED CONCRETE TP-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY
MS-01/01-MILD STEEL
GRANITE.
GR-02/01- 30MM THICK RIVERWASH STEEL GRAY
GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%

Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY
GRANITE

Rmt 490.75 515.29

Cladding PT-01/01- PLASTER PAINT Sqm

Sqm 830.7404 872.28

GR-01/01-20MM THICK
Skirting RIVERWASH STEEL GREY Rmt
GRANITE.

Rmt
401.74 421.83
Planter Box at cascade Steps

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY
GRANITE

Sqm 9.09 9.54


GR-01/01-20MM THICK
Cladding RIVERWASH STEEL GREY
GRANITE.

Sqm 17.311 18.18


GR-01/01-20MM THICK
Skirting RIVERWASH STEEL GREY
GRANITE.

Rmt 13.75 14.44

Cladding outside PT-01/01- PLASTER PAINT Sqm 4 4.2 0.71 11.928 12.52

Cascade sloping wall at arrival plaza

GR-02/01- 30MM THICK


Coping sloped wall RIVERWASH STEEL GRAY Rmt
GRANITE

11.06 11.61

Cladding outside PT-01/01- PLASTER PAINT Sqm

12.6027 13.23

Page 71 OF 82
Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

GR-01/01-20MM THICK
Cladding Inside RIVERWASH STEEL GREY Sqm
GRANITE.

2.211 2.32
Cascade wall-1,2, &3 at arrival plaza

GR-01/02- 20MM THICK


Coping sloped wall POLISHED STEEL GREY
GRANITE

Rmt 8.44 8.86

GR-02/04- 40MM THICK


Cladding outside STEEL GREY SARRATED
GRANITE
Sqm 23.4508 24.62

GR-02/04- 40MM THICK


Proposed 200mm wide clading STEEL GREY SARRATED Sqm
GRANITE
13.785 14.47

Vertical fins (40*60*3mm MS Box


Rmt
Section)
124.64 130.87 4.31 564.0583

Water Body 1,2,&3 at arrival plaza

GR-01/02- 20MM THICK


Base POLISHED STEEL GREY
GRANITE

Sqm 1.90 2.00

GR-01/03- 6MM BIZZASA


Cladding Inside TILE

Sqm 9.726 10.21

GR-01/02- 20MM THICK


Coping POLISHED STEEL GREY Rmt 3 1.55 4.65 4.88
GRANITE

Cascade Steps

GR-01/02- 20MM THICK


Treads and Riser POLISHED STEEL GREY
GRANITE
Tread
Sqm 35 1.5 0.225 11.8125
3 1.5 0.375 1.6875

13.5 14.18

Riser 40 1.5 60 63.00

Lower Water Tough 1,2,&3 at arrival


plaza

GR-01/03- 6MM BIZZASA


Base TILE

Sqm 6.64 6.97

Cladding Inside

Sqm 8.38 8.80

Sqm 2.148 2.26

Page 72 OF 82
Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

GR-01/02- 20MM THICK


Coping POLISHED STEEL GREY
GRANITE

Rmt 14.24 14.95


Seating aea

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY Sqm
GRANITE
Sqm 26.05275 27.36

GR-01/01-20MM THICK
Cladding RIVERWASH STEEL GREY Sqm
GRANITE.

23.158 24.32
GR-01/01-20MM THICK
Skirting RIVERWASH STEEL GREY Rmt
GRANITE.
Rmt 57.895 60.79

Water body south side

GR-01/03- 6MM BIZZASA


Base Sqm 1 62.6 62.6 65.73
TILE

Clading

11.22 11.78

4.674 4.91

Water body Drop off area

GR-01/03- 6MM BIZZASA


Base
TILE

24.22 25.43

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY Rmt 1 7.7 7.7 8.09
GRANITE

Clading

GR-01/03- 6MM BIZZASA


Upto water level TILE Sqm

18.7508 19.69

GR-01/01-20MM THICK
Above water level RIVERWASH STEEL GREY Sqm
GRANITE.
4.1359 4.34
GR-02/04- 40MM THICK
Cascade Clading STEEL GREY SARRATED
GRANITE
1 11.32 5 56.6 59.43

Coping GR-01/02- 20MM THICK


POLISHED STEEL GREY
GRANITE
Spil Edge Rmt 1 18.32 18.32 19.24

Drain
Aco drain

Rmt 593.39

Page 73 OF 82
Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

593.39 623.06

Mild steel

Railing MS-01/01-MILD STEEL

Sqm 17.4195 18.29

Rmt 38.46 40.38

Page 74 OF 82
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS
LEGEND: PAVING FINISH TEXTURE PAINT
PV-01/01-100MM BROOM FINISHED CONCRETE TP-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY
MS-01/01-MILD STEEL
GRANITE.
GR-02/01- 30MM THICK RIVERWASH STEEL GRAY
GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%

Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY
GRANITE

Rmt 78.14 82.05

GR-01/01-20MM THICK
Cladding RIVERWASH STEEL GREY Sqm
GRANITE.
Sqm 21.1624 22.22

GR-01/01-20MM THICK
Cladding RIVERWASH STEEL GREY Rmt
GRANITE.

