NOTICE Date: 29/10/2020

Site time should be 8:30 AM to 6.30 PM.


Given Targets should be achieved by individual
engineer at any way.
You can recruit new contractor for work
progresS.
Every plot target is 10 footing
per Day per Plot.
Plinth Beam target is 10
bay per Day per Plot.
Columns target of 10 columns per
Day per Plot.
Workmanship Error will be liability of the
Incharge.
Everyone should achieve target as
If target is not achieved their will beper Barchart.
deduction in salary
respective Incharge Engineers.
MHDCL Plot A,B,C, D
Incharge Mr. Dilip Gawade
QC Engineer Arjun Tanpure
-

Plot A & B

1) Tarique Aziz- Sr. Eng.


2) Aafaq Qadri Jr. Eng. -

3) Sagari Jr. Eng.


-

Plot C&D
1) M.S. Ansari Sr. Eng.
-

2) Pranav Ponde- Jr. Eng.


3) Jagdish Rathod- Jr. Eng.

By Order