Rmt 35.3 37.07

GR-01/01-20MM THICK
Skirting RIVERWASH STEEL GREY
GRANITE.

Rmt 72.23 75.84

Page 75 OF 82
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS
LEGEND: PAVING FINISH TEXTURE PAINT
PV-01/01-100MM BROOM FINISHED CONCRETE TP-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY
GRANITE. MS-01/01-MILD STEEL

GR-02/01- 30MM THICK RIVERWASH STEEL GRAY


GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%
Sl no Description Material Unit Nos L B D Qty 5% buffer Remarks

GR-02/01- 30MM THICK


Coping RIVERWASH STEEL GRAY Sqm 1 33.64 0.25 8.41 8.83
GRANITE

Cladding TP-01/01-TEXTURE PAINT Sqm


55.30 58.06

GR-01/02- 20MM THICK


Ramp Band POLISHED STEEL GREY Rmt
GRANITE

16.6 17.43

PV-01/02- 20MM THICK


Infill Sqm
SIRA GRAY LEATHER FINISH

64.462 67.69

Page 76 OF 82
PROJECT: BAGMANE LUXOR
EXTERNAL DEVELOPMENT WORKS
LEGEND: PAVING FINISH TEXTURE PAINT
PV-01/01-100MM BROOM FINISHED CONCRETE TP-01/01-TEXTURE PAINT
PV-01/02- 20MM THICK KOTA STONE PT-01/01- PLASTER PAINT
PV-01/03- 75MM THICK INTERLOCKING STONE
GRANITE FINISH MILD STEEL
GR-01/01-20MM THICK RIVERWASH STEEL GREY MS-01/01-MILD STEEL
GRANITE.
GR-02/01- 30MM THICK RIVERWASH STEEL GRAY
GRANITE

GR-01/02- 20MM THICK POLISHED STEEL GREY GRANITE

GR-02/02- 30MM THICK POLISHED STEEL GREY GRANITE

GR-01/03- 6MM BIZZASA TILE

GR-01/04-60MM THICK FLAG STONE

GR-02/04- 40MM THICK STEEL GREY SARRATED GRANITE

5%

Sl no Description Material Unit Nos L B D Qty 5% buffer Kg/M Total weight

Footing cum

2.376 2.49

Footing Shuttering Sqm

15.84 16.63

Column SHS 450*450 Rmt


96.525 101.35 2.82 285.810525

Lower beam ISMC 125*130 Rmt

149.632 157.11 13.1 2058.18816

Primary Beam RHS 145*82*5.4mm Rmt

130.15 136.66 17.94 2451.63555

Upper Beam RHS 120*60*5.4mm


165.65 173.93 13.95 2426.358375

Chemical Anchoring Nos

132 138.60
50*25mm Aluminium
Aluminium channel or wood member Rmt
channel

3277 3440.85 0.151 519.56835

GR-02/01- 30MM THICK


Seater area RIVERWASH STEEL GRAY
GRANITE
11 0.2 2.2
2 0.9 1.8

4 4.20

SS wire vertical at Basement

Rmt 4660.07

Ms support for SS wire at top of


Angle size 80*80*6mm

Rmt 340.01 357.0105 7.34 2620.45707

Ms support for SS wire at Bottom of


Channel size 80*40*4.2mm

Page 77 OF 82
Sl no Description Material Unit Nos L B D Qty 5% buffer Kg/M Total weight
Rmt 333.41 350.0805 7.03 2461.065915

SS Brackets

Nos 3340 3507

Light pole
Footing cum

4.824 5.07

Footing Shuttering Sqm

48.24 50.65

Chemical Anchoring Nos

268 281.40

GR-01/02- 20MM THICK POLISHED


STEEL GREY GRANITE

Coping

Sqm 10.72 11.26

Cladding

Sqm 48.24 50.65

Page 78 OF 82
COMMENTARY LIST
Sl no Description Instructed Discussion Date

1 5% Buffer Qty is consider for all activities

All planter wall Structure work is executed by civil Instructed by


2 vendor not consider in this package. Anand (Bagmane) Dated on 13-08-2019

Reinforcement single matt layer of 8mm dia spacing


Instructed by
3 250mm Dia C/C (4 kg per sqm) for drive way and Dated on 20-08-2019
pathway. Anand (Bagmane)

4 Seater area one side


Blockwork
Plastering Instructed by
Anand (Bagmane) Dated on 20-08-2019
Inside Quarry dust filling
Screed concrete on top

Instructed by
5 Arrival plaza steps sides Texture paint is consider Dated on 20-08-2019
Anand (Bagmane)

Pergola Seater area material name consider GR-


6
02/01- 30MM THICK RIVERWASH STEEL GRAY GRANITE

7 Lightpoles
Concrete
Shuttering
Reinforcement
Instructed by
Coping -GR-01/02- 20MM THICK POLISHED STEEL GREY Anand (Bagmane) Dated on 20-08-2019
GRANITE
Clading -GR-01/02- 20MM THICK POLISHED STEEL
GREY GRANITE

Instructed by
8 Vertical fins- 40*60*5mm MS BOX section is consider Dated on 20-08-2019
Anand (Bagmane)

9 MS support for SS wire

MS Support for SS wire Angle at Top 80*80*8mm Dated on 13-08-2019


Instructed by
Anand (Bagmane)

Page 79 OF 82
COMMENTARY LIST
Sl no Description Instructedby
Instructed Discussion Date
MS Support for SS wire Channel at Bottom Anand (Bagmane)
80*40*3.2mm
SS wire spacing consider 200mm C/C

10 Below Flag stone

Instructed by
RCC concrete of 150mm thickness Anand (Bagmane) Dated on 20-08-2019

Bostik Moisture Epoxy coating for granite base and Instructed by


11 cladding consider 0.3 kg/sqmt Anand (Bagmane) Dated on 20-08-2019

Instructed by
12 Groove cutting consider B/W the Bands in Driveway Dated on 20-08-2019
Anand (Bagmane)

13 Plaster paint outside at STp area Ht consider 4.55m Instructed by Dated on 13-08-2019
Anand (Bagmane)

Page 80 OF 82
External Drawing Register

BAGMANE LUXOR CAPITAL

DRAWING REGISTER - EXTERNAL DEVELOPMENT

LIST OF DRAWINGS / DOCUMENTS SPECIFIED IN THE SCOPE DRAWING RECEIPT STATUS


SL
REVISION NO. HARD COPY (PRINT OUT) ACAD SOFT COPY REMARKS
NO
DESCRIPTION DOC/DWG. NO.
STATUS RECEIVED DATE STATUS RECEIVED DATE

ACAD SOFT COPY


1 Luxor Capital-INDEX Sheet L-000 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


2 Luxor Capital-General Arrangement L-001 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


3 Luxor Capital-Site Series,Site Grading L-001SG R0 RECEIVED
26-07-2019

ACAD SOFT COPY


4 Luxor Capital-Site Series,Broad Grading Plan L-01G R0 RECEIVED
26-07-2019

ACAD SOFT COPY


5 Luxor Capital-Site Series,Broad Material Plan L-01M R0 RECEIVED
26-07-2019

ACAD SOFT COPY


6 Luxor Capital-Site Series,Broad Lineout Plan L-01L R0 RECEIVED
26-07-2019

ACAD SOFT COPY


7 Luxor Capital-Site Series,Lighting Plan L-01E R0 RECEIVED
26-07-2019

ACAD SOFT COPY


8 Luxor Capital-Coordination service plan L-01CS R0 RECEIVED
26-07-2019

ACAD SOFT COPY


9 Luxor Capital-Arrival Plaza General Arrangement Plan LD-100 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


10 Luxor Capital-Arrival Plaza Grading Plan-1 LD-100G1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


11 Luxor Capital-Arrival Plaza Grading Plan-2 LD-100G2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


12 Luxor Capital-Arrival Plaza Lineout Plan-1 LD-100L1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


13 Luxor Capital-Arrival Plaza Lineout Plan-2 LD-100L2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


14 Luxor Capital-Arrival Plaza Material Plan-1 LD-100M1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


15 Luxor Capital-Arrival Plaza Material Plan-2 LD-100M2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


16 Luxor Capital-Arrival Plaza Longitudinal Section A LD-100S1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


17 Luxor Capital-Arrival Plaza Longitudinal Section-B LD-100S2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


18 Luxor Capital-Arrival Plaza Longitudinal Section-C LD-100S3 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


19 Luxor Capital-Arrival Plaza Section-S3,S4,S5 LD-100S4 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


20 Luxor Capital-Arrival Plaza Section-S5a,S5B & S5C LD-100S5 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


21 Luxor Capital-Arrival Plaza Cascade wall Louver Details LD-100F R0 RECEIVED
26-07-2019

ACAD SOFT COPY


22 Luxor Capital-Arrival Plaza Trellis Planter Details LD-100TF R0 RECEIVED
26-07-2019

ACAD SOFT COPY


23 Luxor Capital-Dropoff Area Water Body-Grading,Material,Electrical,Lineout & Elevation E1 & E2. LD-150 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


24 Luxor Capital-Dropoff Area Water Body-Elevation3 & Section3 LD-150A R0 RECEIVED
26-07-2019

ACAD SOFT COPY


25 Luxor Capital-South Plaza General Arrangement Plan LD-200 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


26 Luxor Capital-South Plaza-Grading,Material,Electrical\ LD-200G R0 RECEIVED
26-07-2019

ACAD SOFT COPY


27 Luxor Capital-South Plaza-Lineout LD-200L R0 RECEIVED
26-07-2019

ACAD SOFT COPY


28 Luxor Capital-South Plaza General Arrangement Plan L-01G R0 RECEIVED
26-07-2019

498074679.xlsx Page 81of 82


External Drawing Register

BAGMANE LUXOR CAPITAL

DRAWING REGISTER - EXTERNAL DEVELOPMENT

LIST OF DRAWINGS / DOCUMENTS SPECIFIED IN THE SCOPE DRAWING RECEIPT STATUS


SL
REVISION NO. HARD COPY (PRINT OUT) ACAD SOFT COPY REMARKS
NO
DESCRIPTION DOC/DWG. NO.
STATUS RECEIVED DATE STATUS RECEIVED DATE

ACAD SOFT COPY


29 Luxor Capital-South Plaza Section S6,S7 & S8 LD-200s R0 RECEIVED
26-07-2019

ACAD SOFT COPY


30 Luxor Capital-North Plaza General Arrangement Plan LD-300 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


31 Luxor Capital-North Plaza-Grading Plan LD-300G R0 RECEIVED
26-07-2019

ACAD SOFT COPY


32 Luxor Capital-North Plaza-Lineout LD-300L R0 RECEIVED
26-07-2019

ACAD SOFT COPY


33 Luxor Capital-North Plaza-Section S1,S2,S1A & S15 LD-300s R0 RECEIVED
26-07-2019

ACAD SOFT COPY


34 Luxor Capital-Podium Level central Plaza General Arrangement Plan LD-400 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


35 Luxor Capital-Podium Level central Plaza-Grading material and lighting plan-1 LD-400G1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


36 Luxor Capital-Podium Level central Plaza-Grading material and lighting plan-2 LD-400G2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


37 Luxor Capital-Podium Level central Plaza-Lineout Plan-1 LD-400L1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


38 Luxor Capital-Podium Level central Plaza-Lineout Plan-2 LD-400L2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


39 Luxor Capital-Podium Level central Plaza-Section S16 & S17 LD-400S1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


40 Luxor Capital-Podium Level central Plaza-Section S18 LD-400S2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


41 Luxor Capital-Podium Level Semi covered Area General Arrangment LD-450 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


42 Luxor Capital-Podium Level Semi covered Area Grading ,Electrical and Material Plan LD-450G R0 RECEIVED
26-07-2019

ACAD SOFT COPY


43 Luxor Capital-Podium Level Semi covered Area Lineout Plan LD-450L R0 RECEIVED
26-07-2019

ACAD SOFT COPY


44 Luxor Capital-Podium Level Semi covered Area Section S17A & S17B LD-450S R0 RECEIVED
26-07-2019

ACAD SOFT COPY


45 Luxor Capital-Podium Level Pergola Details,Plan, Section and Elevation LD-500 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


46 Luxor Capital- Site series Section Lines LS-00 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


47 Luxor Capital- Site Section S1,S2, & S3 LS-01 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


48 Luxor Capital- Site Section S4,S5, & S6 LS-02 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


49 Luxor Capital- Site Section S7, S8 LS-03 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


50 Luxor Capital- Site Section S9, S10 LS-04 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


51 Luxor Capital- Site Section S11,S12 LS-05 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


52 Luxor Capital- Site Section S13,S14 LS-06 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


53 Luxor Capital- Site Section S15,S16, & S17 LS-07 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


54 Luxor Capital-Green Creeper wall Typical Detail LS-GW R0 RECEIVED
26-07-2019

ACAD SOFT COPY


55 Luxor Capital-Green Creeper wall Elevation-1 LS-GWE1 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


56 Luxor Capital-Green Creeper wall Elevation-2 LS-GWE2 R0 RECEIVED
26-07-2019

ACAD SOFT COPY


57 Luxor Capital-Green Creeper wall Elevation-3 LS-GWE3 R0 RECEIVED
26-07-2019